Section 73 Application (Minor Material Amendment) to vary Condition 2 (Approved Plans) of Planning Permission P2023/1473/FUL, dated 07/08/2023, for demolition of existing conservatory and erection of single storey rear extension, with part two storey rear extension. Roof extension and alterations to front and rear elevations. The amendments sought are to alter the approved design, including changes to the façade and the addition of a double-storey bay window to the front elevation.

8A Tollington Place, London, N4 3QR

FINAL DECISIONReference: P2026/0881/S73London Borough of Islington

Last published check: 3 Oct 2026, 17:21. Check the council record for more recent changes.

Application location

8A Tollington Place, London, N4 3QR

This record has no verified map location.

Application summary

Status
FINAL DECISION
Application type
Removal/Variation of Condition (Section 73)
Received
31 Mar 2026
Validated
13 Apr 2026
Determination deadline
7 Jun 2026
Local authority
London Borough of Islington

Application overview

Section 73 Application (Minor Material Amendment) to vary Condition 2 (Approved Plans) of Planning Permission P2023/1473/FUL, dated 07/08/2023, for demolition of existing conservatory and erection of single storey rear extension, with part two storey rear extension. Roof extension and alterations to front and rear elevations. The amendments sought are to alter the approved design, including changes to the façade and the addition of a double-storey bay window to the front elevation.

Proposal details

Reference
P2026/0881/S73
Alternative references
PP-14797960
Ward
Tollington
Agent
Shijian Zheng
UPRN
5300091697

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 7 of 7

DocumentPublishedAction
Application Form - Without Personal DataApplication Form - Redacted31 Mar 2026View
Proposed PlansDrawings - Proposed31 Mar 2026View
Community Infrastructure Levy - Completed FormApplication Supporting Documents31 Mar 2026View
Sustainable Design and Construction StatementApplication Supporting Documents23 Apr 2026View
Proposed Second Floor PlanDrawings - Proposed18 Jun 2026View
Decision NoticeDecision Notice19 Jun 2026View
Delegated Officer's ReportDelegated Report19 Jun 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Press notice start date

    Published milestoneCouncil source
  6. Site notice date

    Published milestoneCouncil source
  7. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Site notice end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  12. Dispatch date

    Published milestoneCouncil source
  13. Decision date

    Published milestoneCouncil source
  14. Extension date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approve with conditions
Decision Notice
Planning conditions
  1. S73 - CONSENT LIMITED TO THAT OF ORIGINAL PERMISSION: The development hereby permitted shall be begun not later than the expiration of 07/08/2026. REASON: To ensure the commencement timescale for the development is not extended beyond that of the original planning permission ref. P2023/1473/FUL granted on 07/08/2023. Furthermore, to comply with the provisions of Section 91(1)(a) of the Town and Country Planning Act 1990 as amended by the Planning and Compulsory Purchase Act 2004 (Chapter 5).
  2. DRAWING AND DOCUMENT NUMBERS: The development hereby approved shall be carried out in accordance with the following approved plans: 10-001 P2; P1055 Planning Statement; (03)_100; (03)_101; (03)_102 B; (03)_300; (03)_100; Sustainable Design and Construction Template. REASON: To comply with Section 70(1)(a) of the Town and Country Act 1990 as amended and the Reason for Grant and also for the avoidance of doubt and in the interest of proper planning.
  3. MATERIALS (DETAILS): Details and samples of all facing materials shall be submitted to and approved in writing by the Local Planning Authority prior to any superstructure work commencing on site. The details and samples shall include: (a) solid brickwork (including brick panels and mortar courses) (b) render (including colour, texture and method of application); (c) window treatment (including sections through the windows and reveals); (d) roofing materials; and (e) any other materials to be used. The development shall be carried out strictly in accordance with the details so approved and shall be maintained as such thereafter. REASON: In the interest of securing sustainable development and to ensure that the resulting appearance and construction of the development is of a high standard.
  4. FLAT ROOF NOT USED AS AMENITY SPACE (COMPLIANCE): The flat roof area shown on plan no. (03)_102 B hereby approved shall not be used as an amenity or sitting out space of any kind whatsoever and shall not be used other than for essential maintenance or repair, or escape in case of emergency. REASON: To prevent the undue overlooking of neighbouring habitable room windows.
  5. GREEN ROOF (COMPLIANCE): The biodiversity green roof shown on approved plan (03)_102 B shall be: (a) biodiversity based with a varied extensive substrate base of an average depth of 80-150mm; (b) laid out in accordance with approved plan (03)_102 B; and (c) planted/seeded with a mix of species within the first planting season following the practical completion of the building works (the seed mix shall be focused on wildflower planting, and shall contain no more than a maximum of 25% sedum). The biodiversity green roof shall not be used as an amenity or sitting out space of any kind whatsoever and shall only be used in the case of essential maintenance or repair, or escape in case of emergency. The biodiversity roofs shall be carried out strictly in accordance with the details so approved and shall be maintained as such thereafter. REASON: To ensure the development provides the maximum possible provision towards creation of habitats and valuable areas for biodiversity and to reduce surface water runoff from the site.
  6. HARDSTANDING (COMPLIANCE): Any new hardstanding to the front driveway/garden shall be porous or permeable, or shall direct surface water to a porous or permeable surface within the site and shall thereafter be maintained as such. REASON: To reduce surface water runoff from the site.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.