Council planning record

Outline planning application for the demolition of all buildings and structures on site, and redevelopment of the site providing up to 37 residential dwellings, creation of a new highway access, public open space and landscaping and related infrastructure Revised Plans & Revised Description received 02.01.2020 P0248.19 Conditions(s) Condition - 18: No works shall take place in relation to any of the development hereby approved until a Construction Method Statement to control the adverse impact of the development on the amenity of the public and nearby occupiers is submitted to and approved in writing by the Local Planning Authority. The Construction Method statement shall include details of: a) parking of vehicles of site personnel and visitors; b) storage of plant and materials; c) dust management controls; d) measures for minimising the impact of noise and ,if appropriate, vibration arising from construction activities; e) predicted noise and, if appropriate, vibration levels for construction using methodologies and at points agreed with the Local Planning Authority; f) scheme for monitoring noise and if appropriate, vibration levels using methodologies and at points agreed with the Local Planning Authorities; g) siting and design of temporary buildings; h) scheme for security fencing/hoardings, depicting a readily visible 24-hour contact number for queries or emergencies; i) details of disposal of waste arising from the construction programme, including final disposal points. The burning of waste on the site at any time is specifically precluded. And the development shall be carried out in accordance with the approved scheme and statement. Condition 29: 29 Before the development hereby permitted is first commenced, vehicle cleansing facilities to prevent mud being deposited onto the public highway during construction works shall be provided on site in accordance with details to be first submitted to and approved in writing by the Local Planning Authority. The approved facilities shall be retained thereafter and used at relevant entrances to the site throughout the duration of construction works. If mud or other debris originating from the site is deposited in the public highway, all on-site operations shall cease until it has been removed. The submission will provide; a) A plan showing where vehicles will be parked within the site to be inspected for mud and debris and cleaned if required. The plan should show where construction traffic will access and exit the site from the public highway. b) A description of how the parking area will be surfaced, drained and cleaned to prevent mud, debris and muddy water being tracked onto the public highway. c) A description of how vehicles will be checked before leaving the site - this applies to the vehicle wheels, the underside of vehicles, mud flaps and wheel arches. d) A description of how vehicles will be cleaned. e) A description of how dirty/ muddy water be dealt with after being washing off the vehicles. f) A description of any contingency plan to be used in the event of a break-down of the wheel washing arrangements.

Hall Lane Miniature Golf Course Hall Lane Upminster RM14 1BS

UndecidedReference: Q0338.22London Borough of Havering

Last published check: 14 Oct 2026, 12:29. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received

    Published milestoneCouncil source
  2. Validated

    Published milestoneCouncil source
  3. Decision By

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Undecided
Application type
Not published
Received
18 Nov 2022
Validated
18 Nov 2022
Determination deadline
13 Jan 2023
Local authority
London Borough of Havering

Application overview

Outline planning application for the demolition of all buildings and structures on site, and redevelopment of the site providing up to 37 residential dwellings, creation of a new highway access, public open space and landscaping and related infrastructure Revised Plans & Revised Description received 02.01.2020 P0248.19 Conditions(s) Condition - 18: No works shall take place in relation to any of the development hereby approved until a Construction Method Statement to control the adverse impact of the development on the amenity of the public and nearby occupiers is submitted to and approved in writing by the Local Planning Authority. The Construction Method statement shall include details of: a) parking of vehicles of site personnel and visitors; b) storage of plant and materials; c) dust management controls; d) measures for minimising the impact of noise and ,if appropriate, vibration arising from construction activities; e) predicted noise and, if appropriate, vibration levels for construction using methodologies and at points agreed with the Local Planning Authority; f) scheme for monitoring noise and if appropriate, vibration levels using methodologies and at points agreed with the Local Planning Authorities; g) siting and design of temporary buildings; h) scheme for security fencing/hoardings, depicting a readily visible 24-hour contact number for queries or emergencies; i) details of disposal of waste arising from the construction programme, including final disposal points. The burning of waste on the site at any time is specifically precluded. And the development shall be carried out in accordance with the approved scheme and statement. Condition 29: 29 Before the development hereby permitted is first commenced, vehicle cleansing facilities to prevent mud being deposited onto the public highway during construction works shall be provided on site in accordance with details to be first submitted to and approved in writing by the Local Planning Authority. The approved facilities shall be retained thereafter and used at relevant entrances to the site throughout the duration of construction works. If mud or other debris originating from the site is deposited in the public highway, all on-site operations shall cease until it has been removed. The submission will provide; a) A plan showing where vehicles will be parked within the site to be inspected for mud and debris and cleaned if required. The plan should show where construction traffic will access and exit the site from the public highway. b) A description of how the parking area will be surfaced, drained and cleaned to prevent mud, debris and muddy water being tracked onto the public highway. c) A description of how vehicles will be checked before leaving the site - this applies to the vehicle wheels, the underside of vehicles, mud flaps and wheel arches. d) A description of how vehicles will be cleaned. e) A description of how dirty/ muddy water be dealt with after being washing off the vehicles. f) A description of any contingency plan to be used in the event of a break-down of the wheel washing arrangements.

Proposal details

Reference
Q0338.22
Ward
Cranham
Agent
David-John Sizer Abbey House 2 Southgate Road EN6 5DU

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Hall Lane Miniature Golf Course Hall Lane Upminster RM14 1BS

This record has no verified map location.

Documents 8 of 8

DocumentPublishedAction
Decision Letter - doc_decpomDecision Letter - doc_decpom21 Feb 2023View
Noise pollution policyEnvironmental Statement30 Nov 2022View
Flood/Surface WaterFlood/Surface Water30 Nov 2022View
Construction method statementPlanning Statement/D&A30 Nov 2022View
Application FormApplication Form30 Nov 2022View
Air and dust pollutionEnvironmental Statement30 Nov 2022View
APPLICATION ACKNOWLEDGEMENTAPPLICATION ACKNOWLEDGEMENT30 Nov 2022View
APPLICATION ACKNOWLEDGEMENTAPPLICATION ACKNOWLEDGEMENT30 Nov 2022View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Decision not yet published
Decision Letter - doc_decpom
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.