Council planning record

Variation of Condition 2 (Approved plans) of planning permission ref: HGY/2017/3020 (Partial demolition, change of use and extension of the Chocolate Factory buildings. Demolition of the remaining buildings and redevelopment to create four new build blocks ranging in height from three up to 18 storeys. Mixed use development comprising 10,657 sq.m (GIA) of commercial floorspace (flexible Use Classes A1, A3, B1, D1 and D2), 230 Class C3 residential units together with associated residential and commercial car parking, public realm works and access. This application is accompanied by an Environmental Impact Assessment.) To change the tenure of the seven market residential units located in Block E2 to affordable housing and amend the affordable housing for Block E2 to include London Affordable Rent.

Land at the Chocolate Factory and Parma House, 5, Clarendon Road, London, N22 6XJ

Decision MadeReference: HGY/2023/2436London Borough of Haringey

Last published check: 3 Oct 2026, 01:21. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Decision Date

    Published milestoneCouncil source

Application summary

Status
Decision Made
Application type
Removal/variation of conditions
Received
Not published
Validated
Not published
Determination deadline
Not published
Local authority
London Borough of Haringey

Application overview

Variation of Condition 2 (Approved plans) of planning permission ref: HGY/2017/3020 (Partial demolition, change of use and extension of the Chocolate Factory buildings. Demolition of the remaining buildings and redevelopment to create four new build blocks ranging in height from three up to 18 storeys. Mixed use development comprising 10,657 sq.m (GIA) of commercial floorspace (flexible Use Classes A1, A3, B1, D1 and D2), 230 Class C3 residential units together with associated residential and commercial car parking, public realm works and access. This application is accompanied by an Environmental Impact Assessment.) To change the tenure of the seven market residential units located in Block E2 to affordable housing and amend the affordable housing for Block E2 to include London Affordable Rent.

Proposal details

Reference
HGY/2023/2436
Alternative references
PP-12408809
Ward
Noel Park

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Land at the Chocolate Factory and Parma House, 5, Clarendon Road, London, N22 6XJ

This record has no verified map location.

