Application for a non-material amendment pursuant to P2023/0381/S73 dated 18 July 2023. The amendments comprise of: 1) Amendments to the list of approved plans/drawings listed under Condition 2 (Approved Drawings). Amendments include changes to windows, doors, louvres and roof hatch along with change to balustrade colour.
34 York Way (Jahn Court), 34B York Way (The Hub), Albion Yard and Ironworks Yard, London, N1 9AB
FINAL DECISIONReference: P2026/0886/NMALondon Borough of Islington
Last published check: 3 Oct 2026, 21:56. Check the council record for more recent changes.
Application location
34 York Way (Jahn Court), 34B York Way (The Hub), Albion Yard and Ironworks Yard, London, N1 9AB
This record has no verified map location.
Application summary
Status
FINAL DECISION
Application type
Non-Material Amendment
Received
31 Mar 2026
Validated
2 Apr 2026
Determination deadline
27 Apr 2026
Local authority
London Borough of Islington
Application overview
Application for a non-material amendment pursuant to P2023/0381/S73 dated 18 July 2023. The amendments comprise of: 1) Amendments to the list of approved plans/drawings listed under Condition 2 (Approved Drawings). Amendments include changes to windows, doors, louvres and roof hatch along with change to balustrade colour.
Proposal details
Reference
P2026/0886/NMA
Alternative references
PP-14619018
Ward
Caledonian
Agent
Freya Prigent
UPRN
10096365946
Sign in to view all collected council fields and recorded changes.
The following documents were submitted with the application Proposed first floor plan 13601-A-L01-07-101 Rev P4; Proposed fifth floor plan 13601-A-L05-07-105 Rev P6; Proposed west elevation 13601-A-LXX-07-200 Rev P5; Proposed east elevation 13601-A-LXX-07-201 Rev P6; Proposed north elevation 13601-A-LXX-07-203 Rev P5; Proposed section DD 13601-A-LXX-07-303 Rev P4; Proposed first floor plan 13601-A-L01-07-101 Rev P4; NMA 01- Design explanatory document March 2026; Heritage Statement Turleys March 2026
Condition 2 is amended as follows: The development hereby approved shall be carried out in accordance with the following approved plans: Site location Plan - 13601-A-Z3-LXX-00-001; Existing Site Plan (1:500) - 13601-A-Z3-L00-01-020; Existing Site Plan (1:200) - 13601-A-L00-01-050; Existing Ground Floor Plan - 13601-A-L00-01-100; Existing First Floor Plan - 13601-A-01-01-101; Existing Second Floor Plan - 13601-A-02-01-102; Existing Third Floor Plan - 13601-A-03-01-103; Existing Fourth Floor Plan - 13601-A-04-01-104; Existing Roof Plan - 13601-A-05-01-105; Existing Basement Floor plan - 13601-A-LB1-01-099; Existing West Site Elevation - 13601-A-LXX-01-150; Existing East Site Elevation - 13601-A-LXX-01- 151; Existing Site Section AA - 13601-A-LXX-01-160; Existing Site Section DD - 13601-A-LXX-01- 161; Existing West Elevation - 13601-A-LXX-01-200; Existing East Elevation - 13601-A-LXX-01-201; Existing South Elevation - 13601-A-LXX-01-202; Existing North Elevation - 13601-A-LXX-01-203; Existing Section AA - 13601-A-LXX-01-300; Existing Section BB - 13601-A-LXX-01-301; Existing Section CC - 13601-A-LXX-01-302; Existing Section DD - 13601-A-LXX-01-303; L00- Demolition - 13601-A-L00-02-099; L00 - Demolition - 13601-A-L00-02-100 P2; L01 - Demolition - 13601-A-L00-02-101 P1; L02 - Demolition - 13601-A-L00-02-102; L03 - Demolition - 13601-A-L00- 02-103; L04 - Demolition - 13601-A-L00-02-104; L05 - Demolition - 13601-A-L00-02-105; LB1 - Demolition - 13601-A-L00-02-099; West Elevation - Demolition - 13601-A-LXX-02-200 P2; East Elevation - Demolition - 13601-A-LXX-02-201 P1; South Elevation - Demolition - 13601-A-LXX-02- 202; North Elevation - Demolition - 13601-A-LXX-02-203; Section CC - Demolition - 13601-A-LXX-02- 204 P1; Section DD - Demolition - 13601-A-LXX-02-205 P1; Proposed Site Plan (1:500) - 13601-A-Z3-LXX-07-020 P4; Proposed Site Plan (1:200) - 13601-A-L00- 07-050 P5; Proposed Ground Floor Plan - 13601-A-L00-07-100 P6; Proposed First Floor Plan - 13601-A-L01-07-101 P4; Proposed Second Floor Plan - 13601-A-L02-07-102 P3; Proposed Third Floor Plan - 13601-A-L03-07-103 P2; Proposed Fourth Floor Plan - 13601-A-L04-07-104 P5; Proposed Fifth Floor Plan - 13601-A-L05-07-105 P6; Proposed Fifth Floor Gallery Plan - 13601-AL06-07-106 P6 Proposed Roof Plan - 13601-A-RF-07-107 P4; Proposed Basement Plan - 13601-AL00-07-099 P1; Proposed West Site Elevation - 13601-A-LXX-07-150 P4 Proposed East Site Elevation - 13601-A-LXX-07-151 P4; Proposed Site Section AA - 13601-A-LXX-07-160 P3; Proposed Site Section DD - 13601-A-LXX-07-161 P3; Proposed West Elevation - 13601-A-LXX-07-200 P5; Proposed East Elevation - 13601-A-LXX-07-201 P6; Proposed South Elevation - 13601-A-LXX-07- 202 P4; Proposed North Elevation - 13601-A-LXX-07-203 P5; Proposed Section AA - 13601-A-LXX07-300 P4; Proposed Section BB - 13601-A-LXX-07-301 P3; Proposed Section CC - 13601-A-LXX07-302 P4; Proposed Section DD - 13601-A-LXX-07-303 P4; Albion Yard Existing Plan 0182c_PR2- P-X-AY-01 rev B; 0182C-PR2-P-X-AY-02 Rev B; 0182C-PR2-P-X-JCAY-01 Rev B; 0182C-PR2-P-XJCYW-01 Rev B; 0182C-PR2-P-X-IY-01 Rev B; 0182C-PR2-P-X-IY-02 Rev B; 0182C-PR2-P-X-IY-03 Rev B; 0182C-PR2-P-GA-AY-01 Rev C; 0182C-PR2-P-GA-AY-02 Rev B; 0182C-PR2-P-DT-AY-02 Rev C; 0182C-PR2-P-GA-JCAY-01 Rev C; 0182C-PR2-P-GA-JCYW-01 Rev B; 0182C-PR2-P-GAIY-01 Rev B; 0182C-PR2-P-GA-IY-02 Rev B; 0182C-PR2-P-GA-IY-03 Rev B; 0182c-PR2-P-GABlockC; Arboricultural Impact Assessment - TMA July 2021; Archaeological Desk Based Assessment - Savills August 2021; Biodiversity Net Gain Assessment and Urban Greening Factor Review - MKA Ecology July 2021; Construction Traffic Management Plan - RGP July 2021; Flood Risk Assessment and Drainage Strategy Report - Arup July 2021; Geoenvironmental and Geotechnical Report - Campbell Reith July 2021; Health Impact Assessment Screening Form - Savills July 2021; Preliminary Ecological Appraisal and Preliminary Roost Assessment - MKA Ecology July 2021; Public Realm report - Publica July 2021; Statement of Community Involvement - London Communications Agency July 2021; Letter from Savills dated 3 February 2023; Planning Statement dated January 2023; Affordable Workspace Statement dated April 2023; Design and Access Statement dated February 2023; Design and Access Statement (Piercy and Company July 2025); Built Heritage and Townscape Statement dated February 2023; Key Townscape Views Update February 2023; Transport Statement dated February 2023 Ref: 2022/6799/TSA04; Travel Plan dated February 2023 Ref: 2022/6799/TP05; Delivery and Servicing Management Plan dated 22/05/2023 ref: 22/6799/DSMP07 REVA; Daylight, Sunlight and Overshadowing Report– Point 2 Surveyors dated 3 February 2023; Energy Statement dated 1 February 2023 Revision 2.0; Energy Statement-Responses To Comments Provided By The Planning Officers Report DRAFT- 1.0 - 15-Jun-23; Sustainability Statement - 1 February 2023; Air Quality Assessment (including Air Quality Neutral Report) Revision 2.0 – 30 January 2023; Fire Statement ref: DOC-1922839-5A-AS-20230228-JC London Planning Statement-Rev00.docx; Life Science Need, Economic Benefits and Social Value Summary; Addendum to Flood Risk Assessment and Drainage Strategy Report dated 03 February 2023; Noise Impact Assessment Revision 01 dated 1 February 2023; NMA 01- Design explanatory document March 2026; Heritage Statement (Turleys 2026) REASON: To comply with Section 70(1)(a) of the Town and Country Act 1990 as amended and the Reason for Grant and also for the avoidance of doubt and in the interest of proper planning.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.