Council planning record

Demolition of existing buildings and erection of 2 blocks of flats comprising 38 units (7 x studio, 6 x 1-bed, 14 x 2-bed and 11 x 3-bed) with 2 disabled parking spaces and vehicular access off North Hyde Road and rear garage court areas accessed from Sandow Crescent.

THE FORMER VICTORIA PUB AND REAR GARAGE COURT AREAS ACCESSED FROM SANDOW CRESCENT 32 NORTH HYDE ROAD HAYES UB3 4NE

Withdrawn (P)Reference: 21432/APP/2021/4649London Borough of Hillingdon

Last published check: 12 Oct 2026, 04:16. Check the council record for more recent changes.

Application location

THE FORMER VICTORIA PUB AND REAR GARAGE COURT AREAS ACCESSED FROM SANDOW CRESCENT 32 NORTH HYDE ROAD HAYES UB3 4NE

This record has no verified map location.

Application summary

Status
Withdrawn (P)
Application type
Not published
Received
29 Dec 2021
Validated
29 Dec 2021
Determination deadline
7 Nov 2025
Local authority
London Borough of Hillingdon

Application overview

Demolition of existing buildings and erection of 2 blocks of flats comprising 38 units (7 x studio, 6 x 1-bed, 14 x 2-bed and 11 x 3-bed) with 2 disabled parking spaces and vehicular access off North Hyde Road and rear garage court areas accessed from Sandow Crescent.

Proposal details

Reference
21432/APP/2021/4649
Ward
BOTWELL
Agent
Mr Nick Sutton Maven Plan Limited Riverbank House, 1 Putney Bridge Approach Fulham London SW6 3JD

