Council planning record

Installation of shower pump, enclosure and associated works to front lightwell.

46 Colebrooke Row, London N1 8AF

FINAL DECISIONReference: P2026/0965/LBCLondon Borough of Islington

Last published check: 2 Oct 2026, 21:00. Check the council record for more recent changes.

Application location

46 Colebrooke Row, London N1 8AF

This record has no verified map location.

Application summary

Status
FINAL DECISION
Application type
Listed Building
Received
13 Apr 2026
Validated
5 May 2026
Determination deadline
16 Jun 2026
Local authority
London Borough of Islington

Application overview

Installation of shower pump, enclosure and associated works to front lightwell.

Proposal details

Reference
P2026/0965/LBC
Alternative references
PP-14851614_C
Ward
St Peter's & Canalside
Agent
McIntyre
UPRN
5300022200

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 2 of 2

DocumentPublishedAction
Please go to P2026/0964/FUL to view all drawings and documentsApplication Form13 Apr 2026View
dn finalDecision Notice Final25 Jun 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Press notice start date

    Published milestoneCouncil source
  6. Site notice date

    Published milestoneCouncil source
  7. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Site notice end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  12. Dispatch date

    Published milestoneCouncil source
  13. Decision date

    Published milestoneCouncil source
  14. Extension date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approve with conditions
dn final
Planning conditions
  1. 3 YEAR CONSENT PERIOD FOR LBC: The works hereby permitted shall be begun not later than three years from the date of this consent. REASON: To comply with the provisions of Section 18(1)(a) of the Planning (Listed Buildings and Conservation Areas) Act 1990 as amended by the Planning and Compulsory Purchase Act 2004 (Chapter 5).
  2. WORKS AND FINISHES (COMPLIANCE): All new external and internal works and finishes and works of making good to the retained fabric shall match the existing adjacent work with regard to the methods used and to material, colour, texture and profile. All such works and finishes shall be maintained as such thereafter. REASON: In order to safeguard the special architectural or historic interest of the heritage asset.
  3. LISTED BUILDING CONSENT ONLY: This consent relates solely to listed building matters. Should it become necessary to make alterations to the consented scheme in order to comply with other legislation, such as Building Regulations, a further consent may be required. Such a consent should be sought and obtained prior to the relevant works being undertaken.
  4. Location Plan dated 12-April-2026; LL1577 LG GA Revision A (Proposed Lower Ground Floor); 1577 00 TH ELE Revision A (Proposed Townhouse Elevations); Design and Access Statement dated 8 June 2026; Sustainable Design and Construction Statement dated April 2026.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.