Council planning record

Change of use of existing nightclub (Sui Generis) to a banqueting suite (Sui Generis) and development of a hotel (Use Class C1) including the change of use of existing gymnasium (Use Class E) and associated landscaping, car and cycle spaces (Part retrospective).

FORMER REGAL CINEMA 233 HIGH STREET UXBRIDGE UB8 1LD

RefusalReference: 3638/APP/2025/2108London Borough of Hillingdon

Application location

FORMER REGAL CINEMA 233 HIGH STREET UXBRIDGE UB8 1LD

This record has no verified map location.

Application summary

Status
Refusal
Application type
Not published
Received
6 Aug 2025
Validated
11 Sept 2025
Determination deadline
25 Mar 2026
Local authority
London Borough of Hillingdon

Application overview

Change of use of existing nightclub (Sui Generis) to a banqueting suite (Sui Generis) and development of a hotel (Use Class C1) including the change of use of existing gymnasium (Use Class E) and associated landscaping, car and cycle spaces (Part retrospective).

Proposal details

Reference
3638/APP/2025/2108
Ward
UXBRIDGE 2022
Agent
Miss Amelia Hollings 5 Rayleigh Road Shenfield CM13 1AB

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 91 of 91

DocumentPublishedAction
ApplicationFormRedacted Application Form - Without Personal DataAPPLICATION FORM11 Aug 2025View
A_001 The location planLOCATION PLAN11 Aug 2025View
SUPERSEDED A_002 SUPERSEDED Proposed Block PlanBLOCK PLAN11 Aug 2025View
A100 Existing Lower Ground Floor PlanEXISTING FLOOR PLANS11 Aug 2025View
A101 Existing Ground Floor PlanEXISTING FLOOR PLANS11 Aug 2025View
A102 Existing 1st Floor PlanEXISTING FLOOR PLANS11 Aug 2025View
A103 Existing 2nd Floor PlanEXISTING FLOOR PLANS11 Aug 2025View
A104 Existing Third floor PlanEXISTING FLOOR PLANS11 Aug 2025View
A300 - As built Lower Ground Floor PlanEXISTING PLAN AMENDED16 Sept 2025View
A301 - As built Ground Floor PlanEXISTING PLAN AMENDED16 Sept 2025View
A302 - As built 1st Floor PlanEXISTING PLAN AMENDED16 Sept 2025View
A303 - As built 2nd Floor PlanEXISTING PLAN AMENDED16 Sept 2025View
A304 - As built Third floor PlanEXISTING PLAN AMENDED16 Sept 2025View
Noise Impact Assessment Document Reference: BD/CS/P25-3550/02 Rev A, August 2025, CreateNOISE ASSESSMENT11 Aug 2025View
Noise Technical Note, August 2025, File Ref: BD/CS/P25-3550/03TN, CreateNOISE ASSESSMENT11 Aug 2025View
A110 Existing street elevationsEXISTING ELEVATIONS11 Aug 2025View
A111 Existing south elevationsEXISTING ELEVATIONS11 Aug 2025View
A112 Existing west elevationsEXISTING ELEVATIONS11 Aug 2025View
A113 Existing north elevationsEXISTING ELEVATIONS11 Aug 2025View
A114 Existing east elevationsEXISTING ELEVATIONS11 Aug 2025View
A105 Existing Roof planEXISTING ROOF PLANS11 Aug 2025View
A120 Existing Section AAEXISTING SECTIONS11 Aug 2025View
A121 Existing section BEXISTING SECTIONS11 Aug 2025View
A122 Existing section CCEXISTING SECTIONS11 Aug 2025View
A123 Existing section DDEXISTING SECTIONS11 Aug 2025View
A124 Existing section EEEXISTING SECTIONS11 Aug 2025View
