Replacement of the existing windows and doors with new PVCu windows and a mix of PVCu and composite doors. Replacement of window panels to all elevations with new composite panels to Watersview Estate (for Grand Junction Wharf, Pickfords Wharf, and Wharf Road).
Replacement of the existing windows and doors with new PVCu windows and a mix of PVCu and composite doors. Replacement of window panels to all elevations with new composite panels to Watersview Estate (for Grand Junction Wharf, Pickfords Wharf, and Wharf Road).
Reference
P2026/0733/FUL
Alternative references
PP-14715959
Ward
St Peter's & Canalside
Agent
Ms Julia Shields
UPRN
5300097006
Sign in to view all collected council fields and recorded changes.
3 YEAR CONSENT PERIOD: The development hereby permitted shall be begun not later than the expiration of three years from the date of this permission. REASON: To comply with the provisions of Section 91(1)(a) of the Town and Country Planning Act 1990 as amended by the Planning and Compulsory Purchase Act 2004 (Chapter 5).
DRAWING AND DOCUMENT NUMBERS: The development hereby approved shall be carried out in accordance with the following approved plans: 2314-GJW-PPA-OS-01 Site Location Plan; 2314-GJW-PPA-OS-02 Block Plan; 2314-GJW-PA-S-01 Proposed window schedule 1; 2314-GJW-PA-S-02 Proposed window schedule 2; 2314-GJW-PA-S-03 Proposed window schedule 3; 2314-GJW-PA-S-04 Proposed window schedule 4; 2314-GJW-PA-S-05 Proposed window schedule 5; 2314-GJW-PA-S-06 Proposed window schedule 6; 2314-GJW-PA-S-07 Proposed window schedule 7; 2314-GJW-PA-S-08 Proposed window schedule 8; 2314-GJW-PA-S-09 Proposed window schedule 9; 2314-GJW-PA-S-10 Proposed window schedule 10; 2314-GJW-PA-S-11 Rev. A Proposed door schedule 1; 2314-GJW-PA-S-12 Proposed door schedule 2; 2314-GJW-PA-S-13 Rev. A Proposed door schedule 3; 2314-GJW-PA-S-14 Proposed door schedule 4; 2314-GJW-PE-01-REVA Proposed elevations 1 (no's 1-2A); 2314-GJW-PE-02 Proposed elevations 2 (no's 4-8); 2314-GJW-PE-03 Proposed elevations 3 (no's 8-18a); 2314-GJW-PE-04 Proposed elevations 4 (no's 3-17); 2314-GJW-PE-05 Proposed elevations 5 (no's 3-17); 2314-PW-PA-S-01 Proposed window schedule 1; 2314-PW-PA-S-02 Proposed window schedule 2; 2314-PW-PA-S-03 Proposed window schedule 3; 2314-PW-PA-S-04 Proposed window schedule 4; 2314-PW-PA-S-05 Proposed window schedule 5; 2314-PW-PA-S-06 Proposed window schedule 6; 2314-PW-PA-S-09 Proposed window schedule 9; 2314-PW-PA-S-11 Proposed door schedule 2; 2314-PW-PA-S-12 Proposed door schedule 3; 2314-PW-PA-S-13 Proposed door schedule 4; 2314-PW-PA-S-15 Proposed door schedule 6; 2314-PW-PA-S-16 Proposed door schedule 7; 2314-PW-PE-01 Proposed elevations 1 (no's 1 -2) 2314-PW-PE-02 Proposed elevations 2 (no's 3-18A) 2314-PW-PE-03 Proposed elevations 3 (no's 3-17) 2314-PW-PE-04 Proposed elevations 4 (no's 14-18) 2314-PW-PE-05 Proposed elevations 5 (no's 14-18) 2314-PW-PA-S-07 Proposed window schedule 7; 2314-PW-PA-S-08 Proposed window schedule 8; 2314-PW-PA-S-10 Proposed door schedule 1; 2314-PW-PA-S-14 Proposed door schedule 5 2314-WR-PA-S-01 Proposed window schedule 1; 2314-WR-PA-S-02 Proposed window schedule 2; 2314-WR-PA-S-03 Proposed window schedule 3; 2314-WR-PA-S-04 Proposed door schedule 1; 2314-WR-PA-S-05 Proposed door schedule 2; 2314-WR-PE-01 Proposed elevations 1 (no's 49a-51a); 2314-WR-PE-02 Proposed elevations 2 (no's 53a-59a); 2314-WR-PE-03 Proposed elevations 3 (no's 61-61A); Design and Access Statement Revision V2 dated February 2026 Composite Door System; Profile 22 Door System; Profile 22 Chamfered Windows and Doors; OPT-CH-03 STANDARD WINDOW DETAILS; P22-CO-DR-01 Rev. A PROFILE 22 COMPOSITE DOOR SYSTEM OPEN IN DETAILS; Watersview-SC1-02 Proposed screen design and construction; Watersview SC1-03 Proposed screen design and construction; Sustainable Design & Construction Statement dated May 2026. REASON: To comply with Section 70(1)(a) of the Town and Country Act 1990 as amended and the Reason for Grant and also for the avoidance of doubt and in the interest of proper planning.
MATERIALS (COMPLIANCE): The development shall be constructed in accordance with the schedule of materials noted on the approved plans and within the Design and Access Statement Revision V2 Dated February 2026. The development shall be carried out strictly in accordance with the details so approved and shall be maintained as such thereafter. REASON: In the interest of securing sustainable development and to ensure that the resulting appearance and construction of the development is of a high standard.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.