Council planning record

Erection of single storey outbuilding (following demolition of existing ad hoc features) and internal refurbishments and reconfigurations including rationalisation of existing office/ancillary accommodation and all associated works (Full Planning ref: P2026/0694/FUL also submitted)

Manor Gardens Centre, 8-9 Manor Gardens, London, N7 6LA

FINAL DECISIONReference: P2026/0693/LBCLondon Borough of Islington

Last published check: 4 Oct 2026, 04:34. Check the council record for more recent changes.

Application location

Manor Gardens Centre, 8-9 Manor Gardens, London, N7 6LA

This record has no verified map location.

Application summary

Status
FINAL DECISION
Application type
Listed Building
Received
13 Mar 2026
Validated
30 Mar 2026
Determination deadline
18 May 2026
Local authority
London Borough of Islington

Application overview

Erection of single storey outbuilding (following demolition of existing ad hoc features) and internal refurbishments and reconfigurations including rationalisation of existing office/ancillary accommodation and all associated works (Full Planning ref: P2026/0694/FUL also submitted)

Proposal details

Reference
P2026/0693/LBC
Alternative references
PP-14778829
Agent
Freddie Wiltshire
UPRN
5300059865

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 1 of 1

DocumentPublishedAction
Decision NoticeDecision Notice21 Aug 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Press notice start date

    Published milestoneCouncil source
  6. Site notice date

    Published milestoneCouncil source
  7. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Site notice end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  12. Extension date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  13. Dispatch date

    Published milestoneCouncil source
  14. Decision date

    Published milestoneCouncil source

Decision & conditions

Approve with conditions
Decision Notice
Planning conditions
  1. 3 YEAR CONSENT PERIOD FOR LBC: The works hereby permitted shall be begun not later than three years from the date of this consent. REASON: To comply with the provisions of Section 18(1)(a) of the Planning (Listed Buildings and Conservation Areas) Act 1990 as amended by the Planning and Compulsory Purchase Act 2004 (Chapter 5).
  2. WORKS AND FINISHES (COMPLIANCE): All new external and internal works and finishes and works of making good to the retained fabric shall match the existing adjacent work with regard to the methods used and to material, colour, texture and profile. All such works and finishes shall be maintained as such thereafter. REASON: In order to safeguard the special architectural or historic interest of the heritage asset.
  3. EXISTING FEATURES (COMPLIANCE): All existing historic features including, but not limited to, chimney pieces, plasterwork, architraves, panelling, doors, staircase balustrading shall remain undisturbed in their existing position and shall be fully protected during the course of works on site, unless specifically authorised otherwise on the drawings hereby approved. The development and works shall not be carried out otherwise than in accordance with the details thus approved. REASON: In order to safeguard the special architectural or historic interest of the heritage asset.
  4. MATERIAL SAMPLES (DETAILS): Full details, including physical samples, of all the materials to be used on the external surfaces of the new single storey building to the rear yard, including, the brickwork, windows, signage and rainwater goods shall be submitted to and approved by the Local Planning Authority in writing before the relevant part of the work commences on site. The development shall not be carried out otherwise than in accordance with the details thus approved and shall be retained as such thereafter. REASON: In order to safeguard the special architectural or historic interest of the heritage asset.
  5. 001 – Location Plan, 002 – Block Plan, 100 – Proposed Site Plan & Elevation, 101 – Proposed Floor Plans, 200 – Proposed Elevations, Design Access & Heritage Statement prepared by Public Works Group (dated 13/03/2026), Sustainable Design & Construction Statement prepared by Public Works Group (dated 24/03/2026), Arboricultural Impact Assessment prepared by Sharon Hosegood Associates (dated June 2026)
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.