A125 Existing section FFEXISTING SECTIONS11 Aug 2025View
A126 Existing section GGEXISTING SECTIONS11 Aug 2025View
SUPERSEDED A200 SUPERSEDED Proposed Lower Ground Floor PlanPROPOSED FLOOR PLANS11 Aug 2025View
SUPERSEDED A201 SUPERSEDED Proposed Ground Floor PlanPROPOSED FLOOR PLANS11 Aug 2025View
SUPERSEDED A202 SUPERSEDED Proposed First Floor PlanPROPOSED FLOOR PLANS11 Aug 2025View
SUPERSEDED A203 SUPERSEDED Proposed Second Floor PlanPROPOSED FLOOR PLANS11 Aug 2025View
SUPERSEDED A204 SUPERSEDED Proposed Third Floor PlanPROPOSED FLOOR PLANS11 Aug 2025View
SUPERSEDED A201 - SUPERSEDED Proposed Ground Floor Plan (Accessibility)PROPOSED PLAN16 Sept 2025View
A_202 01 Proposed First Floor (revised)PROPOSED FLOOR PLANS2 Feb 2026View
A_203 01 Proposed Second Floor (revised)PROPOSED FLOOR PLANS2 Feb 2026View
A_204 01 Proposed Third Floor (revised)PROPOSED FLOOR PLANS2 Feb 2026View
A_201 01 Proposed Ground Floor (revised)PROPOSED FLOOR PLANS2 Feb 2026View
A_205 01 Proposed Roof Plan (revised)PROPOSED PLAN AMENDED2 Feb 2026View
A_226 01 Proposed Section GG (revised)PROPOSED PLAN AMENDED2 Feb 2026View
A221 01 Proposed Section BB (revised)PROPOSED PLAN AMENDED2 Feb 2026View
A_200 01 Proposed Basement (revised)PROPOSED FLOOR PLANS AMENDED2 Feb 2026View
SUPERSEDED A210 SUPERSEDED Proposed street elevationsPROPOSED ELEVATIONS11 Aug 2025View
SUPERSEDED A211 SUPERSEDED Proposed south elevationsPROPOSED ELEVATIONS11 Aug 2025View
SUPERSEDED A212 SUPERSEDED Proposed west elevationsPROPOSED ELEVATIONS11 Aug 2025View
SUPERSEDED A213 SUPERSEDED Proposed north elevationsPROPOSED ELEVATIONS11 Aug 2025View
A214 Proposed east elevationsPROPOSED ELEVATIONS11 Aug 2025View
A210 01 Proposed Street elevation (revised)PROPOSED ELEVATIONS2 Feb 2026View
A213 01 Proposed North Elevation (revised)PROPOSED ELEVATIONS AMENDED2 Feb 2026View
A211 01 Proposed South Elevation (revised)PROPOSED ELEVATIONS AMENDED2 Feb 2026View
A212 01 Proposed Street elevation (revised)PROPOSED ELEVATIONS AMENDED2 Feb 2026View
SUPERSEDED A205 SUPERSEDED Proposed roof planPROPOSED ROOF PLANS11 Aug 2025View
A220 Proposed Section AAPROPOSED SECTIONS11 Aug 2025View
SUPERSEDED A221 SUPERSEDED Proposed Section BBPROPOSED SECTIONS11 Aug 2025View
A222 Proposed Section CCPROPOSED SECTIONS11 Aug 2025View
A223 Proposed Section DDPROPOSED SECTIONS11 Aug 2025View
A224 Proposed Section EEPROPOSED SECTIONS11 Aug 2025View
A225 Proposed Section FFPROPOSED SECTIONS11 Aug 2025View
SUPERSEDED A226 SUPERSEDED Proposed Section GGPROPOSED SECTIONS11 Aug 2025View
Design and access statement, June 2025, Nick Willson ArchitectsDESIGN AND ACCESS STATEMENT11 Aug 2025View
Construction and Demolition Method StatementSUPPORTING INFORMATION11 Aug 2025View
Daylight and sunlight assessment, 28 July 2025, C1281/DS, Chancery GroupSUPPORTING INFORMATION11 Aug 2025View
Planning statement, August 2025, Sphere25SUPPORTING INFORMATION11 Aug 2025View
Fire Statement, 28th July 2025, Rockland Safety Services LtdSUPPORTING INFORMATION11 Aug 2025View
