Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Land at Bridge Close Romford Havering RM7 0AU
Land at Bridge Close Romford Havering RM7 0AU
This record has no verified map location.
Hybrid planning application for 1) Full Planning Permission for the erection of three buildings comprising 383 residential units (Class C3); 1,911 sqm (GEA) of commercial floorspace (Class E use) and a 4,202 sqm (GEA) three form entry primary school and nursery (Class F1(a)); with the erection of a new pedestrian/cycle bridge; new vehicular and pedestrian arrangements; a new public square and civic square; new public realm works; and associated infrastructure and works incidental to the proposed development. 2) Outline Planning Permission with access to be considered for up to 687 residential dwellings (Class C3); community floorspace of up to 2,768 sqm (GEA) comprising a flexible health centre / commercial unit (Class E / F1 / F2) and a community centre (Class F1 / F2); up to 4,045 sqm (GEA) commercial floorspace (Class E use) comprising office and flexible workspace, retail use, professional services and leisure use; together with associated infrastructure, alterations to and provision of new vehicular and pedestrian access points; public open space, including a riverside walk; car, motorcycle and bicycle parking spaces and servicing spaces and other works incidental to the proposed development.
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| Extension of Implementation timeOfficer Report | 24 Jul 2026 | View |
| Draft Planning ObligationDraft Planning Obligation | 2 Jul 2026 | View |
| PlansPlans | 26 Aug 2025 | View |
| carbon_emission_reporting_spreadsheet OutlineEnergy/Sustainability | 29 May 2025 | View |
| carbon_emission_reporting_spreadsheet Detailed Plot BEnergy/Sustainability | 29 May 2025 | View |
| carbon_emission_reporting_spreadsheet Detailed Plot AEnergy/Sustainability | 29 May 2025 | View |
| carbon_emission_reporting_spreadsheet Detailed OverallEnergy/Sustainability | 29 May 2025 | View |
| Energy Assessment Part 2Energy/Sustainability | 29 May 2025 | View |
| Energy Assessment Part 1Energy/Sustainability | 29 May 2025 | View |
| Circular Economy Part 2Other | 29 May 2025 | View |
| Circular Economy Part 1Other | 29 May 2025 | View |
| Havering SUDSFlood/Surface Water | 29 May 2025 | View |
| Drainage Technical NoteFlood/Surface Water | 29 May 2025 | View |
| Housing Mix NoteAffordable Housing | 29 May 2025 | View |
| LAS Position StatementOther | 29 May 2025 | View |
| HICC Position StatementOther | 29 May 2025 | View |
| Bridge Close ES Addendum_May 2025_FINALEnvironmental Statement | 29 May 2025 | View |
| Appendix O - HIA Report UpdateEnvironmental Statement | 29 May 2025 | View |
| Appendix N - Stantec Response to LBH Highway Comments Part 2Environmental Statement | 29 May 2025 | View |
| Appendix N - Stantec Response to LBH Highway Comments Part 1Environmental Statement | 29 May 2025 | View |
| Appendix M - Stantec Response to GLA and TfL Highway Comments Part 4Environmental Statement | 29 May 2025 | View |
| Appendix M - Stantec Response to GLA and TfL Highway Comments Part 3Environmental Statement | 29 May 2025 | View |