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 156 of 156

DocumentPublishedAction
Application Form - Without Personal DataAPPLICATION FORM31 Dec 2021View
0100 Location planLOCATION PLAN31 Dec 2021View
637- CDA-A-00-DR-A-00-0100 Rev. 04 Proposed Site Plan - SUPERSEDEDSITE LAYOUT - PROPOSED31 Dec 2021View
637-CDA-XX-00-DR-A-00-0100 Rev. 09 Proposed Site Layout Plan received 1/3/23 - REVISEDSITE LAYOUT - PROPOSED3 Mar 2023View
637-CDA-ZZ-XX-DR-A-90-0100 Rev. 02 Landscape Plan - SUPERSEDEDSITE LAYOUT - LANDSCAPING31 Dec 2021View
637 CDA ZZ XX DR A 90 0100 Rev. 07 Landscape Plan received 7/10/22 - SUPERSEDEDSITE LAYOUT - LANDSCAPING AMENDED10 Oct 2022View
637-CDA-XX-00-DR-A-00-0100 Rev. 08 Proposed Site Plan received 7/10/22 - SUPERSEDEDSITE LAYOUT - PROPOSED AMENDED10 Oct 2022View
637-CDA-A-ZZ-DR-A-01-0110 Rev. 01 Existing Former Public House Floor PlansEXISTING FLOOR PLANS31 Dec 2021View
Noise Assessment, December 2021 - SUPERSEDEDNOISE ASSESSMENT31 Dec 2021View
Noise Assessment, September 2022 received 7/10/22 - REVISEDNOISE ASSESSMENT10 Oct 2022View
637-CDA-XX-ZZ-DR-A-20-0100 Rev. 03 Block 1 Floor Plans - SUPERSEDEDPROPOSED FLOOR PLANS31 Dec 2021View
637-CDA-XX-00-DR-A-20-0100 Rev. 03 Block 2 Floor Plans (1) - SUPERSEDEDPROPOSED FLOOR PLANS31 Dec 2021View
637-CDA-XX-00-DR-A-01-0100 Rev. 04 Sitewide Ground Floor Plan - SUPERSEDEDPROPOSED FLOOR PLANS31 Dec 2021View
637-CDA-XX-02-DR-A-20-0101 Rev. 03 Block 2 Floor Plans (2) - SUPERSEDEDPROPOSED FLOOR PLANS31 Dec 2021View
637-CDA-XX-01-DR-A-01-0101 Rev. 04 Sitewide First Floor Plan - SUPERSEDEDPROPOSED FLOOR PLANS31 Dec 2021View
637-CDA-XX-02-DR-A-01-0102 Rev. 04 Sitewide Second Floor Plan - SUPERSEDEDPROPOSED FLOOR PLANS31 Dec 2021View
637-CDA-XX-03-DR-A-01-0103 Rev. 04 Sitewide Third Floor Plan - SUPERSEDEDPROPOSED FLOOR PLANS31 Dec 2021View
637-CDA-A-00-DR-A-00-0100 Rev. 05 Proposed Site / Location Plan received 19.8.22 - SUPERSEDEDPROPOSED PLAN AMENDED20 Aug 2022View
000-CDA-DR-A-15-001 Rev. 01 (North Block) Proposed Flat Type B2-0-01 Floor Plan received 1/3/23PROPOSED FLOOR PLANS3 Mar 2023View
000-CDA-DR-A-15-002 Rev. 01 (North Block) Proposed Flat Type B2-0-02 Floor Plan received 1/3/23PROPOSED FLOOR PLANS3 Mar 2023View
000-CDA-DR-A-15-007 Rev. 01 (North Block) Proposed Flat Type B2-0-07 Floor Plan received 1/3/23PROPOSED FLOOR PLANS3 Mar 2023View
000-CDA-DR-A-15-008 Rev. 01 (North Block) Proposed Flat Type B2-01-01 Floor Plan received 1/3/23PROPOSED FLOOR PLANS3 Mar 2023View
000-CDA-DR-A-15-009 Rev. 01 (North Block) Proposed Flat Type B2-01-02 Floor Plan received 1/3/23PROPOSED FLOOR PLANS3 Mar 2023View
000-CDA-DR-A-15-010 Rev. 01 (North Block) Proposed Flat Type B2-01-03 Floor Plan received 1/3/23PROPOSED FLOOR PLANS3 Mar 2023View
000-CDA-DR-A-15-011 Rev. 01 (North Block) Proposed Flat Type B2-01-04 Floor Plan received 1/3/23PROPOSED FLOOR PLANS3 Mar 2023View
000-CDA-DR-A-15-012 Rev. 01 (North Block) Proposed Flat Type B2-01-05 Floor Plan received 1/3/23PROPOSED FLOOR PLANS3 Mar 2023View
