Replacement of existing doors with new timber framed doors to the Percival Street and St John Street elevations, including a new single glazed panel window; installation of new rear timber framed bi fold doors, a sloping glazed roof, louvred acoustic enclosure and ventilation supply duct; installation of air conditioning to the second and third floors with associated internal alterations and new internal openings; and installation of a new plant enclosure at first floor flat roof level.

The Peasant Public House, 240 St John Street, London, EC1V 4PH

FINAL DECISIONReference: P2026/0854/FULLondon Borough of Islington

Last published check: 3 Oct 2026, 12:54. Check the council record for more recent changes.

Application location

The Peasant Public House, 240 St John Street, London, EC1V 4PH

This record has no verified map location.

Application summary

Status
FINAL DECISION
Application type
Full Planning Application
Received
30 Mar 2026
Validated
15 Apr 2026
Determination deadline
9 Jun 2026
Local authority
London Borough of Islington

Application overview

Replacement of existing doors with new timber framed doors to the Percival Street and St John Street elevations, including a new single glazed panel window; installation of new rear timber framed bi fold doors, a sloping glazed roof, louvred acoustic enclosure and ventilation supply duct; installation of air conditioning to the second and third floors with associated internal alterations and new internal openings; and installation of a new plant enclosure at first floor flat roof level.

Proposal details

Reference
P2026/0854/FUL
Alternative references
PP-14816837
Ward
Clerkenwell
Agent
Graham West
UPRN
5300084846

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 13 of 13

DocumentPublishedAction
Application Form - Without Personal DataApplication Form30 Mar 2026View
Location PlanLocation Plan30 Mar 2026View
Community Infrastructure Levy - Completed formSupporting Documentation30 Mar 2026View
SUPERSEDED Existing and Proposed DrawingsApplication Drawings - Superseded30 Mar 2026View
Design and Access StatementSupporting Documentation30 Mar 2026View
Heritage statementSupporting Documentation30 Mar 2026View
Site Location PlanDrawing Submission30 Mar 2026View
Sustainable Design and Construction StatementSupporting Documentation15 Apr 2026View
Plant Noise AssessmentSupporting Documentation12 Jun 2026View
Existing and Proposed DraiwngsDrawing Submission26 Jun 2026View
Cooling HierachySupporting Documentation23 Jul 2026View
Decision NoticeDecision Notice23 Jul 2026View
Delegated Officer's ReportDelegated Report23 Jul 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Press notice start date

    Published milestoneCouncil source
  6. Site notice date

    Published milestoneCouncil source
  7. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Site notice end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  12. Dispatch date

    Published milestoneCouncil source
  13. Decision date

    Published milestoneCouncil source
  14. Extension date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approve with conditions
Decision Notice
Planning conditions
  1. 3 YEAR CONSENT PERIOD: The development hereby permitted shall be begun not later than the expiration of three years from the date of this permission. REASON: To comply with the provisions of Section 91(1)(a) of the Town and Country Planning Act 1990 as amended by the Planning and Compulsory Purchase Act 2004 (Chapter 5).
  2. DRAWING AND DOCUMENT NUMBERS: The development hereby approved shall be carried out in accordance with the following approved plans: Location Plan, 109_Rev P4, 110_Rev P5, 112_Rev P5, 130_Rev P5,131_Rev P3, 140_Rev P4, 145_Rev P3, 147_Rev P5, 152_Rev P5, 170_Rev P3, Plant Noise Assessment by RBA Acoustics Ltd ref. 15324. RP01.PNA.0 dated 11 June 2026, Sustainable Design and Contruction Statement, Heritage Statement dated March 2026, The George and Dragon – Cooling Hierarchy. REASON: To comply with Section 70(1)(a) of the Town and Country Act 1990 as amended and the Reason for Grant and also for the avoidance of doubt and in the interest of proper planning.
  3. MATERIALS (COMPLIANCE): The development shall be constructed in accordance with the schedule of materials noted on the approved plans. The development shall be carried out strictly in accordance with the details so approved and shall be maintained as such thereafter. REASON: In the interest of securing sustainable development and to ensure that the resulting appearance and construction of the development is of a high standard.
  4. PLANT NOISE LIMIT (COMPLIANCE): The design and installation of new items of fixed plant shall be such that when operating the cumulative noise level LAeq Tr arising from the proposed plant, measured or predicted at 1m from the facade of the nearest noise sensitive premises, shall be a rating level of at least 5dB(A) below the background noise level LAF90 Tbg. The measurement and/or prediction of the noise should be carried out in accordance with the methodology contained within BS 4142:2014+A1:2019. REASON: To ensure that the operation of fixed plant does not adversely impact on residential amenity
  5. PLANT NOISE VERTIFICATION (DETAILS): A report is to be commissioned by the applicant, using an appropriately experienced & competent person, to assess the noise from the proposed mechanical plant to demonstrate compliance with condition 4. The report shall include site measurements of the plant insitu. The report shall be submitted to and approved in writing by the Local Planning Authority within three months of the date of the installation of the plant. The plant shall be operated in accordance with the approved details at all times and any noise mitigation measures shall be retained in perpetuity. REASON: To ensure that the operation of fixed plant does not impact on residential amenity
  6. PLANT MAINTENANCE: The applicant is advised that Islington have a duty to investigate any complaints in terms of statutory nuisance. It is also advised that the plant is checked upon installation and regularly checked, maintained and serviced to ensure noise levels do not rise or acoustic character such as tonality, intermittency, impulsivity or other acoustic character develop.
  7. CONSTRUCTION: Noise from demolition and construction works is subject to control under the Control of Pollution Act 1974. The applicant is advised to carry out any building works that can be heard at the boundary of the site only between 08.00 and 18.00 hours Monday to Friday and 08.00 to 13.00 on Saturday and not at all on Sundays and Public Holidays. An informative attached to the decision notice.
  8. OFFICE ACCOMMODATION (COMPLIANCE): The ‘office’ accommodation shown on the approved second and third floorplans shall remain ancillary to the operation of the public house (Sui Generis) at 240 St John Street in perpetuity. At no point shall any part of the site be occupied or operated as an independent office use, as a separate planning unit, or as any other planning use without the prior written consent of the Local Planning Authority. REASON: For the avoidance of doubt and to ensure that the site is retained as a public house (Sui Generis) and to prevent the introduction of independent office use or other use without the prior written consent of the Local Planning Authority.
  9. PLANT TIMER (COMPLIANCE): Prior to the hereby approved plant equipment being used, a timer shall be installed limiting the operation of the roof level plant to between the hours of 11:00 to 00:00 each day only. The plant units shall not be operated outside of these hours. The timer shall be maintained as such thereafter. REASON: In order to safeguard neighbouring amenity.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.