| Appendix M - Stantec Response to GLA and TfL Highway Comments Part 2Environmental Statement | 29 May 2025 | View |
| Appendix M - Stantec Response to GLA and TfL Highway Comments Part 1Environmental Statement | 29 May 2025 | View |
| Appendix L - River Rom SectionsEnvironmental Statement | 29 May 2025 | View |
| Appendix K - Bat & Bird Box LocationEnvironmental Statement | 29 May 2025 | View |
| Appendix J - Ground Level Tree Assessment ResultsEnvironmental Statement | 29 May 2025 | View |
| Appendix I - River Condition AssessmentEnvironmental Statement | 29 May 2025 | View |
| Appendix H - Wind Impact Assessment_RedactedEnvironmental Statement | 29 May 2025 | View |
| Appendix G - GLA AQ ResponseEnvironmental Statement | 29 May 2025 | View |
| Appendix F - FRA Addendum_1.0Environmental Statement | 29 May 2025 | View |
| Appendix E - Environment Agency CommentsEnvironmental Statement | 29 May 2025 | View |
| Appendix D - Environment AgencyEnvironmental Statement | 29 May 2025 | View |
| Appendix C - Bridge Close - Issues Log 1Environmental Statement | 29 May 2025 | View |
| Appendix B - GLA Stage 1 ReportEnvironmental Statement | 29 May 2025 | View |
| Appendix A - Application BoundaryEnvironmental Statement | 29 May 2025 | View |
| Stantec response to LBH commentsTraffic and Transport | 29 May 2025 | View |
| Stantec response to GLA & TFL commentsTraffic and Transport | 29 May 2025 | View |
| HTN LBH Appendix ITraffic and Transport | 29 May 2025 | View |
| HTN LBH Appendix HTraffic and Transport | 29 May 2025 | View |
| HTN LBH Appendix GTraffic and Transport | 29 May 2025 | View |
| HTN LBH Appendix FTraffic and Transport | 29 May 2025 | View |
| HTN LBH Appendix ETraffic and Transport | 29 May 2025 | View |
| HTN LBH Appendix DTraffic and Transport | 29 May 2025 | View |
| HTN LBH Appendix CTraffic and Transport | 29 May 2025 | View |
| HTN LBH Appendix BTraffic and Transport | 29 May 2025 | View |
| HTN LBH Appendix ATraffic and Transport | 29 May 2025 | View |
| Stantec Response to LBH Highway CommentsTraffic and Transport | 29 May 2025 | View |
| HTN Appendix LTraffic and Transport | 29 May 2025 | View |
| HTN Appendix KTraffic and Transport | 29 May 2025 | View |
| HTN Appendix JTraffic and Transport | 29 May 2025 | View |
| HTN Appendix ITraffic and Transport | 29 May 2025 | View |
| HTN Appendix HTraffic and Transport | 29 May 2025 | View |
| HTN Appendix GTraffic and Transport | 29 May 2025 | View |
| HTN Appendix ETraffic and Transport | 29 May 2025 | View |
| HTN Appendix FTraffic and Transport | 29 May 2025 | View |
| HTN Appendix DTraffic and Transport | 29 May 2025 | View |
| HTN Appendix CTraffic and Transport | 29 May 2025 | View |
| HTN Appendix BTraffic and Transport | 29 May 2025 | View |
| HTN Appendix ATraffic and Transport | 29 May 2025 | View |
| Response to GLA and TfL Highway CommentsTraffic and Transport | 29 May 2025 | View |
| Highways Technical NotePlans | 29 May 2025 | View |
| 4236 Bridge Close Energy Assessment Report-P3Other | 28 May 2025 | View |
| 4236 Bridge Close Energy Assessment Report-P3 Part 2Other | 28 May 2025 | View |
| 4236 Bridge Close Energy Assessment Report-P3 Part 1Other | 28 May 2025 | View |