000-CDA-DR-A-15-013 Rev. 01 (North Block) Proposed Flat Type B2-01-06 Floor Plan received 1/3/23PROPOSED FLOOR PLANS3 Mar 2023View
000-CDA-DR-A-15-014 Rev. 01 (North Block) Proposed Flat Type B2-01-07 Floor Plan received 1/3/23PROPOSED FLOOR PLANS3 Mar 2023View
000-CDA-DR-A-15-015 Rev. 01 (North Block) Proposed Flat Type B2-03-02 Floor Plan received 1/3/23PROPOSED FLOOR PLANS3 Mar 2023View
000-CDA-DR-A-15-001 Rev. 01 (South Block) Proposed Flat Unit B1-0-01 Floor Plan received 1/3/23PROPOSED FLOOR PLANS3 Mar 2023View
000-CDA-DR-A-15-002 Rev. 01 (South Block) Proposed Flat Unit B1-0-02 Floor Plan received 1/3/23PROPOSED FLOOR PLANS3 Mar 2023View
000-CDA-DR-A-15-003 Rev. 01 (South Block) Proposed Flat Unit B1-0-03 Floor Plan received 1/3/23PROPOSED FLOOR PLANS3 Mar 2023View
000-CDA-DR-A-15-004 Rev. 01 (South Block) Proposed Flat Unit B1-0-04 Floor Plan received 1/3/23PROPOSED FLOOR PLANS3 Mar 2023View
000-CDA-DR-A-15-005 Rev. 01 (South Block) Proposed Flat Unit B1-01-01 Floor Plan received 1/3/23PROPOSED FLOOR PLANS3 Mar 2023View
000-CDA-DR-A-15-006 Rev. 01 (South Block) Proposed Flat Unit B1-01-02 Floor Plan received 1/3/23PROPOSED FLOOR PLANS3 Mar 2023View
000-CDA-DR-A-15-007 Rev. 01 (South Block) Proposed Flat Unit B1-01-03 Floor Plan received 1/3/23PROPOSED FLOOR PLANS3 Mar 2023View
000-CDA-DR-A-15-008 Rev. 01 (South Block) Proposed Flat Unit B1-03-01 Floor Plan received 1/3/23PROPOSED FLOOR PLANS3 Mar 2023View
000-CDA-DR-A-15-009 Rev. 01 (South Block) Proposed Flat Unit B1-03-02 Floor Plan received 1/3/23PROPOSED FLOOR PLANS3 Mar 2023View
000-CDA-DR-A-15-010 Rev. 01 (South Block) Proposed Flat Unit B1-03-03 Floor Plan received 1/3/23PROPOSED FLOOR PLANS3 Mar 2023View
000-CDA-DR-A-15-011 Rev. 01 (South Block) Proposed Flat Unit B1-03-04 Floor Plan received 1/3/23PROPOSED FLOOR PLANS3 Mar 2023View
000-CDA-DR-A-15-003 Rev. 01 (North Block) Proposed Flat Unit B2-0-03 Floor Plan received 1/3/23PROPOSED FLOOR PLANS3 Mar 2023View
000-CDA-DR-A-15-004 Rev. 01 (North Block) Proposed Flat Unit B2-0-04 Floor Plan received 1/3/23PROPOSED FLOOR PLANS3 Mar 2023View
000-CDA-DR-A-15-005 Rev. 01 (North Block) Proposed Flat Unit B2-0-05 Floor Plan received 1/3/23PROPOSED FLOOR PLANS3 Mar 2023View
000-CDA-DR-A-15-006 Rev. 01 (North Block) Proposed Flat Unit B2-0-06 Floor Plan received 1/3/23PROPOSED FLOOR PLANS3 Mar 2023View
000-CDA-DR-A-15-004 Rev. 01 (South Block) Proposed Flat B1-0-04 Floor Plan received 13.3.23 - DUPLICATEPROPOSED FLOOR PLANS14 Mar 2023View
000-CDA-B1-01-DR-A-15-012 Rev. 01 (South Block Uni Proposed Unit B1-01-04 Floor Plan received 17.3.23PROPOSED FLOOR PLANS20 Mar 2023View
637-CDA-XX-ZZ-DR-A-20-0100 Rev. 04 Proposed Block 1 Plans received 22.4.22 - SUPERSEDEDPROPOSED FLOOR PLANS AMENDED13 May 2022View
637-CDA-XX-00-DR-A-20-0100 Rev. 04 Proposed Block 2 Plans (1) received 22.4.22 - SUPERSEDEDPROPOSED FLOOR PLANS AMENDED13 May 2022View
637-CDA-XX-02-DR-A-20-0101 Rev. 04 Proposed Block 2 Plans (2) received 22.4.22 - SUPERSEDEDPROPOSED FLOOR PLANS AMENDED13 May 2022View
637-CDA-XX-01-DR-A-01-0101 Rev. 05 Sitewide First floor Plan received 22.4.22 - SUPERSEDEDPROPOSED FLOOR PLANS AMENDED13 May 2022View
