RefusedCouncil status: FINAL DECISION

Prior Approval Application under Schedule 2, Part 20 Class AB of The Town and Country Planning (General Permitted Development) (England) Order 2015 for an upward extension of existing building by two additional storeys to create 6 new flats (6x1 bed).

140 Seven Sisters Road, London, N7 7NS

London Borough of IslingtonReference P2026/0769/PRAPrior Approval (Roof Extensions)

Last published check: 3 Oct 2026, 16:32. Check the council record for more recent changes.

Status and dates

Last published check: 3 Oct 2026, 16:32 (UK)

  1. DoneReceived23 Mar 2026
  2. DoneValidated14 Apr 2026
  3. ClosedConsultationEnded 9 May 2026
  4. Date set by councilTarget decision date17 May 2026
  5. DecidedPrior approval required - refused15 May 2026

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (13)
  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Press notice start date

    Published milestoneCouncil source
  6. Site notice date

    Published milestoneCouncil source
  7. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Site notice end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Dispatch date

    Published milestoneCouncil source
  12. Decision date

    Published milestoneCouncil source
  13. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Prior Approval (Roof Extensions)
Ward
Finsbury Park
Documents
22 published

Proposal

Prior Approval Application under Schedule 2, Part 20 Class AB of The Town and Country Planning (General Permitted Development) (England) Order 2015 for an upward extension of existing building by two additional storeys to create 6 new flats (6x1 bed).

Reference
P2026/0769/PRA
Alternative references
PP-14765168
Ward
Finsbury Park
Agent
Shloime Godlewsky
UPRN
5300081937

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • Application Form (Redacted)Application Form21 Mar 2026View
  • Drawing Set (Full)Drawings - Proposed21 Mar 2026View
  • Noise Impact AssessmentSupporting Documentation21 Mar 2026View
  • Land Contamination AssessmentSupporting Documentation21 Mar 2026View
  • Daylight/Sunlight ReportSupporting Documentation21 Mar 2026View
  • Location and Block PlanDrawings - Existing21 Mar 2026View
  • Existing Ground & First Floor PlanDrawings - Existing21 Mar 2026View
  • Existing Elevations (1 of 2)Drawings - Existing21 Mar 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Prior approval required - refused
Decision Notice
Planning conditions
  1. REASON: The proposal fails to accord with Schedule 2, Part 20, Class AB.1(k), and Class AB.1(l) of The Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended), as the submitted details (plans, elevations and sections) fail to accurately depict the existing building, having omitted the in-situ plant on the rear elevation, and are considered inconsistent. The Local Planning Authority therefore refuses the application as the developer has provided insufficient information to enable the authority to establish whether the proposed development complies with, any conditions, limitations or restrictions specified within the Schedule 2, Part 20, Class AB.(B)(3) of The Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended).
  2. Location and Block Plan E00, Proposed Drawings Block Plan P00, Proposed Drawings Floor Plans P01, Proposed Drawings Floor Plans P02, Proposed Drawings Elevations P03, Proposed Drawings Elevations P04, Proposed Drawings Elevations P05, Proposed Drawings Elevations P06, Proposed Drawings Section P07, Proposed Drawings Detail P08, Proposed Drawings Details P09, Daylight Sunlight Analysis by Morgan Light Assessors dated January 2026, Acoustic Report by Atelier Crescendo ACC-00075-ARP1-6 dated 13 February 2026, Contaminated Land Risk Assessment PH1-2026-000003 dated 02/02/2026
  3. REASON: The proposal fails to accord with Schedule 2, Part 20, Class AB.2(1)(f) of The Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended). The applicant has failed to demonstrate that all habitable rooms to Studio Flat 02 and Studio Flat 05 would be provided with adequate natural light as the provision of windows in a side elevation is not possible under condition (3) of Class AB.2. This is contrary to the NPPF, the GPDO and the Local Plan Development Framework policies insofar as they are material considerations relevant to the prior approval matters.
  4. REASON: The proposed fails to accord with Schedule 2, Part 20, Class AB.2(1)(e) of The Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended). The proposed design of the addtional two floors fails to complement the existing building, the excessive height, addtional mass, poorly integrated fenestration pattern, lack of facade interest and staggered set back in an alternative modern design are not in keeping with the existing building or the wider terrace where it would become unduly prominent and out of place in this context. The proposal is therefore contrary to the NPPF, the GPDO and the Local Plan Development Framework policies insofar as they are material considerations relevant to the prior approval matters.
  5. REASON: The proposal fails to accord with Schedule 2, Part 20, Class AB.2 Condition 3 of The Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended), as the submitted details (plans, elevations and sections) include the installation of side facing windows. The Local Planning Authority therefore refuses the application as the development does not comply with this requirement as specified within the Schedule 2, Part 20, Class AB.2 Condition 3 of The Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended).
  6. REASON: The proposal fails to accord with Schedule 2, Part 20, Class AB.2(1)(g) of The Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended). The applicant has failed to demonstrate that the proposed roof terrace would not give rise to unacceptable levels of overlooking leading to a loss of privacy for the residential occupiers of 136-138 Seven Sisters Road. Furthermore, the proposed siting, scale, height and mass of the development would lead to an unacceptable sense of enclosure and loss of outlook to neighbouring residents. This is contrary to the NPPF, the GPDO and the Local Plan Development Framework policies insofar as they are material considerations relevant to the prior approval matters.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.