Council planning record

Details pursuant to the discharge of Condition 10 (Canal Access Ramp Details) as attached to planning permission ref. 75111/APP/2022/1007 dated 21.09.2021 (Full planning permission for site clearance and preparation, including the demolition of remaining buildings, and the redevelopment of the site to provide three energy centres, two visitor reception centres, a new footpath and cycleway link to the canal towpath, works to the highway, car parking, cycle parking, associated infrastructure, enclosures and necessary physical security systems, hard and soft landscaping, and ancillary uses, as well as associated external works).

Land at Bulls Bridge Industrial Estate NORTH HYDE GARDENS HAYES UB3 4QQ

ApprovalReference: 75111/APP/2023/3239London Borough of Hillingdon

Last published check: 30 Sept 2026, 09:18. Check the council record for more recent changes.

Application location

Land at Bulls Bridge Industrial Estate NORTH HYDE GARDENS HAYES UB3 4QQ

This record has no verified map location.

Application summary

Status
Approval
Application type
Not published
Received
8 Nov 2023
Validated
8 Nov 2023
Determination deadline
17 May 2024
Local authority
London Borough of Hillingdon

Application overview

Details pursuant to the discharge of Condition 10 (Canal Access Ramp Details) as attached to planning permission ref. 75111/APP/2022/1007 dated 21.09.2021 (Full planning permission for site clearance and preparation, including the demolition of remaining buildings, and the redevelopment of the site to provide three energy centres, two visitor reception centres, a new footpath and cycleway link to the canal towpath, works to the highway, car parking, cycle parking, associated infrastructure, enclosures and necessary physical security systems, hard and soft landscaping, and ancillary uses, as well as associated external works).

Proposal details

Reference
75111/APP/2023/3239
Ward
PINKWELL 2022
Agent
Alice Gardner 2 Kingsway Cardiff CF10 3FD

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 26 of 26

DocumentPublishedAction
Application Form - Without Personal DataAPPLICATION FORM8 Nov 2023View
NWA-0571-SN-ZZ-DR-A-01-005P Rev. 02 Site Location PlanLOCATION PLAN8 Nov 2023View
HPF-0471-SEW-GL-DR-C-90110 Rev. P06 Towpath Layout SUPERSEDEDSITE LAYOUT - PROPOSED8 Nov 2023View
HPF-0471-SEW-GL-DR-C-90111 Rev. P02 Existing Towpath Remediation Layout SUPERSEDEDEXISTING PLAN8 Nov 2023View
HPF-0471-SWS-BG-DR-C-90150 Rev. P04 Towpath Existing Services SUPERSEDEDEXISTING PLAN8 Nov 2023View
HPF-0471-SEW-BG-DR-C-90140 Rev. P05 Towpath Long and Cross Sections Sheet 1 of 2 SUPERSEDEDPROPOSED SECTIONS8 Nov 2023View
HPF-0471-SEW-BG-DR-C-90141 Rev. P06 Towpath Long and Cross Sections Sheet 2 of 2 SUPERSEDEDPROPOSED SECTIONS8 Nov 2023View
HPF-0471-SEW-GL-DR-C-90190 Rev. P07 Towpath Setting Out and Levels SUPERSEDEDPLAN8 Nov 2023View
MWL-0471-SEW-GL-DR-L-100011 P5 Block 1 Towpath Design Solution SUPERSEDEDPLAN AMENDED26 Feb 2024View
HPF-0471-SEW-BG-DR-C-90141C Rev. P02 Towpath Long and Cross Sections Sheet 2 of 2 AMENDEDPLAN AMENDED26 Mar 2024View
HPF-0471-SEW-GL-DR-C-901C Rev. P04 Towpath Setting Out and Levels SUPERSEDEDPLAN AMENDED26 Mar 2024View
MWL-0471-SEW-GL-DR-L-100011 P8 Block 1 Towpath Design Solution SUPERSEDEDPLAN AMENDED26 Mar 2024View
MWL-0471-SEW-GL-DR-L-100018 P2 Block 1 Towpath Landscape Section SUPERSEDEDPLAN AMENDED26 Mar 2024View
MWL-0471-SEW-GL-DR-L-100011 P10 Block 1 Towpath Design Solution SUPERSEDEDPLAN AMENDED3 Apr 2024View
MWL-0471-SEW-GL-DR-L-100018 P4 Block 1 Towpath Landscape Section AMENDEDPLAN AMENDED3 Apr 2024View
HPF-0471-SEW-GL-DR-C-90110 Rev. C02 Towpath Layout AMENDEDPLAN AMENDED29 Apr 2024View
HPF-0471-SWS-BG-DR-C-90180 Rev. C02 Towpath Lines and Signs Layout AMENDEDPLAN AMENDED29 Apr 2024View
HPF-0471-SEW-GL-DR-C-90190 Rev. C02 Towpath Setting Out and Levels AMENDEDPLAN AMENDED29 Apr 2024View
MWL-0471-SEW-GL-DR-L-100011 P11 Block 1 Towpath Design Solution AMENDEDPLAN AMENDED29 Apr 2024View
HPF-0471-SWS-BG-DR-C-90180 Rev. P06 Towpath Lines and Signs Layout SUPERSEDEDSUPPORTING INFORMATION8 Nov 2023View
HPF-0471-SEW-XX-DR-C-90130 Rev. P05 Towpath External Works Detail Sheet 1 of 1 SUPERSEDEDSUPPORTING INFORMATION8 Nov 2023View
HPF-0471-SEW-XX-TN-C-90100 Rev. P04 Drawing General Notes Civil Engineering SUPERSEDEDSUPPORTING INFORMATION8 Nov 2023View
HPF-0471-SWS-XX-TN-C-91006 Issue P01 Towpath Technical Note (Dated 3rd November 2023) SUPERSEDEDSUPPORTING INFORMATION8 Nov 2023View
Canal Ramp Maintenance Letter (Dated 26th April 2024)SUPPORTING INFORMATION29 Apr 2024View
DECISION NOTICEDECISION NOTICE14 May 2024View
OFFICERS REPORTSOFFICERS REPORTS14 May 2024View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received

    Published milestoneCouncil source
  2. Validated

    Published milestoneCouncil source
  3. Decided

    Published milestoneCouncil source
  4. Decision By

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approval
DECISION NOTICE
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.