637-CDA-XX-00-DR-A-01-0100 Rev. 05 Sitewide Ground Floor Plan received 22.4.22 - SUPERSEDEDPROPOSED FLOOR PLANS AMENDED13 May 2022View
637-CDA-XX-02-DR-A-01-0102 Rev. 05 Sitewide Second Floor Plans received 22.4.22 - SUPERSEDEDPROPOSED FLOOR PLANS AMENDED13 May 2022View
637-CDA-XX-03-DR-A-01-0103 Rev. 05 Sitewide Third Floor Plan received 22.4.22 - SUPERSEDEDPROPOSED FLOOR PLANS AMENDED13 May 2022View
637-CDA-XX-01-DR-A-01-0101 Rev. 06 Proposed First Floor Plan received 19/8/22 - SUPERSEDEDPROPOSED FLOOR PLANS AMENDED20 Aug 2022View
637-CDA-XX-00-DR-A-01-0100 Rev. 06 Proposed Ground Floor Plan received 19/8/22 - SUPERSEDEDPROPOSED FLOOR PLANS AMENDED20 Aug 2022View
637-CDA-XX-02-DR-A-00-0102 Rev. 06 Proposed Second Floor Plan received 19/8/22 - SUPERSEDEDPROPOSED FLOOR PLANS AMENDED20 Aug 2022View
637-CDA-XX-03-DR-A-01-0103 Rev. 06 Proposed Third Floor Plan received 19.8.22 - SUPERSEDEDPROPOSED FLOOR PLANS AMENDED20 Aug 2022View
637-CDA-XX-01-DR-A-01-0101 Rev. 09 Proposed First Floor Plan received 7/10/22 - SUPERSEDEDPROPOSED FLOOR PLANS AMENDED10 Oct 2022View
637-CDA-XX-00-DR-A-20-0100 Rev. 07 Proposed Ground and First Floor Plans (Sandow House) received 7.10.22 - SUPERSEDEDPROPOSED FLOOR PLANS AMENDED10 Oct 2022View
637-CDA-XX-00-DR-A-01-0100 Rev. 09 Proposed Ground Floor Plan received 7/10/22 - SUPERSEDEDPROPOSED FLOOR PLANS AMENDED10 Oct 2022View
637-CDA-XX-02-DR-A-20-0101 Rev. 07 Proposed Second and Third Floor Plans (Sandow House) received 7.10.22 - SUPERSEDEDPROPOSED FLOOR PLANS AMENDED10 Oct 2022View
637-CDA-XX-02-DR-A-01-0102 Rev. 09 Proposed Second Floor Plan received 7/10/22 - SUPERSEDEDPROPOSED FLOOR PLANS AMENDED10 Oct 2022View
637-CDA-XX-03-DR-A-01-0103 Rev. 09 Proposed Third Floor Plan received 7/10/22 - SUPERSEDEDPROPOSED FLOOR PLANS AMENDED10 Oct 2022View
637-CDA-XX-01-DR-A-01-0101 Rev. 10 Proposed First Floor Site Wide Plan received 1/3/23 - REVISEDPROPOSED FLOOR PLANS AMENDED2 Mar 2023View
637-CDA-XX-00-DR-A-01-0100 Rev. 10 Proposed Ground Floor Site Wide Plan received 1/3/23 - REVISEDPROPOSED FLOOR PLANS AMENDED2 Mar 2023View
637-CDA-XX-02-DR-A-01-0102 Rev. 10 Proposed Second Floor Site Wide Plan received 1/3/23 - REVISEDPROPOSED FLOOR PLANS AMENDED2 Mar 2023View
637-CDA-XX-03-DR-A-01-0103 Rev. 10 Proposed Third Floor Site Wide Plan received 1/3/23 - REVISEDPROPOSED FLOOR PLANS AMENDED2 Mar 2023View
637-CDA-XX-ZZ-DR-A-20-0100 Rev. 08 Proposed South Block Floor Plans received 1/3/23 - REVISEDPROPOSED FLOOR PLANS AMENDED2 Mar 2023View
637-CDA-XX-XX-DR-A-20-0100 Rev. 08 Proposed Ground and First Floor North Block Plans received 1/3/23 - REVISEDPROPOSED FLOOR PLANS AMENDED2 Mar 2023View
637-CDA-XX-XX-DR-A-20-0101 Rev. 08 Proposed Second and Third Floor North Block Plans received 1/3/23 - REVISEDPROPOSED FLOOR PLANS AMENDED2 Mar 2023View
000-CDA-DR-A-15-005 Rev. 02 (North Block) Proposed Flat B2-0-05 Floor Plan received 13.3.23 - REVISEDPROPOSED FLOOR PLANS AMENDED14 Mar 2023View
000-CDA-DR-A-15-001 Rev. 02 Proposed Floor Plan Unit B2-0-01 received 16.3.23 - REVISEDPROPOSED FLOOR PLANS AMENDED16 Mar 2023View