| Bridge Close Redevelopment EqIA (including Addendum) - 22112024 UpdatesOther | 28 May 2025 | View |
| OVERHEATING RISK ASSESMENTOther | 28 May 2025 | View |
| PLANNING STATEMENTOther | 28 May 2025 | View |
| AFOther | 28 May 2025 | View |
| 4236 WLCA Assessment Template 250404Other | 28 May 2025 | View |
| CLOther | 28 May 2025 | View |
| RTOther | 28 May 2025 | View |
| 4236 Bridge Close WLCA Report-P3Other | 28 May 2025 | View |
| WLCOther | 28 May 2025 | View |
| DAS VOL 1Other | 28 May 2025 | View |
| Future Bridge SketchesOther | 28 May 2025 | View |
| PLOT B DAS VOL 4 ADDENDUMOther | 28 May 2025 | View |
| PLOT B ALL SCHOOLS ISSUE SHEETOther | 28 May 2025 | View |
| PLOT B ALL SCHOOLS PRIMARY TOOLOther | 28 May 2025 | View |
| PLOT B ALL SCHOOLS GA BAY STUDIESOther | 28 May 2025 | View |
| PLOT B ALL SCHOOLS GA ELEVATIONSOther | 28 May 2025 | View |
| Detailed Bridge DrawingsPlans | 28 May 2025 | View |
| PLOT B ALL SCHOOL GA SECTIONSOther | 28 May 2025 | View |
| PLOT B ALL SCHOOL GA PLANSOther | 28 May 2025 | View |
| PLOT B ALL RESI TENURE PLANSOther | 28 May 2025 | View |
| PLOT B ALL RESI ISSUE SHEETOther | 27 May 2025 | View |
| PLOT B ALL RESI WHEAL CHAIIR USERSOther | 27 May 2025 | View |
| PLOT B ALL RESI UNIT PLANSOther | 27 May 2025 | View |
| PLOT B ALL RESI STRATEGY DRAWINGSOther | 27 May 2025 | View |
| PLOT B ALL RESI BAY STUDIESOther | 27 May 2025 | View |
| PLOT B ALL RESI GA ELEVATIONSOther | 27 May 2025 | View |
| PLOT B ALL RESI GA SECTIONSOther | 27 May 2025 | View |
| PLOT B ALL RESI GA PLANSOther | 27 May 2025 | View |
| Daylight & Sunlight School AssessmentOther | 27 May 2025 | View |
| D & S Outline Plots Masterplan OvershaowdingOther | 27 May 2025 | View |
| Window Maps combinedOther | 27 May 2025 | View |
| Daylight & Sunlight - Illustrative WithoutOther | 27 May 2025 | View |
| Daylight & Sunlight - IllustrativeOther | 27 May 2025 | View |
| Daylight & Sunlight - Max Parameter Without BalconiesOther | 27 May 2025 | View |
| PLOT A DOCUMENT ISSUE REGISTEROther | 27 May 2025 | View |
| Daylight & Sunlight - Max ParameterOther | 27 May 2025 | View |
| PLOT A SCHEDULESOther | 27 May 2025 | View |
| PLOT A DRAWINGS PLANSOther | 27 May 2025 | View |
| Fire StrategyOther | 27 May 2025 | View |
| Health Impact AssesmentOther | 27 May 2025 | View |
| PLOT A DRAWINGS SECTIONSOther | 27 May 2025 | View |
| PLOT A DRAWINGS ELEVATIONSOther | 27 May 2025 | View |
| PLOT A DRAWINGS UNIT PLANSOther | 27 May 2025 | View |
| PLOT A DRAWINGS BAY STUDYOther | 27 May 2025 | View |
| PLOT A DAS ADDENDUMOther | 27 May 2025 | View |
| Document Issue SheetOther | 23 May 2025 | View |
| SchelduleOther | 23 May 2025 | View |
| Illustrative MasterplanPlans | 23 May 2025 | View |
| PlansPlans | 23 May 2025 | View |
| PlansPlans | 23 May 2025 | View |
| MAY 2025Plans | 23 May 2025 | View |
| 8470-DAS-VOL 1 Part 1Other | 23 May 2025 | View |
| 8470-DAS-VOL 1 Part 2Other | 23 May 2025 | View |
| 8470-DAS-VOL 1 Part 3Other | 23 May 2025 | View |
| 8470-DAS-VOL 2 - P01_LR Part 1Other | 23 May 2025 | View |
| 8470-DAS-VOL 2 - P01_LR Part 2Other | 23 May 2025 | View |
| 8470-DAS-VOL 2 - P01_LR Part 3Other | 23 May 2025 | View |
| 8470-DAS-VOL 2 - P01_LR Part 4Other | 23 May 2025 | View |
