Council planning record

Erection of a two-storey rear extension to 39 and 40 Wallace Road, the relocation of the external rear staircase and associated works.

39 and 40 Wallace Road, London, N1 2PQ

FINAL DECISIONReference: P2026/0709/FULLondon Borough of Islington

Last published check: 3 Oct 2026, 15:28. Check the council record for more recent changes.

Application location

39 and 40 Wallace Road, London, N1 2PQ

This record has no verified map location.

Application summary

Status
FINAL DECISION
Application type
Full Planning Application
Received
16 Mar 2026
Validated
14 Apr 2026
Determination deadline
1 Jun 2026
Local authority
London Borough of Islington

Application overview

Erection of a two-storey rear extension to 39 and 40 Wallace Road, the relocation of the external rear staircase and associated works.

Proposal details

Reference
P2026/0709/FUL
Alternative references
PP-14779639
Ward
Mildmay
Agent
Byron Bassington
UPRN
5300095549

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 26 of 26

DocumentPublishedAction
Location PlanLocation Plan14 Mar 2026View
Site PlanBlock Plan14 Mar 2026View
Existing GF PlanDrawings - Existing14 Mar 2026View
Existing FF PlanDrawings - Existing14 Mar 2026View
Propsoed GF planApplication Drawings - Superseded14 Mar 2026View
Proposed FF planApplication Drawings - Superseded14 Mar 2026View
Proposed Roof PlanDrawings - Proposed14 Mar 2026View
Existing Side ElevationDrawings - Existing14 Mar 2026View
Existing rear elevation (context)Drawings - Existing14 Mar 2026View
Existing rear elevationDrawings - Existing14 Mar 2026View
Existing Side ElevationDrawings - Existing14 Mar 2026View
Proposed Side ElevationApplication Drawings - Superseded14 Mar 2026View
Poposed rear elevvation (context)Application Drawings - Superseded14 Mar 2026View
Proposed rear elevationDrawings - Proposed14 Mar 2026View
Proposed Side ElevationDrawings - Proposed14 Mar 2026View
Arboricultural Impact AssessmentSupporting Documentation14 Mar 2026View
Design and Access StatementSupporting Documentation14 Mar 2026View
Fire StatementSupporting Documentation14 Mar 2026View
Community Infrastructure Levy - Completed formSupporting Documentation14 Mar 2026View
Sustainable Design and Construction StatementSupporting Documentation14 Apr 2026View
Application FormApplication Form - Redacted22 Jun 2026View
Revised GF PlanDrawings - Proposed15 Sept 2026View
Revised FF PlanDrawings - Proposed15 Sept 2026View
Revised ElevationsDrawings - Proposed15 Sept 2026View
Delegated ReportDelegated Report17 Sept 2026View
Decision NoticeDecision Notice17 Sept 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Press notice start date

    Published milestoneCouncil source
  6. Site notice date

    Published milestoneCouncil source
  7. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Site notice end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  12. Dispatch date

    Published milestoneCouncil source
  13. Decision date

    Published milestoneCouncil source
  14. Extension date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approve with conditions
Decision Notice
Planning conditions
  1. 3 YEAR CONSENT PERIOD: The development hereby permitted shall be begun not later than the expiration of three years from the date of this permission. REASON: To comply with the provisions of Section 91(1)(a) of the Town and Country Planning Act 1990 as amended by the Planning and Compulsory Purchase Act 2004 (Chapter 5).
  2. DRAWING AND DOCUMENT NUMBERS: The development hereby approved shall be carried out in accordance with the following approved plans: Location Plan dated 14-Mar-2026; A-115 Rev. 01 Proposed Plan Ground Floor; A-116 Rev. 01 Proposed Plan First Floor; A-117 Proposed Plan Roof; A-215 Proposed Elevation 01 Side; A-216 Proposed Elevation 02 Rear; A-217 Proposed elevation 02 Rear; A-218 Proposed Elevation 03 Side; A-218 Proposed Elevation 03 Side; Sustainable Design & Construction Statement; Arboricultural Impact Assessment & Method Statement (Reference BAS/39WLR/AIM/01a dated 19 January 2026). REASON: To comply with Section 70(1)(a) of the Town and Country Act 1990 as amended and the Reason for Grant and also for the avoidance of doubt and in the interest of proper planning.
  3. MATERIALS (COMPLIANCE): The development shall be constructed in accordance with the schedule of materials noted on the approved plans and within the Design & Access Statement. The development shall be carried out strictly in accordance with the details so approved and shall be maintained as such thereafter. REASON: In the interest of securing sustainable development and to ensure that the resulting appearance and construction of the development is of a high standard.
  4. TREE PROTECTION (DETAILS): Prior to the commencement of the development hereby approved (including demolition and all preparatory work), a scheme for the protection of the retained trees, in accordance with BS 5837:2012, including a tree protection plan(s) (TPP) and an arboricultural method statement (AMS) shall be submitted to and approved in writing by the Local Planning Authority. Specific issues to be dealt with in the TPP and AMS: (a) Location and installation of services/ utilities/ drainage. (b) Methods of demolition within the root protection area (RPA as defined in BS 5837: 2012) of the retained trees. (c) Details of construction within the RPA or that may impact on the retained trees. (d) A full specification for the installation of boundary treatment works. (e) A full specification for the construction of any roads, parking areas and driveways, including details of the no-dig specification and extent of the areas of the roads, parking areas and driveways to be constructed using a no-dig specification. Details shall include relevant sections through them. (f) Detailed levels and cross-sections to show that the raised levels of surfacing, where the installation of no-dig surfacing within Root Protection Areas is proposed, demonstrating that they can be accommodated where they meet with any adjacent building damp proof courses. (g) A specification for protective fencing to safeguard trees during both demolition and construction phases and a plan indicating the alignment of the protective fencing. (h) a specification for scaffolding and ground protection within tree protection zones. (i) Tree protection during construction indicated on a TPP and construction and construction activities clearly identified as prohibited in this area. (j) details of site access, temporary parking, on site welfare facilities, loading, unloading and storage of equipment, materials, fuels and waste as well concrete mixing and use of fires (k) Boundary treatments within the RPA (l) Methodology and detailed assessment of root pruning (m) Reporting of inspection and supervision (n) Methods to improve the rooting environment for retained and proposed trees and landscaping . (o) The development thereafter shall be implemented in strict accordance with the approved details. REASON: Required prior to commencement of development to satisfy the Local Planning Authority that the trees to be retained will not be damaged during demolition or construction and to protect and enhance the appearance and character of the site and locality in accordance with policies G1, G5 and G7 of the London Plan, and policies G1 and G4 of the Local Plan and pursuant to section 197 of the Town and Country Planning Act 1990.
  5. TREE INFORMATIVE: The following British Standards should be referred to in the detials submitted to discharge condition 4 (tree protection): (a) BS: 3998:2010 Tree work – Recommendations (b) BS: 5837 (2012) Trees in relation to demolition, design and construction - Recommendations
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.