637-CDA-XX-ZZ-DR-A-20-0100 Rev. 09 Proposed South Block Floor Plans received 15.3.23 - REVISEDPROPOSED FLOOR PLANS AMENDED16 Mar 2023View
637-CDA-XX-03-DR-A-01-0103 Rev. 11 Proposed Third Floor Site Wide Plan received 15.3.23 - REVISEDPROPOSED FLOOR PLANS AMENDED16 Mar 2023View
0200 Rev. 03 Proposed Elevations - Block 1 ('Victoria House') - SUPERSEDEDPROPOSED ELEVATIONS31 Dec 2021View
0200 Rev. 04 Proposed Site Elevations - SUPERSEDEDPROPOSED ELEVATIONS31 Dec 2021View
0201 Rev. 03 Proposed Elevations - Block 2 ('Sandow House') - SUPERSEDEDPROPOSED ELEVATIONS31 Dec 2021View
637-CDA-XX-XX-DR-A-20-0200 Rev. 06 Proposed Elevations (Sandow House) received 7/10/22 - SUPERSEDEDPROPOSED ELEVATIONS AMENDED10 Oct 2022View
637-CDA-XX-ZZ-DR-A-20-0200 Rev. 06 Proposed Elevations (Victoria House) received 7/10/22 - SUPERSEDEDPROPOSED ELEVATIONS AMENDED10 Oct 2022View
637-CDA-XX-XX-DR-A-05-0200 Rev. 08 Proposed Site Elevations received 7/10/22 - SUPERSEDEDPROPOSED ELEVATIONS AMENDED10 Oct 2022View
637-CDA-XX-XX-DR-A-20-0200 Rev. 07 Proposed North Block Elevations received 1/3/23 - REVISEDPROPOSED ELEVATIONS AMENDED2 Mar 2023View
637-CDA-XX-ZZ-DR-A-20-0200 Rev. 07 Proposed South Block Elevations received 1/3/23 - REVISEDPROPOSED ELEVATIONS AMENDED2 Mar 2023View
637-CDA-XX-XX-DR-A-05-0200 Rev. 09 Proposed Site Elevations received 1/3/23 - REVISEDPROPOSED ELEVATIONS AMENDED3 Mar 2023View
637-CDA-XX-ZZ-DR-A-20-0200 Rev. 08 Proposed South Block Elevations received 15.3.23 - REVISEDPROPOSED ELEVATIONS AMENDED16 Mar 2023View
637-CDA-XX-ZZ-DR-A-20-0100 Rev. 07 Proposed Floor Plans (Victoria House) received 7/10/22 - SUPERSEDEDPROPOSED FRONT ELEVATIONS10 Oct 2022View
637-CDA-XX-04-DR-A-01-0104 Rev. 04 Sitewide Roof Level Plan - SUPERSEDEDPROPOSED ROOF PLANS31 Dec 2021View
637-CDA-XX-04-DR-A-01-0104 Rev. 05 Sitewide Roof Level Plan received 22.4.22 - SUPERSEDEDPROPOSED ROOF PLANS AMENDED13 May 2022View
637-CDA-XX-04-DR-A-01-0104 Rev. 06 Proposed Roof Plan received 19.8.22 - SUPERSEDEDPROPOSED ROOF PLANS AMENDED20 Aug 2022View
637-CDA-XX-04-DR-A-01-0104 Rev. 09 Proposed Roof Plan received 7/10/22 - SUPERSEDEDPROPOSED ROOF PLANS AMENDED10 Oct 2022View
637-CDA-XX-XX-DR-A-05-0400 Rev. 04 Proposed Sections received 7/10/22 - SUPERSEDEDPROPOSED SECTIONS AMENDED10 Oct 2022View
637-CDA-XX-04-DR-A-01-0104 Rev. 10 Proposed Roof Level Site Wide Plan received 1/3/23 - REVISEDPROPOSED ROOF PLANS AMENDED2 Mar 2023View
0800 Rev. 04 Axonometric View 01 - SUPERSEDEDPLAN31 Dec 2021View
0801 Rev. 04 Axonometric View 02 - SUPERSEDEDPLAN31 Dec 2021View
0802 Rev. 04 Axonometric View 03 - SUPERSEDEDPLAN31 Dec 2021View
0803 Rev. 04 Axonometric View 04 - SUPERSEDEDPLAN31 Dec 2021View
Design and Access Statement, November 2021 (Part 1) - SUPERSEDEDDESIGN AND ACCESS STATEMENT31 Dec 2021View
Design and Access Statement, November 2021 (Part 2) - SUPERSEDEDDESIGN AND ACCESS STATEMENT31 Dec 2021View
Design and Access Statement, August 2022 - SUPERSEDEDDESIGN AND ACCESS STATEMENT17 Aug 2022View