Documents 179 of 179

DocumentPublishedAction
69a 25021_PL-BF-200_REV_C · PDF11 Sept 2023View
109a 25021_PL-BE2-BD-113_REV_ · PDF11 Sept 2023View
49 25021_PL-BB-110_REV_B · PDF11 Sept 2023View
145a Utilities Statement dated 02.18 · PDF11 Sept 2023View
137a Structural Report_WHOLE_Part6 · PDF16 Oct 2023View
5 PL-501 - Building 1 Existing Plan · PDF11 Sept 2023View
125a 25021_PL-BA-BF-103_REV D · PDF11 Sept 2023View
58a 25021_PL-BB-200_REV_E · PDF11 Sept 2023View
154 DAS_addendum_002.2_Part6 · PDF16 Oct 2023View
137a Structural Report_WHOLE_Part5 · PDF16 Oct 2023View
142a 25021 - Summary Commercial Acc. Schedule_rev I 01.03.21 · PDF11 Sept 2023View
171 24 Parma House As Built Elevations · PDF11 Sept 2023View
169a 20150098-Chocolate Factory-Energy letter-Rev A · PDF11 Sept 2023View
172 25 Parma House As Built_Ground Second and Third Floor Plans · PDF11 Sept 2023View
32 PL5294-04 Choc Factory Third Floor Existing Layout · PDF11 Sept 2023View
31 PL5294-03 Choc Factory Second Floor Existing Layout · PDF11 Sept 2023View
164a 25021 - Block E2 Residential Acc. Schedule_rev A_01.03.21 · PDF11 Sept 2023View
52 25021_PL-BB-113_REV_B · PDF11 Sept 2023View
151a CL13351 The Chocolate Factory - Evaluate Infographic - Feb 2018 - v2 · PDF11 Sept 2023View
167a 25021_DAS_addendum_003 01.03.2021_Part2 · PDF11 Sept 2023View
165a 25021 - Summary Residential Acc. Schedule_rev M_01.03.21 · PDF11 Sept 2023View
126a 25021_PL-BA-BF-104_REV D · PDF11 Sept 2023View
168a Chocolate Factory S96A - Transport Phasing Strategy 25.02.2021_RED · PDF11 Sept 2023View
59a 25021_PL-BB-201_REV_E · PDF11 Sept 2023View
119a 20716 - 33-3D Phased Masterplan · PDF11 Sept 2023View
102a 25021_PL-BE2-BD-106_REV_ · PDF11 Sept 2023View
143a 20150098-DK-161214-Energy Statement-Rev G (A3)-part 1 · PDF11 Sept 2023View
129a 25021 PL-A1-011 REV_ · PDF11 Sept 2023View
144a 20150098-DK-161214-Sustainability Statement-Rev G (A3)-part 2 · PDF11 Sept 2023View
30 PL5294-02 Choc Factory First Floor Existing Layout · PDF11 Sept 2023View
112a 25021_PL-BE2-202_REV_ · PDF11 Sept 2023View
110a 25021_PL-BE2-200_REV_ · PDF11 Sept 2023View
101a 25021_PL-BE2-BD-105_REV_ · PDF11 Sept 2023View
97a 25021_PL-BE2-BD-101_REV_ · PDF11 Sept 2023View
118 20716-RG-L33B-2 · PDF11 Sept 2023View
154 DAS_addendum_002.2_Part5 · PDF16 Oct 2023View
117 20716-RG-L33B-1 · PDF11 Sept 2023View
154 DAS_addendum_002.2_Part4 · PDF16 Oct 2023View
103a 25021_PL-BE2-BD-107_REV_ · PDF11 Sept 2023View
132a 25021_PL-A2-010_REV_ · PDF11 Sept 2023View
130a 25021 PL-A2-011 REV_ · PDF11 Sept 2023View
149 2018_02_16_Daylight and Sunlight Study_COMP · PDF11 Sept 2023View
146 Chocolate Factory - SCI - FEB18 · PDF11 Sept 2023View
65 25021_PL-BD-203_REV_B · PDF11 Sept 2023View
96a 25021_PL-BE2-BD-100_REV_ · PDF11 Sept 2023View
66 25021_PL-BE-200_REV_B · PDF11 Sept 2023View
133 171013 Planning Statement low res FINAL · PDF11 Sept 2023View
CFE2-DAR-XX-XX-DR-A-0016 P1 Sixth Floor July 23 · PDF11 Sept 2023View
135a Arboriculture Impact Assessment dated 09.17 · PDF11 Sept 2023View
137a Structural Report_WHOLE_Part7 · PDF16 Oct 2023View
137a Structural Report_WHOLE_Part2 · PDF16 Oct 2023View
99a 25021_PL-BE2-BD-103_REV_ · PDF11 Sept 2023View
89a 25021_PL-BE1-104_REV_ · PDF11 Sept 2023View
115a 25021_PL-BD-202_REV_D · PDF11 Sept 2023View
