Council planning record

Non-Material Amendment to Conditions 8 (BREEAM Certificates (PRE-COMMENCEMENT)), 14 (Surface Water Drainage (Pre-occupation)), 15 (Surface water network (Thames Water) (Pre-occupation)), 16 (Water network capacity (Thames Water) (Pre-occupation)), 17 (Flood Warning and Evacuation Plan (FWEP) (Pre-occupation)), 19 (Biodiversity (Pre-occupation)), 22 (Living roofs (Pre-superstructure)), 23 (Landscape and ecological management plan (LEMP) (Pre-occupation)), 24 (Energy Strategy (Pre-superstructure)), 25 (DEN Connection (Pre-superstructure)), 28 (Circular Economy (Pre-occupation)), 30 (Secured by Design (Pre-occupation)), 37 (Site Waste Management Plan (PRE-COMMENCEMENT)), 40 (London Underground Asset Protection (PRE-COMMENCEMENT)), 42 (Demolition/Construction Environmental Management Plans (PRECOMMENCEMENT)) and 44 (Management and Control of Dust (PRE-COMMENCEMENT)) of the Berol Quarter Planning Permission (ref: HGY/2025/0930) dated 30 June 2026 - to enable details to be approved under these conditions on a phase-by-phase basis.

Berol Quarter, 25 Ashley Road, Tottenham, London, N17 9LJ

Decision MadeReference: HGY/2026/2571London Borough of Haringey

Last published check: 13 Oct 2026, 21:59. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. End of Consultation Period

    Published milestoneCouncil source
  2. Valid Date

    Published milestoneCouncil source
  3. Target Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decision Made
Application type
Non-Material Amendment
Received
Not published
Validated
14 Sept 2026
Determination deadline
12 Oct 2026
Local authority
London Borough of Haringey

Application overview

Non-Material Amendment to Conditions 8 (BREEAM Certificates (PRE-COMMENCEMENT)), 14 (Surface Water Drainage (Pre-occupation)), 15 (Surface water network (Thames Water) (Pre-occupation)), 16 (Water network capacity (Thames Water) (Pre-occupation)), 17 (Flood Warning and Evacuation Plan (FWEP) (Pre-occupation)), 19 (Biodiversity (Pre-occupation)), 22 (Living roofs (Pre-superstructure)), 23 (Landscape and ecological management plan (LEMP) (Pre-occupation)), 24 (Energy Strategy (Pre-superstructure)), 25 (DEN Connection (Pre-superstructure)), 28 (Circular Economy (Pre-occupation)), 30 (Secured by Design (Pre-occupation)), 37 (Site Waste Management Plan (PRE-COMMENCEMENT)), 40 (London Underground Asset Protection (PRE-COMMENCEMENT)), 42 (Demolition/Construction Environmental Management Plans (PRECOMMENCEMENT)) and 44 (Management and Control of Dust (PRE-COMMENCEMENT)) of the Berol Quarter Planning Permission (ref: HGY/2025/0930) dated 30 June 2026 - to enable details to be approved under these conditions on a phase-by-phase basis.

Proposal details

Reference
HGY/2026/2571
Alternative references
PP-15223503
Ward
Tottenham Hale

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Berol Quarter, 25 Ashley Road, Tottenham, London, N17 9LJ

This record has no verified map location.

Documents 7 of 7

DocumentPublishedAction
22049_07_001_p01 location plan.pdf · PDF14 Sept 2026View
ApplicationFormRedacted.pdf · PDF14 Sept 2026View
DM Final Officer Report.pdf · PDF8 Oct 2026View
2_berol_yard_s96a_covering_letter_4.pdf · PDF14 Sept 2026View
22049_07_002_p01 site plan.pdf · PDF14 Sept 2026View
DM Decision.pdf · PDF9 Oct 2026View
location plan.pdf · PDF14 Sept 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Approve
DM Decision.pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.