Design and Access Statement, Sept. 2022 (Part 1) received 7/10/22 - REVISEDDESIGN AND ACCESS STATEMENT10 Oct 2022View
Design and Access Statement, Sept. 2022 (Part 2) received 7/10/22 - REVISEDDESIGN AND ACCESS STATEMENT10 Oct 2022View
Design and Access Statement, Sept. 2022 (Part 3) received 7/10/22 - REVISEDDESIGN AND ACCESS STATEMENT10 Oct 2022View
Design and Access Statement, Sept. 2022 (Part 4) received 7/10/22 - REVISEDDESIGN AND ACCESS STATEMENT10 Oct 2022View
Design and Access Statement, January 2023 - received 1/3/23 - REVISEDDESIGN AND ACCESS STATEMENT3 Mar 2023View
A summary of the attachments in the proposalSUPPORTING INFORMATION31 Dec 2021View
CGI - Front and Rear Block User Defined Attachment - SUPERSEDEDSUPPORTING INFORMATION31 Dec 2021View
CGI - Front Block (High Resolution) User Defined Attachment - SUPERSEDEDSUPPORTING INFORMATION31 Dec 2021View
CGI - Rear Block (high Resolution) User Defined Attachment - SUPERSEDEDSUPPORTING INFORMATION31 Dec 2021View
Daylight and Sunlight Report (Neighbouring Properties) - SUPERSEDEDSUPPORTING INFORMATION31 Dec 2021View
Fire Safety Statement User Defined Attachment - SUPERSEDEDSUPPORTING INFORMATION31 Dec 2021View
Planning Statement - Final PC Version User Defined AttachmentSUPPORTING INFORMATION31 Dec 2021View
Travel Plan User Defined AttachmentSUPPORTING INFORMATION31 Dec 2021View
Viability Report - Part 1 User Defined AttachmentSUPPORTING INFORMATION31 Dec 2021View
Viability Report - Part 2 User Defined AttachmentSUPPORTING INFORMATION31 Dec 2021View
Viability Report - Part 3 User Defined AttachmentSUPPORTING INFORMATION31 Dec 2021View
Viability Report - Part 4 User Defined AttachmentSUPPORTING INFORMATION31 Dec 2021View
Daylight and Sunlight Report (Within Development) - SUPERSEDEDSUPPORTING INFORMATION15 Mar 2022View
Response to WFMO comments received 22.3.22SUPPORTING INFORMATION4 Apr 2022View
Viability Appraisal & Report received 31/3/22SUPPORTING INFORMATION27 Apr 2022View
Accommodation Schedule received 22.4.22 - SUPERSEDEDSUPPORTING INFORMATION13 May 2022View
Mark up original plans showing changes received 22/4/22SUPPORTING INFORMATION13 May 2022View
CGI 1 - Street View received 7/10/22 - REVISEDSUPPORTING INFORMATION10 Oct 2022View
CGI 2 - Front Block received 7/10/22 - REVISEDSUPPORTING INFORMATION10 Oct 2022View
CGI 3 - Rear of Front Block received 7/10/22 - REVISEDSUPPORTING INFORMATION10 Oct 2022View
CGI 4 - Rear Block received 7/10/22 - REVISEDSUPPORTING INFORMATION10 Oct 2022View
Cover Letter dated 7/10/22SUPPORTING INFORMATION10 Oct 2022View
Daylight and Sunlight Report (Neighbouring Properties) dated 30 September 2022 received 7/10/22 - REVISEDSUPPORTING INFORMATION10 Oct 2022View
Daylight and Sunlight Report (Within Development) dated 30 September 2022 received 7/10/22 - REVISEDSUPPORTING INFORMATION10 Oct 2022View
Fire Safety Statement, dated 15 September 2022 received 7/10/22 - REVISEDSUPPORTING INFORMATION10 Oct 2022View
Viability Appraisal & Report dated 7th October received 7/10/22 - REVISEDSUPPORTING INFORMATION10 Oct 2022View
