Council planning record

Approval of details pursuant to conditions 36 and 37 (BREEAM) attached to planning permission HGY/2017/2220

Hornsey Town Hall, The Broadway, London, N8 9JH

Decision MadeReference: HGY/2026/0307London Borough of Haringey

Last published check: 13 Oct 2026, 04:55. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Decision Date

    Published milestoneCouncil source

Application summary

Status
Decision Made
Application type
Approval of details reserved by a condition
Received
Not published
Validated
Not published
Determination deadline
Not published
Local authority
London Borough of Haringey

Application overview

Approval of details pursuant to conditions 36 and 37 (BREEAM) attached to planning permission HGY/2017/2220

Proposal details

Reference
HGY/2026/0307
Alternative references
PP-14676158
Ward
Crouch End
Agent
Mr John Ferguson

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Hornsey Town Hall, The Broadway, London, N8 9JH

This record has no verified map location.

Documents 122 of 122

DocumentPublishedAction
23. Access and Space_Part4 · PDF18 May 2026View
Wst 03. Operational waste · PDF18 May 2026View
Wat 03. Water leak detection · PDF18 May 2026View
Pol 02. NOx emissions · PDF18 May 2026View
Tra 01. Sustainable transport solutions · PDF18 May 2026View
13. Temperature · PDF18 May 2026View
4. Ecology_Part1 · PDF18 May 2026View
26. Commissioning and Performance · PDF18 May 2026View
24. Recyclable Waste · PDF18 May 2026View
34. Smart Homes · PDF18 May 2026View
Ene 06. Energy efficient transportation systems · PDF18 May 2026View
18. Responsible Sourcing18 May 2026View
32. Aftercare_Part2 · PDF18 May 2026View
Wst 01. Project waste management · PDF18 May 2026View
28. Considerate Construction · PDF18 May 2026View
Appendix E MCS CertsMCS_Certificate_MCS-01489491-Z_v1 - Block A2 · PDF5 Feb 2026View
Pol 03. Flood risk management and reducing surface water run-off · PDF18 May 2026View
3. Local Amenities · PDF18 May 2026View
Appendix D Summer Overheating_Part2 · PDF18 May 2026View
1. Accessible Public Transport · PDF18 May 2026View
7. Managing the Impact of Rainfall · PDF18 May 2026View
Appendix C DrainagePol 03 b Letter from Elliot Bacon at Ardmore dated 16.10.24 · PDF5 Feb 2026View
Appendix B Ecology · PDF18 May 2026View
30. Construction Water Use · PDF18 May 2026View
Hea 05. Acoustic Performance · PDF18 May 2026View
18. Responsible Sourcing · PDF18 May 2026View
23. Access and Space_Part3 · PDF18 May 2026View
16. Decentralised Energy_Part2 · PDF18 May 2026View
Mat 03. Responsible sourcing of materials_Part3 · PDF18 May 2026View
DM Final Officer Report.pdf · PDF19 May 2026View
18. Responsible Sourcing_Part1 · PDF18 May 2026View
26. Commissioning and Performance_Part2 · PDF18 May 2026View
25. Water Efficiency · PDF18 May 2026View
13. Temperature_Part4 · PDF18 May 2026View
Appendix G RecyclingWaste routes · PDF5 Feb 2026View
32. Aftercare_Part1 · PDF18 May 2026View
Wat 02. Water monitoring · PDF18 May 2026View
18. Responsible Sourcing_Part2 · PDF18 May 2026View
Appendix A Bin Store Signsimage0065 Feb 2026View
Le 04. Enhancing site ecology · PDF18 May 2026View
Man 04. Commissioning and handover · PDF18 May 2026View
23. Access and Space · PDF18 May 2026View
Appendix C Drainage · PDF18 May 2026View
Appendix G Recyclinge. Email from Haringey Council Regarding Bin Provision · PDF5 Feb 2026View
Appendix D Summer Overheating_Part1 · PDF18 May 2026View
26. Commissioning and Performance_Part1 · PDF18 May 2026View
DM Decision.pdf · PDF19 May 2026View
HTH Remediation Plan.pdf · PDF4 Feb 2026View
Appendix C DrainageSuDS Proforma Cover Letter v2 · PDF5 Feb 2026View
14. Ventilation · PDF18 May 2026View
Mat 03. Responsible sourcing of materials_Part2 · PDF18 May 2026View
4. HQM Tracker · PDF18 May 2026View
Man 03. Responsible construction practices · PDF18 May 2026View
