Installation of an external extraction duct to the rear elevation to serve commercial use (Use Class E) including associated internal mechanical works, comprising a vertical duct rising from basement and ground floor level to above roof level, removal of stud walls, repainting of exterior, amendments to front door, draught lobby and infilling of internal doorways.
361 - 363 Goswell Road, London, EC1V 7JL
FINAL DECISIONReference: P2026/0822/FULLondon Borough of Islington
Last published check: 2 Oct 2026, 12:47. Check the council record for more recent changes.
Application location
361 - 363 Goswell Road, London, EC1V 7JL
This record has no verified map location.
Application summary
Status
FINAL DECISION
Application type
Full Planning Application
Received
26 Mar 2026
Validated
14 May 2026
Determination deadline
18 Jun 2026
Local authority
London Borough of Islington
Application overview
Installation of an external extraction duct to the rear elevation to serve commercial use (Use Class E) including associated internal mechanical works, comprising a vertical duct rising from basement and ground floor level to above roof level, removal of stud walls, repainting of exterior, amendments to front door, draught lobby and infilling of internal doorways.
Proposal details
Reference
P2026/0822/FUL
Alternative references
PP-14797968
Ward
St Peter's & Canalside
Agent
Mr Chen William Hailiang
UPRN
10007029096
Sign in to view all collected council fields and recorded changes.
3 YEAR CONSENT PERIOD: The development hereby permitted shall be begun not later than the expiration of three years from the date of this permission. REASON: To comply with the provisions of Section 91(1)(a) of the Town and Country Planning Act 1990 as amended by the Planning and Compulsory Purchase Act 2004 (Chapter 5).
DRAWING AND DOCUMENT NUMBERS: The development hereby approved shall be carried out in accordance with the following approved plans: CPU-2611-PD-00-REV 00 Site Location Plan, CPU-2611-PD-03-REV 02 Proposed Basement Plan, CPU-2611-PD-04-REV 01 Proposed Ground Floor Plan, CPU-2611-PD-06-REV 01 Proposed Rear Elevation, CPU-2611-PD-11-REV 00 Proposed Goswell Elevation and Information, CPU-2611-PD-12-REV 00 Ground Floor & Basement Details, Courtyard Maintenance and Pigeon Mitigation Statement, Noise Impact Assessment IAC J26004 V03 dated 24th March 2026, Ventilation Strategy Report Rev 01 dated 22nd July 2026, Planning Statement P/2611/2, Heritage Statement P/2611/3, Sustainable Design & Construction Statement (SDCS) REASON: To comply with Section 70(1)(a) of the Town and Country Act 1990 as amended and the Reason for Grant and also for the avoidance of doubt and in the interest of proper planning.
MATERIALS (COMPLIANCE): The development shall be constructed in accordance with the schedule of materials noted on the approved plans and within the Design and Access Statement and Heritage Statement. The development shall be carried out strictly in accordance with the details so approved and shall be maintained as such thereafter. REASON: In the interest of securing sustainable development and to ensure that the resulting appearance and construction of the development is of a high standard.
PLANT NOISE LIMIT (COMPLIANCE): The design and installation of new items of fixed plant shall be such that when operating the cumulative noise level LAeq Tr arising from the proposed plant, measured or predicted at 1m from the facade of the nearest noise sensitive premises, shall be a rating level of at least 5dB(A) below the background noise level LAF90 Tbg. The measurement and/or prediction of the noise should be carried out in accordance with the methodology contained within BS 4142:2014+A1:2019. REASON: To ensure that the operation of fixed plant does not impact on residential amenity.
PLANT NOISE VERIFICATION (DETAILS): A report is to be commissioned by the applicant, using an appropriately experienced and competent person, to assess the noise from the proposed mechanical plant to demonstrate compliance with condition 4. The report shall include site measurements of the plant insitu. The report shall be submitted to and approved in writing by the Local Planning Authority and any noise mitigation measures shall be installed within three months of the installation of the mechanical plant. The plant and noise mitigation measures shall be maintained in full accordance with approved details and retained as such in perpetuity. REASON: In order to protect neigbouring amenity.
FUEL FILTRATION (COMPLIANCE): Notwithstanding the plans hereby approved, the flue shall be fitted with fine filtration or Electrostatic Precipitation followed by carbon filtration (carbon filters rated with 0.2-0.4 second residence time) or alternatively fine filtration followed by carbon filtration and by counteractant/neutralising system to achieve the same level as above. The filter systems of the approved flue / extraction units shall be regularly maintained and cleaned; and any filters and parts requiring cleaning or replacement shall be easily accessible. REASON: To ensure that the operation of fixed plant does not impact on residential amenity.
FLUE DISCHARGE (COMPLIANCE): Notwithstanding the plans hereby approved, the flue/stack shall discharge the extracted air no less than 1.0m above the eaves of the main roof of the building to which it is attached. The flue termination shall be fitted with a vertically directed high velocity discharge cowl so the vent discharges at 10-15 m/s. REASON: To ensure that the operation of fixed plant does not impact on residential amenity.
FLUE OPERATING HOURS (COMPLIANCE): Prior to the hereby approved plant equipment being used, a timer shall be installed limiting the operation of the kitchen extractor system to between the hours of 11:00-22:00 Monday to Saturday and 11:00 to 22:00 Sunday. The kitchen extractor system shall not be operated outside of these hours. The timer shall be maintained as such thereafter. REASON: In order to protect residential amenity.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.