| DESIGN CODE 1.2. & 3Other | 21 May 2025 | View |
| Model Log - Excel DocumentFlood/Surface Water | 9 Oct 2024 | View |
| Hydraulic Modelling ReportFlood/Surface Water | 9 Oct 2024 | View |
| Financial Viability Assessment - Executive SummaryPlanning Statement/D&A | 12 Feb 2024 | View |
| APPLICATION ACKNOWLEDGEMENTAPPLICATION ACKNOWLEDGEMENT | 19 Dec 2023 | View |
| Development SpecificationSupporting Statements | 4 Dec 2023 | View |
| Design and Access Statement Vol 4Planning Statement/D&A | 1 Dec 2023 | View |
| Water Framework Directive Compliance AssessmentPlanning Statement/D&A | 1 Dec 2023 | View |
| Waste StrategyPlanning Statement/D&A | 1 Dec 2023 | View |
| Townscape and Visual AppraisalPlanning Statement/D&A | 1 Dec 2023 | View |
| Tall Building AppraisalPlanning Statement/D&A | 1 Dec 2023 | View |
| Sustainability StatementEnergy/Sustainability | 1 Dec 2023 | View |
| Acoustic AssessmentPlanning Statement/D&A | 1 Dec 2023 | View |
| Heritage Desk Based AssessmentEnvironmental Statement | 1 Dec 2023 | View |
| Framework Travel PlanTraffic and Transport | 1 Dec 2023 | View |
| Flood Risk Assessment and Surface Water Drainage StrategyFlood/Surface Water | 1 Dec 2023 | View |
| Equalities Impact AssessmentPlanning Statement/D&A | 1 Dec 2023 | View |
| Biodiversity Net Gain ReportEcology | 1 Dec 2023 | View |
| Ecology Baseline Survey ReportEcology | 1 Dec 2023 | View |
| Arboricultural Impact AssessmentPlanning Statement/D&A | 1 Dec 2023 | View |
| Air Quality Positive StatementPlanning Statement/D&A | 1 Dec 2023 | View |
| Environmental Statement - Volume 1 Main ReportEnvironmental Statement | 1 Dec 2023 | View |
| Transport AssessmentPlanning Statement/D&A | 1 Dec 2023 | View |
| Statement of Community InvolvementPlanning Statement/D&A | 1 Dec 2023 | View |
| Plot A Residential Fire Statement Form - Signed Pg 6Planning Statement/D&A | 1 Dec 2023 | View |
| Plot A Residential Fire StatementPlanning Statement/D&A | 1 Dec 2023 | View |
| Environmental Statement Non-Technical SummaryEnvironmental Statement | 1 Dec 2023 | View |
| Plot B Residential Fire Statement Form - Signed Pg 6Planning Statement/D&A | 1 Dec 2023 | View |
| Plot B School Fire StrategyPlanning Statement/D&A | 1 Dec 2023 | View |
| Plot B Residential Fire StatementPlanning Statement/D&A | 1 Dec 2023 | View |
| Redacted Application Form - FullApplication Form | 1 Dec 2023 | View |
| Design and Access Statement Vol 3Planning Statement/D&A | 1 Dec 2023 | View |
| Daylight and Sunlight ReportPlanning Statement/D&A | 1 Dec 2023 | View |
| Design and Access Statement Vol 2Planning Statement/D&A | 1 Dec 2023 | View |
| Utilities AssessmentPlanning Statement/D&A | 1 Dec 2023 | View |
| Employment and Skills PlanPlanning Statement/D&A | 1 Dec 2023 | View |
| Soft DetailsOther | 1 Dec 2023 | View |
| Design and Access Statement Vol 1Planning Statement/D&A | 30 Nov 2023 | View |
| Redacted Application Form - OutlineApplication Form | 30 Nov 2023 | View |
| PlansPlans | 30 Nov 2023 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceWe haven’t collected any decision conditions for this application.
Related records could not be loaded.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.