114a 25021_PL-BD-201_REV_C · PDF11 Sept 2023View
154 DAS_addendum_002.2_Part2 · PDF16 Oct 2023View
154 DAS_addendum_002.2_Part7 · PDF16 Oct 2023View
82 25021_PL-BE-BD-111_REV_ · PDF11 Sept 2023View
163a 25021 - Block E1 Residential Acc. Schedule_rev A_01.03.21 · PDF11 Sept 2023View
8 25021_PL-504 - Building 2 Existing Elevations · PDF11 Sept 2023View
CFE2-DAR-XX-XX-DR-A-0015 P1 Fifth Floor July 23 · PDF11 Sept 2023View
179 Phase 1 Desk Study_Part 1 · PDF11 Sept 2023View
61a 25021_PL-BB-203_REV_E · PDF11 Sept 2023View
36a 25021_PL-BA-202_REV_D · PDF11 Sept 2023View
100a 25021_PL-BE2-BD-104_REV_ · PDF11 Sept 2023View
81 25021_PL-BE-BD-110_REV_ · PDF11 Sept 2023View
175 64 PL-BD-202_REV_C · PDF16 Oct 2023View
86a 25021_PL-BE1-101_REV · PDF11 Sept 2023View
71a 25021_PL-BF-202_REV_D · PDF11 Sept 2023View
1 25021 PL 003_Rev_ · PDF11 Sept 2023View
72a 25021_PL-BF-203_REV_C · PDF11 Sept 2023View
128a 25021_PL-BA-BF-106_REV C · PDF11 Sept 2023View
84 25021_PL-BE-BD-113_REV_ · PDF11 Sept 2023View
176 67.5 PL-BE-202_REV_C · PDF16 Oct 2023View
126a 25021_PL-BA-BF-104_REV D · PDF11 Sept 2023View
131a 25021_PL-A1-010_REV_ · PDF11 Sept 2023View
144a 20150098-DK-161214-Sustainability Statement-Rev G (A3)-part 1 · PDF11 Sept 2023View
177 75 PL-BE-BD-101 Proposed Plans Blocks E - D rev C · PDF11 Sept 2023View
173 39 PL-BB-100 Proposed Plan Block B rev C · PDF11 Sept 2023View
55a PL-BB-116_REV_C · PDF11 Sept 2023View
98a 25021_PL-BE2-BD-102_REV_ · PDF11 Sept 2023View
91a 25021_PL-BE1-106_REV_ · PDF11 Sept 2023View
13 25021 PL 700 REV_ (1) · PDF11 Sept 2023View
11 25021_PL-507 - Building 4 Existing Plans and Elevations · PDF11 Sept 2023View
123a 25021_PL-BA-BF-101_REV D · PDF11 Sept 2023View
47 25021_PL-BB-108_REV_B · PDF11 Sept 2023View
46 25021_PL-BB-107_REV_B · PDF11 Sept 2023View
45 25021_PL-BB-106_REV_B · PDF11 Sept 2023View
137a Structural Report_WHOLE_Part3 · PDF16 Oct 2023View
137a Structural Report_WHOLE_Part1 · PDF16 Oct 2023View
137a Structural Report_WHOLE · PDF16 Oct 2023View
Accommodation and Areas Schedule Residential Summary Rev N 14.08.2311 Sept 2023View
9 PL-505 - Building 3 Existing Plan · PDF11 Sept 2023View
37a 25021_PL-BA-203_REV_E · PDF11 Sept 2023View
35a 25021_PL-BA-201_REV_E · PDF11 Sept 2023View
2 25021_PL-010_REV_B · PDF11 Sept 2023View
68 25021_PL-BE-203_REV_B · PDF11 Sept 2023View
44 25021_PL-BB-105_REV_B · PDF11 Sept 2023View
56a PL-BB-117_REV_B · PDF11 Sept 2023View
153a 210224 Non-Residential Floorspace schedule · PDF11 Sept 2023View
62 25021_PL-BD-200_REV_B · PDF11 Sept 2023View
107a 25021_PL-BE2-BD-111_REV_ · PDF11 Sept 2023View
51 25021_PL-BB-112_REV_B · PDF11 Sept 2023View
139 Pt1 180209 FRA4 The Chocolate Factory · PDF11 Sept 2023View
7 PL-503 - Building 2 Existing Plan · PDF11 Sept 2023View
50 25021_PL-BB-111_REV_B · PDF11 Sept 2023View
104a 25021_PL-BE2-BD-108_REV_ · PDF11 Sept 2023View
158a RWDI Chocolate Factory - Wind Microclimate Statement of Conf · PDF11 Sept 2023View
6 25021_PL-502 - Building 1 Existing Elevations · PDF11 Sept 2023View
87a 25021_PL-BE1-102_REV_ · PDF11 Sept 2023View
48 25021_PL-BB-109_REV_B · PDF11 Sept 2023View
70a 25021_PL-BF-201_REV_C · PDF11 Sept 2023View
157a RWDI response to the Wind Microclimate Review dated 090318 · PDF11 Sept 2023View
Officer Report · PDF17 May 2024View
41a 25021_PL-BB-102_REV_B · PDF11 Sept 2023View
