Council planning record

Erection of two new front dormers, enlargement of existing rear dormer and erection of a rear roof extension above the outrigger.

192 Seven Sisters Road, London, N4 3NX

FINAL DECISIONReference: P2026/0767/FULLondon Borough of Islington

Last published check: 3 Oct 2026, 21:41. Check the council record for more recent changes.

Application location

192 Seven Sisters Road, London, N4 3NX

This record has no verified map location.

Application summary

Status
FINAL DECISION
Application type
Full Planning Application
Received
20 Mar 2026
Validated
3 Apr 2026
Determination deadline
28 May 2026
Local authority
London Borough of Islington

Application overview

Erection of two new front dormers, enlargement of existing rear dormer and erection of a rear roof extension above the outrigger.

Proposal details

Reference
P2026/0767/FUL
Alternative references
PP-14798953
Ward
Finsbury Park
Agent
E Bekele
UPRN
5300082023

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 27 of 27

DocumentPublishedAction
Cover LetterApplication Supporting Documents21 Mar 2026View
Design and Access StatementApplication Supporting Documents21 Mar 2026View
**superseded* Existing Floor Plan (Basement and Ground)Application Drawings - Superseded21 Mar 2026View
Existing Floor Plan (First, Second and Loft)Drawings - Existing21 Mar 2026View
*superseded* Existing and Proposed Side ElevationApplication Drawings - Superseded21 Mar 2026View
*superseded* Existing Front ElevationApplication Drawings - Superseded21 Mar 2026View
*superseded* Existing Rear ElevationApplication Drawings - Superseded21 Mar 2026View
*superseded* Proposed Floor Plan (Basement and Ground)Application Drawings - Superseded21 Mar 2026View
*superseded* Proposed Floor Plan (First, Second and Loft)Application Drawings - Superseded21 Mar 2026View
*superseded* Proposed Block PlanApplication Drawings - Superseded21 Mar 2026View
*superseded* Proposed Front and Rear ElevationApplication Drawings - Superseded21 Mar 2026View
Location PlanLocation Plan21 Mar 2026View
Sustainable Design and Construction StatementApplication Supporting Documents21 Mar 2026View
Existing Floor Plan (Basement and Ground) (revised)Drawings - Existing22 May 2026View
Existing and Proposed Side Elevation (revised)Drawings - Proposed22 May 2026View
Existing Rear Elevation (revised)Drawings - Existing22 May 2026View
Proposed Floor Plan (Basement and Ground) (rev.A)Drawings - Proposed22 May 2026View
Proposed Block Plan (revised)Location Plan22 May 2026View
Existing Front Elevation (revised)Drawings - Existing22 May 2026View
Existing and Proposed Roof PlanDrawings - Proposed3 Jun 2026View
*superseded* Proposed Floor Plan (First, Second and Loft) (rev.A)Application Drawings - Superseded3 Jun 2026View
Application Form (revised)Application Form - Redacted3 Jun 2026View
Existing and Proposed Roof Plan (rev.A)Drawings - Proposed8 Jul 2026View
Proposed Floor Plan (First, Second and Loft) (rev.B)Drawings - Proposed8 Jul 2026View
Proposed Front and Rear Elevation (rev.C)Drawings - Proposed8 Jul 2026View
Delegated ReportDelegated Report15 Jul 2026View
Decision NoticeDecision Notice15 Jul 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Press notice start date

    Published milestoneCouncil source
  6. Site notice date

    Published milestoneCouncil source
  7. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Site notice end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  12. Dispatch date

    Published milestoneCouncil source
  13. Decision date

    Published milestoneCouncil source
  14. Extension date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approve with conditions
Decision Notice
Planning conditions
  1. 3 YEAR CONSENT PERIOD: The development hereby permitted shall be begun not later than the expiration of three years from the date of this permission. REASON: To comply with the provisions of Section 91(1)(a) of the Town and Country Planning Act 1990 as amended by the Planning and Compulsory Purchase Act 2004 (Chapter 5).
  2. DRAWING AND DOCUMENT NUMBERS: The development hereby approved shall be carried out in accordance with the following approved plans: PLAN NOS: Location Plan, 01(Rev.A), 02A, 03C, 04A, 05, 06A, 07B, 08A, 09A, 10A, Sustainable Design and Construction Statement, Cover Letter REASON: To comply with Section 70(1)(a) of the Town and Country Act 1990 as amended and the Reason for Grant and also for the avoidance of doubt and in the interest of proper planning.
  3. MATERIALS (COMPLIANCE): The development shall be constructed in accordance with the schedule of materials noted on the approved plans and within the Design and Access Statement. The development shall be carried out strictly in accordance with the details so approved and shall be maintained as such thereafter. REASON: In the interest of securing sustainable development and to ensure that the resulting appearance and construction of the development is of a high standard.
  4. INFORMATIVE: You are advised that this decision notice only grants planning permission for the works as described in the development description. It does not grant planning consent for the use of the upper floors as a House in Multiple Occupation. Please be advised that planning permission would be required for the use as a large-scale HMO (Sui Generis).
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.