Appendix H Saps · PDF18 May 2026View
Appendix D Summer Overheating_Part3 · PDF18 May 2026View
15. Energy and Cost · PDF18 May 2026View
23. Access and Space_Part2 · PDF18 May 2026View
Appendix B Ecologye. Post Construction Letter from Robert Anthony at Phlorum · PDF5 Feb 2026View
Ene 01. Reduction of energy use and carbon emissions · PDF18 May 2026View
Tra 02. Proximity to amenities · PDF18 May 2026View
Appendix D Summer Overheating Assessments10687-S-OHTG-0003_1_TM59 Mews Summer Overheating Assessment Rev AB · PDF5 Feb 2026View
Wat 01. Water Consumption18 May 2026View
17. Impact on Local Air Quality · PDF18 May 2026View
Appendix A Bin Store Signs · PDF18 May 2026View
Hea 04. Thermal Comfort · PDF18 May 2026View
Appendix E MCS CertsMCS_Certificate_MCS-01489483-C_v1 - Block A1 · PDF5 Feb 2026View
HTH Condition 37.pdf · PDF4 Feb 2026View
Appendix F Durability · PDF18 May 2026View
Appendix A Bin Store SignsThumbs5 Feb 2026View
7. Managing the Impact of Rainfall_Part1 · PDF18 May 2026View
32. Aftercare_Part3 · PDF18 May 2026View
Pol 05. Reduction of noise pollution · PDF18 May 2026View
13. Temperature_Part1 · PDF18 May 2026View
5. BREEAM Submission Report · PDF18 May 2026View
13. Temperature_Part3 · PDF18 May 2026View
6. Flood Risk Assessment and Drainage Strategy · PDF18 May 2026View
Man 02. Life cycle cost and service life planning · PDF18 May 2026View
33. Home Information · PDF18 May 2026View
Man 01. Project brief and design · PDF18 May 2026View
Hea 06. Security · PDF18 May 2026View
25. Water Efficiency18 May 2026View
Le 02. Protection of ecological features · PDF18 May 2026View
13. Temperature_Part2 · PDF18 May 2026View
31. Site Waste · PDF18 May 2026View
29. Construction Energy Use · PDF18 May 2026View
11. Internal and External Noise · PDF18 May 2026View
1. HQM Submission Reports · PDF18 May 2026View
4. Ecology · PDF18 May 2026View
3. BRE HQM Feedback Report · PDF18 May 2026View
35. Post Occupancy Evaluation · PDF18 May 2026View
7. BRE BREEAM Feedback Report · PDF18 May 2026View
Tra 05. Travel plan · PDF18 May 2026View
Appendix G Recycling · PDF18 May 2026View
10. Daylight · PDF18 May 2026View
18. Responsible Sourcing_Part3 · PDF18 May 2026View
22. Drying Space · PDF18 May 2026View
ApplicationFormRedacted.pdf · PDF4 Feb 2026View
Mat 03. Responsible sourcing of materials_Part1 · PDF18 May 2026View
9. HTH Remediation Plan · PDF18 May 2026View
Appendix F Durabilityc. Letter from Elliot Bacon at Ardmore dated 11.12.24 · PDF5 Feb 2026View
8. BREEAM TrackerTracker · PDF18 May 2026View
Appendix D Summer Overheating Assessments10687-S-OHTG-0001_1_TM59 Block A Summer Overheating Assessment Rev AB · PDF5 Feb 2026View
4. Ecology_Part2 · PDF18 May 2026View
Appendix I Indoor Pollutants · PDF18 May 2026View
Appendix D Summer Overheating Assessments10687-S-OHTG-0002_2_TM59 Block B Summer Overheating Assessment Rev AB · PDF5 Feb 2026View
12. Sound Insulation · PDF18 May 2026View
Appendix A Bin Store Signs145 Feb 2026View
2. Accessible Sustainable Transport · PDF18 May 2026View
32. Aftercare · PDF18 May 2026View
Appendix E MCS CertsMCS_Certificate_MCS-01675221-E_v1 - Block B · PDF5 Feb 2026View
5. Recreational Space · PDF18 May 2026View
21. Durability of Construction Products · PDF18 May 2026View
7. Managing the Impact of Rainfall_Part2 · PDF18 May 2026View
Wat 01. Water consumption · PDF18 May 2026View
16. Decentralised Energy_Part1 · PDF18 May 2026View
23. Access and Space_Part1 · PDF18 May 2026View
Appendix G Recycling20220308_1021265 Feb 2026View
8. Security · PDF18 May 2026View
Hea 01. Visual Comfort · PDF18 May 2026View
16. Decentralised Energy · PDF18 May 2026View
13. Temperature_Part5 · PDF18 May 2026View
Appendix E MCS Certs · PDF18 May 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Approve
DM Decision.pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.