ApprovedCouncil status: FINAL DECISION

Replacement of existing timber framed doors/windows with aluminium framed doors/windows, alteration to flat roof balustrade, installation of green roof and associated works.

The Wooden House, 4A Crescent Street, London, N1 1BT

London Borough of IslingtonReference P2026/0887/FULFull Planning (Householder)

Last published check: 4 Oct 2026, 00:55. Check the council record for more recent changes.

Status and dates

Last published check: 4 Oct 2026, 00:55 (UK)

  1. DoneReceived31 Mar 2026
  2. DoneValidated31 Mar 2026
  3. ClosedConsultationEnded 2 May 2026
  4. Date set by councilTarget decision date25 May 2026
  5. DecidedApprove with conditions14 May 2026

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (13)
  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Press notice start date

    Published milestoneCouncil source
  6. Site notice date

    Published milestoneCouncil source
  7. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Site notice end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Dispatch date

    Published milestoneCouncil source
  12. Decision date

    Published milestoneCouncil source
  13. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Full Planning (Householder)
Ward
Barnsbury
Documents
11 published

Proposal

Replacement of existing timber framed doors/windows with aluminium framed doors/windows, alteration to flat roof balustrade, installation of green roof and associated works.

Reference
P2026/0887/FUL
Alternative references
PP-14826597
Ward
Barnsbury
Agent
Peter Brades
UPRN
5300102265

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • Location PlanLocation Plan31 Mar 2026View
  • Existing PlansDrawings - Existing31 Mar 2026View
  • Proposed Front and Side ElevationsDrawings - Proposed31 Mar 2026View
  • Proposed Rear Elevation and First Floor PlanDrawings - Proposed31 Mar 2026View
  • Proposed Roof PlanDrawings - Proposed31 Mar 2026View
  • Design and Access StatementApplication Supporting Documents31 Mar 2026View
  • Green Roof SpecificationApplication Supporting Documents31 Mar 2026View
  • Green Roof SpecificationApplication Supporting Documents31 Mar 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Approve with conditions
Decision Notice
Planning conditions
  1. 3 YEAR CONSENT PERIOD: The development hereby permitted shall be begun not later than the expiration of three years from the date of this permission. REASON: To comply with the provisions of Section 91(1)(a) of the Town and Country Planning Act 1990 as amended by the Planning and Compulsory Purchase Act 2004 (Chapter 5).
  2. DRAWING AND DOCUMENT NUMBERS: The development hereby approved shall be carried out in accordance with the following approved plans: 1794/01 Location Plan; 1794/03 Proposed Front & Side Elevations; 1794/04 Proposed Rear Elevation & First Floor Plan; 1794/05 Proposed Green Roof; Design and Access Statement [prepared by PBA; March 2026]; Sustainable Design and Construction Statement [March 2026]. REASON: To comply with Section 70(1)(a) of the Town and Country Act 1990 as amended and the Reason for Grant and also for the avoidance of doubt and in the interest of proper planning.
  3. MATERIALS (COMPLIANCE): The development shall be constructed in accordance with the schedule of materials noted on the approved plans and within the Design and Access Statement. The development shall be carried out strictly in accordance with the details so approved and shall be maintained as such thereafter. REASON: In the interest of securing sustainable development and to ensure that the resulting appearance and construction of the development is of a high standard.
  4. BIODIVERSITY-BASED EXTENSIVE GREEN ROOF (COMPLIANCE): The green roof hereby approved (as shown on approved plan 1794/05) shall be: (a) biodiversity based with a varied extensive substrate base of an average depth of 80-150mm (where possible); (b) laid out in accordance with approved plan 1794/05; and (c) planted/seeded with a mix of species within the first planting season following the practical completion of the building works (the seed mix shall be focused on wildflower planting, and shall contain no more than a maximum of 25% sedum). The biodiversity green roof shall not be used as an amenity or sitting out space of any kind whatsoever and shall only be used in the case of essential maintenance or repair, or escape in case of emergency. The biodiversity green roof shall be maintained as such thereafter in perpetuity. REASON: To ensure the development provides the maximum possible provision towards creation of habitats and valuable areas for biodiversity, and to reduce surface water runoff from the site.
  5. FLAT ROOF NOT USED AS AMENITY SPACE (COMPLIANCE): The use of the flat roof of the building including the green roof hereby approved (as shown on approved drawing 1794/05) shall be as set out in the application and the roof area shall not be used as a balcony, roof terrace or similar amenity area in perpetuity. The roof shall only be accessed for essential maintenance, repair or escape in case of emergency. REASON: To prevent the undue overlooking of neighbouring habitable room windows and protect neighouring amenity in accordance with Policy PLAN1 of Islington's Strategic and Development Management Policies (2023).
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.