Council planning record

Removal of existing rear ground floor extension and replacement with a lower ground floor rear extension. Tanking and conversation of South vault. Associated internal (including relocation of kitchen, new radiators, reconfiguration of bathrooms, new openings between rooms with associated works; reinstatement of features throughout) and external (including new entrance lobby to front lightwell and erection of handrails to rear extension with associated works), alterations.

53 Amwell Street, London, EC1R 1UR

FINAL DECISIONReference: P2026/0766/LBCLondon Borough of Islington

Last published check: 3 Oct 2026, 23:17. Check the council record for more recent changes.

Application location

53 Amwell Street, London, EC1R 1UR

This record has no verified map location.

Application summary

Status
FINAL DECISION
Application type
Listed Building
Received
20 Mar 2026
Validated
1 Apr 2026
Determination deadline
26 May 2026
Local authority
London Borough of Islington

Application overview

Removal of existing rear ground floor extension and replacement with a lower ground floor rear extension. Tanking and conversation of South vault. Associated internal (including relocation of kitchen, new radiators, reconfiguration of bathrooms, new openings between rooms with associated works; reinstatement of features throughout) and external (including new entrance lobby to front lightwell and erection of handrails to rear extension with associated works), alterations.

Proposal details

Reference
P2026/0766/LBC
Alternative references
PP-14798825_C
Ward
Clerkenwell
Agent
Mr James Davies
UPRN
5300001906

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 23 of 23

DocumentPublishedAction
Application Form - Without Personal DataDefault21 Mar 2026View
heritage statement1 Apr 2026View
lower ground floor planApplication Drawings - Superseded1 Apr 2026View
location/block plan1 Apr 2026View
first floor plan1 Apr 2026View
second floor plan1 Apr 2026View
third floor plan1 Apr 2026View
roof floor plan1 Apr 2026View
sectionsApplication Drawings - Superseded1 Apr 2026View
lower ground floor sectionApplication Drawings - Superseded1 Apr 2026View
front elevationsApplication Drawings - Superseded1 Apr 2026View
Rear elevationsApplication Drawings - Superseded1 Apr 2026View
front elevations1 Apr 2026View
rear elevations1 Apr 2026View
SDCS1 Apr 2026View
Rev. P1 lower ground floor existing and proposed22 Jun 2026View
Rev. P1 Existing and proposed sections22 Jun 2026View
Rev. P1 detailed sections22 Jun 2026View
Rev. P1 existing and proposed front elevation22 Jun 2026View
Rev. P1 existing and proposed rear elevation22 Jun 2026View
DAS22 Jun 2026View
Proposed lightwell drainage22 Jun 2026View
Dceision NoticeDecision Notice9 Jul 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Press notice start date

    Published milestoneCouncil source
  6. Site notice date

    Published milestoneCouncil source
  7. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Site notice end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  12. Extension date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  13. Dispatch date