Structural Impact Assessment Letter, 11/07/2025, Urban Consulting EngineersSUPPORTING INFORMATION11 Aug 2025View
Odour Assessment, August 2025, Create Consulting EngineersSUPPORTING INFORMATION11 Aug 2025View
Watching brief report, November 2024, Nick Willson ArchitectsSUPPORTING INFORMATION16 Sept 2025View
Watching brief report - Mezzanine areas,January 2025, Nick Willson ArchitectsSUPPORTING INFORMATION16 Sept 2025View
Historic Fibrous Plaster Inspection & Conservation Methodology, 19/12/24, Locker & Riley (Heritage)SUPPORTING INFORMATION16 Sept 2025View
Facade study - Oriel windows to southern facadeSUPPORTING INFORMATION2 Feb 2026View
ADVERTISEMENT NOTICEADVERTISEMENT NOTICE30 Oct 2025View
Preliminary Ecological Appraisal, Ref: 451627 / SJ1, 15/01/25, Gradwell GroupECOLOGY REPORT11 Aug 2025View
Energy and Sustainability Statement - Appendix AENERGY REPORT11 Aug 2025View
Energy and Sustainability Statement - Appendix BENERGY REPORT11 Aug 2025View
Energy and Sustainability Statement - Appendix CENERGY REPORT11 Aug 2025View
Energy and Sustainability Statement - Appendix DENERGY REPORT11 Aug 2025View
Energy & Sustainability Statement, 23rd June 2025, The PESENERGY REPORT11 Aug 2025View
Land contamination assessment, Landmark InformationLAND ASSESSMENT11 Aug 2025View
Flood Risk Assessment and SuDS Report, June 2025, Nimbus Engineering ConsultantsFLOOD AND DRAINAGE ASSESSMENT11 Aug 2025View
Heritage statement, July 2025 Fuller LongCULTURAL AND HERITAGE ASSESSMENT11 Aug 2025View
The London Sustainable Drainage ProformaFLOOD AND DRAINAGE ASSESSMENT11 Aug 2025View
Sequential Test Report, June 2025, Nimbus Engineering ConsultantsFLOOD AND DRAINAGE ASSESSMENT11 Aug 2025View
Air Quality Assessment, Ref: TR/CS/P25-3550/01, August 2025, Create Consulting EngineersAIR QUALITY REPORT11 Aug 2025View
SUPERSEDED SUPERSEDED Transport Statement, 22nd July 2025, RKS AssociatesTRANSPORT ASSESSMENT11 Aug 2025View
Water Efficiency Calculations Report, June 2025, Nimbus Engineering ConsultantsFLOOD AND DRAINAGE ASSESSMENT11 Aug 2025View
SUPERSEDED SUPERSEDED Transport Statement, September 2025, RKS AssociatesTRANSPORT ASSESSMENT16 Sept 2025View
SUPERSEDED SUPERSEDED Travel Plan, September 2025, RKS AssociatesTRANSPORT ASSESSMENT16 Sept 2025View
Transport Statement, January 2026, RKS AssociatesTRANSPORT ASSESSMENT2 Feb 2026View
Travel Plan, September 2025, RKS AssociatesTRANSPORT ASSESSMENT2 Feb 2026View
DECISION NOTICEDECISION NOTICE15 Apr 2026View
Case Officer ReportOFFICER REPORT16 Apr 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received

    Published milestoneCouncil source
  2. Validated

    Published milestoneCouncil source
  3. Consultation Started

    Published milestoneCouncil source
  4. Comments Due

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision By

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Decided

    Published milestoneCouncil source

Decision & conditions

Refusal
DECISION NOTICE
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.