Council planning record

Internal remodelling and change to external glazing. Installtion of x2 external air bricks for MVHR system and installation of domestic misting sprinkler system (Amended plans received and amended description) [Full plan application P2026/0687/FUL also submitted].

Flat 17, Imperial Hall, 104 - 122 City Road, London, EC1V 2NR

FINAL DECISIONReference: P2026/0688/LBCLondon Borough of Islington

Last published check: 4 Oct 2026, 10:55. Check the council record for more recent changes.

Application location

Flat 17, Imperial Hall, 104 - 122 City Road, London, EC1V 2NR

This record has no verified map location.

Application summary

Status
FINAL DECISION
Application type
Listed Building
Received
13 Mar 2026
Validated
19 Mar 2026
Determination deadline
7 May 2026
Local authority
London Borough of Islington

Application overview

Internal remodelling and change to external glazing. Installtion of x2 external air bricks for MVHR system and installation of domestic misting sprinkler system (Amended plans received and amended description) [Full plan application P2026/0687/FUL also submitted].

Proposal details

Reference
P2026/0688/LBC
Alternative references
PP-14739072_C
Ward
Bunhill
Agent
Mr David Eland
UPRN
5300019921

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 1 of 1

DocumentPublishedAction
Decision NoticeDecision Notice15 Jul 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Press notice start date

    Published milestoneCouncil source
  6. Site notice date

    Published milestoneCouncil source
  7. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Site notice end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  12. Dispatch date

    Published milestoneCouncil source
  13. Decision date

    Published milestoneCouncil source
  14. Extension date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approve with conditions
Decision Notice
Planning conditions
  1. 3 YEAR CONSENT PERIOD FOR LBC and CAC: The works hereby permitted shall be begun not later than three years from the date of this consent. REASON: To comply with the provisions of Section 18(1)(a) of the Planning (Listed Buildings and Conservation Areas) Act 1990 as amended by the Planning and Compulsory Purchase Act 2004 (Chapter 5).
  2. All new external and internal works and finishes and works of making good to the retained fabric shall match the existing adjacent work with regard to the methods used and to material, colour, texture and profile. All such works and finishes shall be maintained as such thereafter.
  3. This consent relates solely to listed building matters. Should it become necessary to make alterations to the consented scheme in order to comply with other legislation, such as Building Regulations, a further consent may be required. Such a consent should be sought and obtained prior to the relevant works being undertaken.
  4. 0003-S3 REV 2, 0004-S3 REV 2, 0005-S3 REV 2, 0006-S3 REV 2, Sustainable Design and Construction Statement (February 2026), Design & Access Statement (26/03/2026) and Heritage Statement (26.03.2026).
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.