Council planning record

Replacement of the existing windows and doors with new PVCu windows and a mix of PVCu and composite doors. Replacement of window panels to all elevations with new composite panels to Watersview Estate (for Grand Junction Wharf, Pickfords Wharf, and Wharf Road).

Watersview Estate, London, N1 7RN

FINAL DECISIONReference: P2026/0733/FULLondon Borough of Islington

Last published check: 2 Oct 2026, 22:33. Check the council record for more recent changes.

Application location

Watersview Estate, London, N1 7RN

This record has no verified map location.

Application summary

Status
FINAL DECISION
Application type
Full Planning Application
Received
17 Mar 2026
Validated
1 May 2026
Determination deadline
24 Jun 2026
Local authority
London Borough of Islington

Application overview

Replacement of the existing windows and doors with new PVCu windows and a mix of PVCu and composite doors. Replacement of window panels to all elevations with new composite panels to Watersview Estate (for Grand Junction Wharf, Pickfords Wharf, and Wharf Road).

Proposal details

Reference
P2026/0733/FUL
Alternative references
PP-14715959
Ward
St Peter's & Canalside
Agent
Ms Julia Shields
UPRN
5300097006

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 98 of 98

DocumentPublishedAction
window detialsSupporting Documentation17 Mar 2026View
upvc door systemSupporting Documentation17 Mar 2026View
composite door systemSupporting Documentation17 Mar 2026View
door detailsSupporting Documentation17 Mar 2026View
window brochuresSupporting Documentation17 Mar 2026View
Design and Access StatementSupporting Documentation17 Mar 2026View
Existing Elevations 4-8 Grand Junction WharfDrawings - Existing17 Mar 2026View
Grand Junction WharfDrawings - Existing17 Mar 2026View
SUPERSEDED grand junction wharfApplication Drawings - Superseded17 Mar 2026View
SUPERSEDED Superseded Proposed Elevations 1-2A Grand Junction WharfApplication Drawings - Superseded17 Mar 2026View
Proposed Elevations 4-8 Grand Junction WharfDrawings - Proposed17 Mar 2026View
Proposed Elevations 8-18 Grand Junction WharfDrawings - Proposed17 Mar 2026View
propsoed window schedule 9 Grand Junction WharfDrawings - Proposed17 Mar 2026View
proposed window schedule 10 Grand Junction WharfDrawings - Proposed17 Mar 2026View
SUPERSEDED proposed door schedule 1Grand Junction WharfApplication Drawings - Superseded17 Mar 2026View
proposed door schedule 2 Grand Junction WharfDrawings - Proposed17 Mar 2026View
SUPERSEDED proposed door schedule 3Grand Junction WharfApplication Drawings - Superseded17 Mar 2026View
proposed door schedule 4 Grand Junction WharfDrawings - Proposed17 Mar 2026View
proposed window schedule 3 Grand Junction WharfDrawings - Proposed17 Mar 2026View
proposed window schedule 4 Grand Junction WharfDrawings - Proposed17 Mar 2026View
proposed window schedule 7 Grand Junction WharfDrawings - Proposed17 Mar 2026View
proposed window schedule 8 Grand Junction WharfDrawings - Proposed17 Mar 2026View
1-2 Pickfords Wharf Proposed ElevationDrawings - Proposed17 Mar 2026View
3 Pickfords Wharf Existing ElevationDrawings - Existing17 Mar 2026View
Existing elevations 53a-59a Wharf RoadDrawings - Existing17 Mar 2026View
Existing elevations 60-61a Wharf RoadDrawings - Existing17 Mar 2026View
Existing elevations 49a-51a Wharf RoadDrawings - Existing17 Mar 2026View
propsoed elevations 49a-51a Wharf RoadDrawings - Proposed17 Mar 2026View
propsoed elevations 60-61a Wharf RoadDrawings - Proposed17 Mar 2026View
Proposed door schedule 1 Wharf RoadDrawings - Proposed17 Mar 2026View
Proposed door schedule 2 Wharf RoadDrawings - Proposed17 Mar 2026View
Proposed window schedule 1 Wharf RoadDrawings - Proposed17 Mar 2026View
Proposed window schedule 2 Wharf RoadDrawings - Proposed17 Mar 2026View
Proposed window schedule 3 Wharf RoadDrawings - Proposed17 Mar 2026View
Community Infrastructure Levy - Completed formSupporting Documentation17 Mar 2026View
window detailsSupporting Documentation17 Mar 2026View
upvc door systemSupporting Documentation17 Mar 2026View
upvc door systemSupporting Documentation17 Mar 2026View
composite door system 1/2Supporting Documentation17 Mar 2026View
composite door system 2/2Supporting Documentation17 Mar 2026View
composite doorSupporting Documentation17 Mar 2026View
4-18 Pickfords Wharf Existing ElevationDrawings - Existing1 May 2026View
4-18 Pickfords Wharf Existing ElevationDrawings - Existing1 May 2026View