    Published milestoneCouncil source
  14. Decision date

    Published milestoneCouncil source

Decision & conditions

Approve with conditions
Dceision Notice
Planning conditions
  1. 3 YEAR CONSENT PERIOD FOR LBC and CAC: The works hereby permitted shall be begun not later than three years from the date of this consent. REASON: To comply with the provisions of Section 18(1)(a) of the Planning (Listed Buildings and Conservation Areas) Act 1990 as amended by the Planning and Compulsory Purchase Act 2004 (Chapter 5).
  2. ALL EXTERNAL AND INTERNAL WORKS TO MATCH (COMPLIANCE): All new external and internal works and finishes and works of making good to the retained fabric shall match the existing adjacent work with regard to the methods used and to material, colour, texture and profile. All such works and finishes shall be maintained as such thereafter. REASON: In order to safeguard the special architectural or historic interest of the heritage asset.
  3. Historic features to be retained: All existing historic features including, but not limited to, chimney pieces, plasterwork, architraves, panelling, doors, staircase balustrading shall remain undisturbed in their existing position and shall be fully protected during the course of works on site, unless specifically authorised otherwise on the drawings hereby approved. The development and works shall not be carried out otherwise than in accordance with the details thus approved. REASON: To ensure that those features which contribute to the special architectural and historic interest of the building are retained and in accordance with Sections 16 and 17 (1) (a) of the Planning (Listed Buildings and Conservation Areas) Act 1990 and National Planning Policy Framework, December 2024, Paragraphs 202 to 221; The London Plan 2021 Policy HC1 Heritage conservation and growth; and Local Plan policies
  4. Details of materials (building only) Full details, including physical samples, of all the materials to be used on the external surfaces of the building, including, but not limited to the proposed facing bricks for the new rear extension shall be submitted to and approved by the Local Planning Authority, in writing, before any work commences on site. The development shall not be carried out otherwise than in accordance with the details thus approved. REASON: To ensure that special regard is paid to protecting the special architectural and historic interest and integrity of the building under Sections 16 and 66 of the Planning (Listed Buildings and Conservation Areas) Act 1990 and National Planning Policy Framework, December 2024, Paragraphs 202 to 221; The London Plan 2021 Policy HC1 Heritage conservation and growth; and Local Plan policies.
  5. Details to be approved (general): Detailed drawings and full particulars of the following shall be submitted to and approved in writing by the Local Planning Authority prior to the start of the relevant part of the works. The works shall not be carried out otherwise than in accordance with the details thus approved: a) The proposed fireplaces to the front and rear rooms at ground and first floor and to the rear room at third floor level; b) All proposed external vents, terminations and flues; c) All proposed new external and internal doors, including that to the south vault; d) The proposed waterproofing system for the north vault utility room; e) All proposed replacement internal window shutters; f) All proposed replacement internal cornices; g) The proposed rear area steel fence. REASON: To ensure that special regard is paid to protecting the special architectural and historic interest and integrity of the building under Sections 16 and 66 of the Planning (Listed Buildings and Conservation Areas) Act 1990 and National Planning Policy Framework, December 2024, Paragraphs 202 to 221; The London Plan 2021 Policy HC1 Heritage conservation and growth; and Local Plan policies.
  6. Compliance a) The unauthorised works previously executed (the provision of a kitchen at first floor level and the current arrangement and layout of the second-floor bathroom) shall be removed within nine months of the date of this consent, in accordance with the consented drawings. b) No works shall be undertaken to the south vault other than as shown on the consented drawings. REASON: To ensure that special regard is paid to protecting the special architectural and historic interest and integrity of the building under Sections 16 and 66 of the Planning (Listed Buildings and Conservation Areas) Act 1990 and National Planning Policy Framework, December 2024, Paragraphs 202 to 221; The London Plan 2021 Policy HC1 Heritage conservation and growth; and Local Plan policies.
  7. This consent relates solely to listed building matters. Should it become necessary to make alterations to the consented scheme in order to comply with other legislation, such as Building Regulations, a further consent may be required. Such a consent should be sought and obtained prior to the relevant works being undertaken
  8. The applicant, their successors, and developer must ensure compliance with the conditions listed above. Some conditions may require the submission and approval of further information to the Local Planning Authority prior to the commencement of development, works, use or occupation.
  9. Please note that an application for approval of details reserved by a condition will need to be made to the Local Planning Authority in respect of those conditions. You should allow up to eight weeks for a decision. Please ensure that you allow plenty of time for this process when planning the timetable for your project. Commencement in breach of a condition could lead to enforcement action.
  10. If you are an agent, please ensure that a full copy of this decision is forwarded to your client. In particular, please advise your client of any conditions attached to the decision and the need for them to comply with those conditions. Failure to comply with a condition is a breach of planning control, which could lead to enforcement action being taken against your client
  11. PHP AMW 01 001 Site Location + Block Plan; PHP AMW 01 100 Rev. P1 Proposed + Existing Floor Plans Lower Ground Floor; PHP AMW 01 101 Proposed + Existing Floor Plans Upper Ground Floor; PHP AMW 01 102 Proposed + Existing Floor Plans First Floor; PHP AMW 01 103 Proposed + First Existing Floor Plans Second Floor; PHP AMW 01 104 Proposed + Existing Floor Plans Third Floor; PHP AMW 01 105 Proposed + Existing Floor Plans Roof; PHP AMW 01 200 Rev. P1 Proposed + Existing Sections Section; PHP AMW 01 201 Rev. P1 Proposed + Existing Sections Lower Ground Floor Section; PHP AMW 01 300 Rev. P1 Proposed + Existing Elevations Front Elevation; PHP AMW 01 301 Rev. P1 Proposed + Existing Elevations Rear Elevation; PHP AMW 01 302 Proposed + Existing Elevations Front Elevation; PHP AMW 01 303 Proposed + Existing Elevations Rear Elevation; PHP AMW Sk031 170626; Heritage Significance, Impact Assessment & Justification Statement December 2025 prepared by Dorian A.T.A Crone BA Barch DipTP RIBA MRTPI IHBC, Melisa Thomas BA PGDL LPC MSc IHBC, Daniel Cummins MA (Oxon) MSc PhD IBC of Heritage Information Ltd; SA-321-REP-002 Construction Sttrucutual Method Statement Rev. P1 dated 09/12/2025 Prepared by Toby Allen Meng CEng MICE and Sustainable Design and Construction Statement.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.