TERMINAL 2 BAGGAGE SYSTEM CROYDON ROAD HEATHROW AIRPORT
Last published check: 29 Sept 2026, 05:29. Check the council record for more recent changes.
TERMINAL 2 BAGGAGE SYSTEM CROYDON ROAD HEATHROW AIRPORT
This record has no verified map location.
Consultation under Class F of Part 8 of Schedule 2 of the General Permitted Development Order 2015 (Class F of the GPDO 2015) for the construction of a new baggage system in Terminal 2 and associated enabling works.
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| 12000-00-GA-XXX-000006 Ver 2.0 Terminal 2 BHS T1 & T2 Apron Level Eastern CampusBLOCK PLAN | 5 Aug 2024 | View |
| 11000-00-GA-300-000010 Rev 1.0 Terminal 2 BHS T1 Safe Walking Routes Apron Level 00EXISTING PLAN | 5 Aug 2024 | View |
| 11000-05-GA-300-000004 Rev 1.0 Terminal 2 BHS T1 Safe Walking Routes Baggage Mezzanine Level 05EXISTING PLAN | 5 Aug 2024 | View |
| 11000-10-GA-300-000002 Rev 1.0 Terminal 2 BHS T1 Safe Walking Routes International Departures Level 10EXISTING PLAN | 5 Aug 2024 | View |
| 11134-20-GA-40-ACM001 Ver 1.0 T2 Baggage Programme Terminal 1 Green Routes Level 20EXISTING PLAN | 5 Aug 2024 | View |
| 11134-30-GA-401-00002 Ver 3.0 T2 Baggage Programme Terminal 1 Green Routes Level 30EXISTING PLAN | 5 Aug 2024 | View |
| 11134-30-GA-20-ACM001 Ver 1.0 T2 Baggage Programme Terminal 1 Green Routes Level A0EXISTING PLAN | 5 Aug 2024 | View |
| 12000-00-GA-XXX-000005 Rev 1.0 Terminal 2 BHS T2 Safe walking Routes, Apron Level 00EXISTING PLAN | 5 Aug 2024 | View |
| 12000-20-GA-XXX-000004 Rev 1.0 Terminal 2 BHS T2 Safe walking Routes, Gates Baggage Screening Level 20EXISTING PLAN | 5 Aug 2024 | View |
| 12000-20-GA-XXX-000005 Rev 1.0 Terminal 2 BHS T2 Safe walking Routes, Baggage Mezzanine Level 25EXISTING PLAN | 5 Aug 2024 | View |
| 12000-A0-GA-XXX-000001 Rev 1.0 Terminal 2 BHS T2 Safe walking Routes, Basement Level A0EXISTING PLAN | 5 Aug 2024 | View |
| 12142-30-GA-411-ACM001 Rev 1.0 Walking Routes Layout Level 30EXISTING PLAN | 5 Aug 2024 | View |
| 12142-00-GA-200-000449 Rev 1.0 B73 T2 Baggage Programme T2 Beumer System Proposed General Arrangement Low Level, ApronPROPOSED PLAN | 5 Aug 2024 | View |
| 12142-00-GA-200-000451 Ver 1.0 T2 Baggage Programme Tranche 5, Proposed External Connector Link Level 00 Floor Plan - BeumerPROPOSED PLAN | 5 Aug 2024 | View |
| 12142-05-GA-200-000003 Rev 1.0 B73 T2 Baggage Programme T2 Beumer System Proposed General Arrangement High Level ApronPROPOSED PLAN | 5 Aug 2024 | View |
| 12142-10-GA-200-000707 Rev 1.0 B73 T2 Baggage Programme T2 Beumer System Proposed General Arrangement Arrivals LevelPROPOSED PLAN | 5 Aug 2024 | View |
| 12142-10-GA-200-000708 Ver 1.0 T2 Baggage Programme Tranche 5, Proposed External Connector Link Level 10 Floor Plan - BeumerPROPOSED PLAN | 5 Aug 2024 | View |
| 12142-20-GA-200-000528 Ver 1.0 T2 Baggage Programme Tranche 5, Proposed External Connector Link Level 20 Floor Plan - BeumerPROPOSED PLAN | 5 Aug 2024 | View |
| 12142-20-GA-200-000529 Rev 1.0 T2 Beumer System Balcony Solution, Proposed General Arrangement Gates LevelPROPOSED PLAN | 5 Aug 2024 | View |
| 12142-20-GA-920-000003 Rev 0.1 T1 Demolition T2 Connector - Post DemolitionPROPOSED PLAN | 5 Aug 2024 | View |
| 12142-25-GA-200-000004 Rev 1.0 T2 Beumer System Balcony Solution, Proposed General Arrangement Mezzanine LevelPROPOSED PLAN | 5 Aug 2024 | View |
| 12142-30-GA-200-000644 Rev 1.0 T2 Beumer System Proposed General Arrangement Departures LevelPROPOSED PLAN | 5 Aug 2024 | View |
| 12142-A0-GA-200-000315 Rev 1.0 T2 Beumer System Proposed General Arrangement Basement Level LayoutPROPOSED PLAN | 5 Aug 2024 | View |
| 12142-XX-SE-200-000159 Ver 1.0 T2 Baggage Programme Tranche 5, Proposed External Connector Link Sheet 1 Level 00 Floor Plan - BeumerPROPOSED PLAN | 5 Aug 2024 | View |
| 12142-XX-SE-200-000160 Ver 1.0 T2 Baggage Programme Tranche 5, Proposed External Connector Link Sheet 2PROPOSED PLAN | 5 Aug 2024 | View |
