Replacement of the existing side access roof with a pitched glazed roof, together with associated drainage channel and a lead-clad upstand at the junction between the proposed roof and the existing front wall. (Listed building consent also submitted ref:P2026/0354/LBC).
Replacement of the existing side access roof with a pitched glazed roof, together with associated drainage channel and a lead-clad upstand at the junction between the proposed roof and the existing front wall. (Listed building consent also submitted ref:P2026/0354/LBC).
Reference
P2026/0353/FUL
Alternative references
PP-14602480
Ward
Finsbury Park, Tollington
Agent
Ali Afshana
UPRN
5300091406
Sign in to view all collected council fields and recorded changes.
3 YEAR CONSENT PERIOD: The development hereby permitted shall be begun not later than the expiration of three years from the date of this permission. REASON: To comply with the provisions of Section 91(1)(a) of the Town and Country Planning Act 1990 as amended by the Planning and Compulsory Purchase Act 2004 (Chapter 5).
DRAWING AND DOCUMENT NUMBERS: The development hereby approved shall be carried out in accordance with the following approved plans: Location Plan, Block Plan 250077-PL-D 0001 Rev PA, Lower Ground Floor 250077-PL-D 0002 Rev PA, Upper Ground Floor 250077-PL-D 0003 Rev PA, Section 1 250077-PL-D 0004 Rev PA, Section 2 250077-PL-D 0005 Rev PA, Front Elevation 250077-PL-D 0006 Rev PA, Rear Elevation 250077-PL-D 0007 Rev PA, Side Elevation 1 250077-PL-D 0008 Rev PA, Side Elevation 2 250077-PL-D 0009 Rev PA, Design and Access Statement, Heritage Statement and Sustainable Design & Construction Statement. REASON: To comply with Section 70(1)(a) of the Town and Country Act 1990 as amended and the Reason for Grant and also for the avoidance of doubt and in the interest of proper planning.
MATERIALS (COMPLIANCE): The development shall be constructed in accordance with the schedule of materials noted on the plans and within the Design and Access Statement. The development shall be carried out strictly in accordance with the details so approved and shall be maintained as such thereafter. REASON: In the interest of securing sustainable development and to ensure that the resulting appearance and construction of the development is of a high standard.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.