Remodelling of existing single storey rear extension to include new timber window and door, timber cladding, green roof and rooflights. Installation of enlarged rear window at first floor level and PV solar panels to main rear roofslope.
15 Ferntower Road, London, N5 2JE
FINAL DECISIONReference: P2026/0928/FULLondon Borough of Islington
Last published check: 3 Oct 2026, 20:29. Check the council record for more recent changes.
Application location
15 Ferntower Road, London, N5 2JE
This record has no verified map location.
Application summary
Status
FINAL DECISION
Application type
Full Planning (Householder)
Received
8 Apr 2026
Validated
8 Apr 2026
Determination deadline
2 Jun 2026
Local authority
London Borough of Islington
Application overview
Remodelling of existing single storey rear extension to include new timber window and door, timber cladding, green roof and rooflights. Installation of enlarged rear window at first floor level and PV solar panels to main rear roofslope.
Proposal details
Reference
P2026/0928/FUL
Alternative references
PP-14839220
Ward
Mildmay
Agent
Mrs Aurore Baulier
UPRN
5300033134
Sign in to view all collected council fields and recorded changes.
3 YEAR CONSENT PERIOD: The development hereby permitted shall be begun not later than the expiration of three years from the date of this permission. REASON: To comply with the provisions of Section 91(1)(a) of the Town and Country Planning Act 1990 as amended by the Planning and Compulsory Purchase Act 2004 (Chapter 5).
DRAWING AND DOCUMENT NUMBERS: The development hereby approved shall be carried out in accordance with the following approved plans: Location Plan; 001; 002; 003; 004; 005; 006; Design and Access Statement [Atelier Baulier; April 2026]; Sustainable Design and Construction Statement [Atelier Baulier; April 2026] REASON: To comply with Section 70(1)(a) of the Town and Country Act 1990 as amended and the Reason for Grant and also for the avoidance of doubt and in the interest of proper planning.
MATERIALS (COMPLIANCE): The development shall be constructed in accordance with the schedule of materials noted on the approved plans and within the Design and Access Statement. The development shall be carried out strictly in accordance with the details so approved and shall be maintained as such thereafter. REASON: In the interest of securing sustainable development and to ensure that the resulting appearance and construction of the development is of a high standard.
PV SOLAR PANELS (COMPLIANCE): The proposed PV solar panels on the rear roofslope shall match the colour of the existing roof. REASON: To ensure that the resulting appearance and construction of the development is of a high standard.
GREEN ROOF/FLAT ROOF NOT USED AS AMENITY SPACE (COMPLIANCE): The green roof shown on approved plan 001 shall be: a) biodiversity based with a varied extensive substrate base of an average depth of 80-150mm; b) laid out in accordance with approved plan 001; and c) planted/seeded with a mix of species within the first planting season following the practical completion of the building works (the seed mix shall be focused on wildflower planting, and shall contain no more than a maximum of 25% sedum). The biodiversity green roof shall not be used as an amenity or sitting out space of any kind whatsoever and shall only be used in the case of essential maintenance or repair, or escape in case of emergency. The biodiversity roofs shall be carried out strictly in accordance with the details so approved and shall be maintained as such thereafter. REASON: To ensure the development provides the maximum possible provision towards creation of habitats and valuable areas for biodiversity, to reduce surface water runoff from the site and to prevent the undue overlooking of neighbouring habitable room windows.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.