Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Berol Quarter, 25 Ashley Road, Tottenham, London, N17 9LJ
Last published check: 13 Oct 2026, 21:59. Check the council record for more recent changes.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceNon-Material Amendment to Conditions 8 (BREEAM Certificates (PRE-COMMENCEMENT)), 14 (Surface Water Drainage (Pre-occupation)), 15 (Surface water network (Thames Water) (Pre-occupation)), 16 (Water network capacity (Thames Water) (Pre-occupation)), 17 (Flood Warning and Evacuation Plan (FWEP) (Pre-occupation)), 19 (Biodiversity (Pre-occupation)), 22 (Living roofs (Pre-superstructure)), 23 (Landscape and ecological management plan (LEMP) (Pre-occupation)), 24 (Energy Strategy (Pre-superstructure)), 25 (DEN Connection (Pre-superstructure)), 28 (Circular Economy (Pre-occupation)), 30 (Secured by Design (Pre-occupation)), 37 (Site Waste Management Plan (PRE-COMMENCEMENT)), 40 (London Underground Asset Protection (PRE-COMMENCEMENT)), 42 (Demolition/Construction Environmental Management Plans (PRECOMMENCEMENT)) and 44 (Management and Control of Dust (PRE-COMMENCEMENT)) of the Berol Quarter Planning Permission (ref: HGY/2025/0930) dated 30 June 2026 - to enable details to be approved under these conditions on a phase-by-phase basis.
Sign in to view all collected council fields and recorded changes.
Sign in to view collected detailsBerol Quarter, 25 Ashley Road, Tottenham, London, N17 9LJ
This record has no verified map location.
| Document | Published | Action |
|---|---|---|
| 22049_07_001_p01 location plan.pdf · PDF | 14 Sept 2026 | View |
| ApplicationFormRedacted.pdf · PDF | 14 Sept 2026 | View |
| DM Final Officer Report.pdf · PDF | 8 Oct 2026 | View |
| 2_berol_yard_s96a_covering_letter_4.pdf · PDF | 14 Sept 2026 | View |
| 22049_07_002_p01 site plan.pdf · PDF | 14 Sept 2026 | View |
| DM Decision.pdf · PDF | 9 Oct 2026 | View |
| location plan.pdf · PDF | 14 Sept 2026 | View |
Documents open on the council website. Browse council documents if a link has changed.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
No related records were published in this section.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.