Pickfords Wharf proposed window schedule 1Drawings - Proposed1 May 2026View
Pickfords Wharf proposed window schedule 2Drawings - Proposed1 May 2026View
Pickfords Wharf proposed window schedule 3Drawings - Proposed1 May 2026View
Pickfords Wharf proposed window schedule 4Drawings - Proposed1 May 2026View
Pickfords Wharf proposed window schedule 5Drawings - Proposed1 May 2026View
Pickfords Wharf proposed window schedule 6Drawings - Proposed1 May 2026View
Pickfords Wharf proposed window schedule 9Drawings - Proposed1 May 2026View
Pickfords Wharf proposed door schedule 2Drawings - Proposed1 May 2026View
Pickfords Wharf proposed door schedule 3Drawings - Proposed1 May 2026View
Pickfords Wharf proposed door schedule 4Drawings - Proposed1 May 2026View
Pickfords Wharf proposed door schedule 6Drawings - Proposed1 May 2026View
Pickfords Wharf proposed door schedule 2Drawings - Proposed1 May 2026View
4-18 Pickfords Wharf Proposed levationDrawings - Proposed1 May 2026View
4-18 Pickfords Wharf Proposed ElevationDrawings - Proposed1 May 2026View
3-17 Grand Junction Wharf proposed elevationsDrawings - Proposed1 May 2026View
Grand Junction Wharf proposed window schedule 9Drawings - Proposed1 May 2026View
Grand Junction Wharf proposed window schedule 10Drawings - Proposed1 May 2026View
Grand Junction Wharf proposed door schedule 1Drawings - Proposed1 May 2026View
Grand Junction Wharf proposed door schedule 2Drawings - Proposed1 May 2026View
Grand Junction Wharf proposed door schedule 3Drawings - Proposed1 May 2026View
Grand Junction Wharf proposed door schedule 4Drawings - Proposed1 May 2026View
Grand Junction Wharf proposed window schedule 5Drawings - Proposed1 May 2026View
Grand Junction Wharf proposed window schedule 6Drawings - Proposed1 May 2026View
Grand Junction Wharf proposed window schedule 7Drawings - Proposed1 May 2026View
Grand Junction Wharf proposed window schedule 8Drawings - Proposed1 May 2026View
3-7 Grand Junction Wharf existing elevationsDrawings - Existing1 May 2026View
Grand Junction Wharf proposed window schedule 1Drawings - Proposed1 May 2026View
Grand Junction Wharf proposed window schedule 2Drawings - Proposed1 May 2026View
Grand Junction Wharf proposed window schedule 3Drawings - Proposed1 May 2026View
Grand Junction Wharf proposed window schedule 4Drawings - Proposed1 May 2026View
3-17 Grand Junction Wharf existing elevationsDrawings - Existing1 May 2026View
3-17 Grand Junction Wharf proposed elevationsDrawings - Proposed1 May 2026View
3-17 Pickfords Wharf Existing elevationsDrawings - Existing12 May 2026View
3-17 Pickfords Whatf Proposed elevationsDrawings - Proposed12 May 2026View
Pickfords Wharf proposed window schedule 7Drawings - Proposed12 May 2026View
Pickfords Wharf proposed window schedule 8Drawings - Proposed12 May 2026View
pickford wharf proposed door schedule 1Drawings - Proposed12 May 2026View
pickford wharf proposed door shedule 5Drawings - Proposed12 May 2026View
3-18A Pickford Wharf Existing ElevationsDrawings - Existing12 May 2026View
3-18A Pickford Wharf Proposed ElevationDrawings - Proposed12 May 2026View
52a-59a Wharf Road Existing ElevationsDrawings - Existing12 May 2026View
52a-59a Wharf Road Proposed ElevationsDrawings - Proposed12 May 2026View
V2 DASSupporting Documentation12 May 2026View
Sustainable Design and Construction StatementSupporting Documentation12 May 2026View
waterview SC1-02 Proposed screen design and constructionSupporting Documentation12 May 2026View
waterview SC1-03 Proposed screen design and constructionSupporting Documentation12 May 2026View
1-2 A Grand Junction Wharf Rev.ADrawings - Existing28 Jul 2026View
Grand Junctin Whard Rev. A Propsoed door schedule 1Drawings - Proposed28 Jul 2026View
Grand Junction Wharf Rev. A Propsoed door schedule 3Drawings - Proposed28 Jul 2026View
1-2A Grand Junciton Wharf Rev. ADrawings - Proposed28 Jul 2026View
Location PlanLocation Plan17 Aug 2026View
Block PlanBlock Plan17 Aug 2026View
Application Form (Revised)Application Form - Redacted19 Aug 2026View
Delegated ReportDelegated Report11 Sept 2026View
Decision NoticeDecision Notice11 Sept 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Press notice start date

    Published milestoneCouncil source
  6. Site notice date

    Published milestoneCouncil source
  7. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Site notice end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  12. Extension date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  13. Dispatch date