Addendum 2 - Bin Store Calculation Received 30.1.23SUPPORTING INFORMATION31 Jan 2023View
Addendum 3 - Bin Lorry Access to Refuse Store received 30/1/23SUPPORTING INFORMATION31 Jan 2023View
Meeting Minutes of 3/2/23 received on 1/3/23SUPPORTING INFORMATION2 Mar 2023View
Meeting minutes of 3/2/23 with commentary received on 1/3/23SUPPORTING INFORMATION2 Mar 2023View
Applicant's Response to Daylight and Sunlight Review dated 3.11.23SUPPORTING INFORMATION13 Mar 2023View
Argent email dated 15.3.23SUPPORTING INFORMATION20 Mar 2023View
Viability Appraisal Addendum dated 17/1/23SUPPORTING INFORMATION21 Jul 2023View
ADVERTISEMENT NOTICEADVERTISEMENT NOTICE10 Feb 2022View
Air Quality Assessment, December 2021 - SUPERSEDEDAIR QUALITY REPORT31 Dec 2021View
Flood Risk and Drainage Strategy - Part 1 User Defined Attachment - SUPERSEDEDFLOOD AND DRAINAGE ASSESSMENT31 Dec 2021View
Flood Risk and Drainage Strategy - Part 2 User Defined Attachment - SUPERSEDEDFLOOD AND DRAINAGE ASSESSMENT31 Dec 2021View
Contaminated Land Risk Assessment, Phase 1 Desk Study Report dated 3/12/21 (Part 1)LAND ASSESSMENT31 Dec 2021View
Contaminated Land Risk Assessment, Phase 1 Desk Study Report dated 3/12/21 (Part 2)LAND ASSESSMENT31 Dec 2021View
Contaminated Land Risk Assessment, Phase 1 Desk Study Report dated 3/12/21 (Part 3)LAND ASSESSMENT31 Dec 2021View
Contaminated Land Risk Assessment, Phase 1 Desk Study Report dated 3/12/21 (Part 4)LAND ASSESSMENT31 Dec 2021View
Contaminated Land Risk Assessment, Phase 1 Desk Study Report dated 3/12/21 (Part 5)LAND ASSESSMENT31 Dec 2021View
Sustainability and Energy Statement, 13th December 2021 - SUPERSEDEDSUSTAINABILITY REPORT31 Dec 2021View
Transport Statement, dated 17 December 2021TRANSPORT ASSESSMENT31 Dec 2021View
Tree Survey, Arboricultural Impact Assessment and Arboricultural Method Statement, dated 13th December 2021TREE/LANDSCAPING REPORT31 Dec 2021View
Urban Greening Factor Calculation received 22.3.22TREE/LANDSCAPING REPORT4 Apr 2022View
Air Quality Assessment, September 2022 received 7/10/22 - REVISEDAIR QUALITY REPORT10 Oct 2022View
2106060-01A Flood Risk Statement and Drainage Strategy, Sept. 2022 received 7/10/22 - REVISEDFLOOD AND DRAINAGE ASSESSMENT10 Oct 2022View
Sustainability and Energy Statement, 20th September 2022 received 7/10/22ENERGY REPORT10 Oct 2022View
Transport Statement Addendum, dated 22 September 2022 received 7/10/22TRANSPORT ASSESSMENT10 Oct 2022View
Ardent Letter dated 1/3/23FLOOD AND DRAINAGE ASSESSMENT2 Mar 2023View
Legal ProformaADDITIONAL DOCUMENTS3 May 2023View
DECISION NOTICEDECISION NOTICE23 Sept 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received

    Published milestoneCouncil source
  2. Validated

    Published milestoneCouncil source
  3. Consultation Started

    Published milestoneCouncil source
  4. Comments Due

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision By

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Decided

    Published milestoneCouncil source

Decision & conditions

Withdrawn (P)
DECISION NOTICE
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.