| 12142-XX-SE-200-000162 Ver 1.0 T2 Baggage Programme Tranche 5, Proposed External Connector Link Sheet 3PROPOSED PLAN | 5 Aug 2024 | View |
| 11000-00-GA-756-000001 Ver 1.0 Tranche 4 GSE Parking - Stand 209 Apron Level - 756 Surface Car Park Baggage Parking LayoutPLAN | 5 Aug 2024 | View |
| 11000-00-GA-756-000003 Ver 1.0 Tranche 4 GSE Parking - Nose Building Apron Level - 756 Surface Car Park Baggage Parking LayoutPLAN | 5 Aug 2024 | View |
| 11000-00-GA-922-000002 Rev 1.0 T1 Demolition Nose Building and Pier 4 Level 00DEMOLITION PLAN | 5 Aug 2024 | View |
| 11000-00-GA-922-000003 Rev 0.1 T1 Demolition Nose Building and Pier 4 - Underground Services Level 00DEMOLITION PLAN | 5 Aug 2024 | View |
| 11000-05-GA-922-000001 Rev 1.0 T1 Demolition Nose Building and Pier 4 Level 05DEMOLITION PLAN | 5 Aug 2024 | View |
| 11000-10-GA-922-000001 Rev 1.0 T1 Demolition Nose Building and Pier 4 Level 10DEMOLITION PLAN | 5 Aug 2024 | View |
| 11000-10-GA-922-000002 Rev 0.1 T1 Demolition Pier 4A/Nose Building Interface Plan Level 10DEMOLITION PLAN | 5 Aug 2024 | View |
| 11000-20-GA-922-000001 Rev 1.0 T1 Demolition Nose Building and Pier 4 Level 20DEMOLITION PLAN | 5 Aug 2024 | View |
| 11000-30-GA-922-000001 Rev 1.0 T1 Demolition Nose Building and Pier 4 Level 30DEMOLITION PLAN | 5 Aug 2024 | View |
| 12000-00-GA-212-000002 Rev 1.0 B7233 T2 Baggage Programme - Tranche 4 T2 BRF, Planning Drawings, Roof PlanPLAN | 5 Aug 2024 | View |
| 12000-00-GA-213-000035 Rev 1.0 B7233 T2 Baggage Programme - Tranche 4 T2 BRF, Planning Drawings, Site Plan GAPLAN | 5 Aug 2024 | View |
| 12000-00-GA-213-000036 Rev 1.0 B7233 T2 Baggage Programme - Tranche 4 T2 BRF, Planning Drawings, Building PlanPLAN | 5 Aug 2024 | View |
| 12000-00-GA-213-000037 Rev 1.0 B7233 T2 Baggage Programme - Tranche 4 T2 BRF, Planning Drawings, Location PlanPLAN | 5 Aug 2024 | View |
| 12000-00-GA-736-000021 Ver 1.0 Tranche 4 GSE Parking - T2A Apron Level - 736 Roads - Arrivals Call Forward Road LayoutPLAN | 5 Aug 2024 | View |
| 12000-00-GA-756-XXXXXX Ver 1.0 Tranche 4 - Enabling Works (Non Demolition) Kad Site Setting OutPLAN | 5 Aug 2024 | View |
| 12120-00-SE-213-000001 Rev 1.0 T2BP - CTA BRF & Tug Charging Relocation - Tranche 4 - Level 00 - Facade - Sections Sheet 1PLAN | 5 Aug 2024 | View |
| 12120-00-SE-213-000002 Rev 1.0 T2BP - CTA BRF & Tug Charging Relocation - Tranche 4 - Level 00 - Facade - Sections Sheet 2PLAN | 5 Aug 2024 | View |
| 12120-00-SE-213-000003 Rev 2.0 T2BP - CTA BRF & Tug Charging Relocation - Tranche 4 - Level 00 - Facade - Elevations, Sheet 1PLAN | 5 Aug 2024 | View |
| 12120-00-SE-213-000004 Rev 2.0 T2BP - CTA BRF & Tug Charging Relocation - Tranche 4 - Level 00 - Facade - Elevations, Sheet 2PLAN | 5 Aug 2024 | View |
| 12142-00-GA-922-000019 Rev 0.1 T1 Demolition T2 Connector Level 00DEMOLITION PLAN | 5 Aug 2024 | View |
| 12142-00-GA-922-000020 Rev 0.1 T1 Demolition T2 Connector - Underground Services Level 00DEMOLITION PLAN | 5 Aug 2024 | View |
| 12142-10-GA-922-000013 Rev 1.0 T1 Demolition T2 Connector - Level 10DEMOLITION PLAN | 5 Aug 2024 | View |
| 12142-20-GA-922-000014 Rev 0.2 T1 Demolition T2 Connector - Level 20DEMOLITION PLAN | 5 Aug 2024 | View |
| 12142-25-GA-922-000006 Rev 0.2 T1 Demolition T2 Connector - Level 25DEMOLITION PLAN | 5 Aug 2024 | View |
| 12142-XX-EC-904-000076 Ver 1.0 T2 Proposed Baggage Solution Required Changes of Use - GPDO SubmissionSUPPORTING INFORMATION | 5 Aug 2024 | View |
| Link Bridge CGISUPPORTING INFORMATION | 5 Aug 2024 | View |
| DECISION NOTICEDECISION NOTICE | 5 Aug 2024 | View |
| OFFICERS REPORTSOFFICERS REPORTS | 5 Aug 2024 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceConditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Related records could not be loaded.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.