    Published milestoneCouncil source
  14. Decision date

    Published milestoneCouncil source

Decision & conditions

Approve with conditions
Decision Notice
Planning conditions
  1. 3 YEAR CONSENT PERIOD: The development hereby permitted shall be begun not later than the expiration of three years from the date of this permission. REASON: To comply with the provisions of Section 91(1)(a) of the Town and Country Planning Act 1990 as amended by the Planning and Compulsory Purchase Act 2004 (Chapter 5).
  2. DRAWING AND DOCUMENT NUMBERS: The development hereby approved shall be carried out in accordance with the following approved plans: 2314-GJW-PPA-OS-01 Site Location Plan; 2314-GJW-PPA-OS-02 Block Plan; 2314-GJW-PA-S-01 Proposed window schedule 1; 2314-GJW-PA-S-02 Proposed window schedule 2; 2314-GJW-PA-S-03 Proposed window schedule 3; 2314-GJW-PA-S-04 Proposed window schedule 4; 2314-GJW-PA-S-05 Proposed window schedule 5; 2314-GJW-PA-S-06 Proposed window schedule 6; 2314-GJW-PA-S-07 Proposed window schedule 7; 2314-GJW-PA-S-08 Proposed window schedule 8; 2314-GJW-PA-S-09 Proposed window schedule 9; 2314-GJW-PA-S-10 Proposed window schedule 10; 2314-GJW-PA-S-11 Rev. A Proposed door schedule 1; 2314-GJW-PA-S-12 Proposed door schedule 2; 2314-GJW-PA-S-13 Rev. A Proposed door schedule 3; 2314-GJW-PA-S-14 Proposed door schedule 4; 2314-GJW-PE-01-REVA Proposed elevations 1 (no's 1-2A); 2314-GJW-PE-02 Proposed elevations 2 (no's 4-8); 2314-GJW-PE-03 Proposed elevations 3 (no's 8-18a); 2314-GJW-PE-04 Proposed elevations 4 (no's 3-17); 2314-GJW-PE-05 Proposed elevations 5 (no's 3-17); 2314-PW-PA-S-01 Proposed window schedule 1; 2314-PW-PA-S-02 Proposed window schedule 2; 2314-PW-PA-S-03 Proposed window schedule 3; 2314-PW-PA-S-04 Proposed window schedule 4; 2314-PW-PA-S-05 Proposed window schedule 5; 2314-PW-PA-S-06 Proposed window schedule 6; 2314-PW-PA-S-09 Proposed window schedule 9; 2314-PW-PA-S-11 Proposed door schedule 2; 2314-PW-PA-S-12 Proposed door schedule 3; 2314-PW-PA-S-13 Proposed door schedule 4; 2314-PW-PA-S-15 Proposed door schedule 6; 2314-PW-PA-S-16 Proposed door schedule 7; 2314-PW-PE-01 Proposed elevations 1 (no's 1 -2) 2314-PW-PE-02 Proposed elevations 2 (no's 3-18A) 2314-PW-PE-03 Proposed elevations 3 (no's 3-17) 2314-PW-PE-04 Proposed elevations 4 (no's 14-18) 2314-PW-PE-05 Proposed elevations 5 (no's 14-18) 2314-PW-PA-S-07 Proposed window schedule 7; 2314-PW-PA-S-08 Proposed window schedule 8; 2314-PW-PA-S-10 Proposed door schedule 1; 2314-PW-PA-S-14 Proposed door schedule 5 2314-WR-PA-S-01 Proposed window schedule 1; 2314-WR-PA-S-02 Proposed window schedule 2; 2314-WR-PA-S-03 Proposed window schedule 3; 2314-WR-PA-S-04 Proposed door schedule 1; 2314-WR-PA-S-05 Proposed door schedule 2; 2314-WR-PE-01 Proposed elevations 1 (no's 49a-51a); 2314-WR-PE-02 Proposed elevations 2 (no's 53a-59a); 2314-WR-PE-03 Proposed elevations 3 (no's 61-61A); Design and Access Statement Revision V2 dated February 2026 Composite Door System; Profile 22 Door System; Profile 22 Chamfered Windows and Doors; OPT-CH-03 STANDARD WINDOW DETAILS; P22-CO-DR-01 Rev. A PROFILE 22 COMPOSITE DOOR SYSTEM OPEN IN DETAILS; Watersview-SC1-02 Proposed screen design and construction; Watersview SC1-03 Proposed screen design and construction; Sustainable Design & Construction Statement dated May 2026. REASON: To comply with Section 70(1)(a) of the Town and Country Act 1990 as amended and the Reason for Grant and also for the avoidance of doubt and in the interest of proper planning.
  3. MATERIALS (COMPLIANCE): The development shall be constructed in accordance with the schedule of materials noted on the approved plans and within the Design and Access Statement Revision V2 Dated February 2026. The development shall be carried out strictly in accordance with the details so approved and shall be maintained as such thereafter. REASON: In the interest of securing sustainable development and to ensure that the resulting appearance and construction of the development is of a high standard.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.