57 25021_PL-BB-118_REV_A · PDF11 Sept 2023View
38 25021_PL-BB-099_REV_B · PDF11 Sept 2023View
53 25021_PL-BB-114_REV_B · PDF11 Sept 2023View
111a 25021_PL-BE2-201_REV_ · PDF11 Sept 2023View
10 25021_PL-506 - Building 3 Existing Elevations · PDF11 Sept 2023View
174 40 PL-BB-101 Proposed Plan Block B rev C · PDF11 Sept 2023View
83 25021_PL-BE-BD-112_REV_ · PDF11 Sept 2023View
43 25021_PL-BB-104_REV_B · PDF11 Sept 2023View
4 PL-500 -Existing Site Plan Diagram · PDF11 Sept 2023View
93a 25021_PL-BE1-200_REV_ · PDF11 Sept 2023View
154 DAS_addendum_002.2_Part1 · PDF16 Oct 2023View
85a 25021_PL-BE1-100_REV_ · PDF11 Sept 2023View
137a Structural Report_WHOLE_Part4 · PDF16 Oct 2023View
Comments from Crossrail 2 Safeguarding · PDF20 Oct 2023View
63 25021_PL-BD-201_REV_B · PDF11 Sept 2023View
54 PL-BB-115_REV_C · PDF11 Sept 2023View
42a 25021_PL-BB-103_REV_B · PDF11 Sept 2023View
3 25021_PL-011_REV_B · PDF11 Sept 2023View
14 171013 Existing GIA Floorspace Schedule and Drawings merged · PDF11 Sept 2023View
12 25021_PL-508 -Building 5 Existing Plan · PDF11 Sept 2023View
154 DAS_addendum_002.2 · PDF16 Oct 2023View
33 PL5294-05 Choc Factory Fourth and Fifth Floor Existing Layout · PDF11 Sept 2023View
29 PL5294-01 Choc Factory Ground Floor Existing Layout · PDF11 Sept 2023View
60a 25021_PL-BB-202_REV_E · PDF11 Sept 2023View
116a 25021_PL-BD-203_REV_C · PDF11 Sept 2023View
CF S73 draft cover Letter11 Sept 2023View
95a 25021_PL-BE1-202_REV_ · PDF11 Sept 2023View
34a 25021_PL-BA-200_REV_C · PDF11 Sept 2023View
90a 25021_PL-BE1-105_REV_ · PDF11 Sept 2023View
160 WG042 Chocolate Factory Methodology 200218 · PDF11 Sept 2023View
124a 25021_PL-BA-BF-102_REV D · PDF11 Sept 2023View
144a 20150098-DK-161214-Sustainability Statement-Rev G (A3)-with appendices · PDF11 Sept 2023View
105a 25021_PL-BE2-BD-109_REV_ · PDF11 Sept 2023View
92a 25021_PL-BE1-107_REV_ · PDF11 Sept 2023View
180 PL-BE-201_REV_C · PDF16 Oct 2023View
170a 210301 FINAL S96A Planning Statement · PDF11 Sept 2023View
143a 20150098-DK-161214-Energy Statement-Rev G (A3)-part 2 · PDF11 Sept 2023View
127a 25021_PL-BA-BF-105_REV D · PDF11 Sept 2023View
121a 20716 - 33-6D Phased Masterplan · PDF11 Sept 2023View
167a 25021_DAS_addendum_003 01.03.2021_Part1 · PDF11 Sept 2023View
178 76 PL-BE-BD-105 Proposed Plans Blocks E - D rev C · PDF11 Sept 2023View
DM Decision.pdf · PDF17 May 2024View
143a 20150098-DK-161214-Energy Statement-Rev G (A3)-part 3 · PDF11 Sept 2023View
156 Commercial Strategy Submission · PDF11 Sept 2023View
Accommodation and Areas Schedule Block E2 Residential Affordable Housing Rev B 14.08.2311 Sept 2023View
CFE2-DAR-XX-XX-DR-A-0012 P1 Second Floor July 23 · PDF11 Sept 2023View
108a 25021_PL-BE2-BD-112_REV_ · PDF11 Sept 2023View
106a 25021_PL-BE2-BD-110_REV_ · PDF11 Sept 2023View
CFE2-DAR-XX-XX-DR-A-0011 P1 First Floor July 23 · PDF11 Sept 2023View
148 1602082 Chocolate Factory SoC 16.02.2018 · PDF11 Sept 2023View
94a 25021_PL-BE1-201_REV_ · PDF11 Sept 2023View
120 20716-RG-L33B-4 · PDF11 Sept 2023View
88a 25021_PL-BE1-103_REV_ · PDF11 Sept 2023View
152 a Block D Residential Acc. Schedule_rev J_ 27.02.18 · PDF11 Sept 2023View
139 Pt2 180209 FRA4 The Chocolate Factory · PDF11 Sept 2023View
140a 25021 - Block B Residential Acc. Schedule_rev J 12.02.18 · PDF11 Sept 2023View
113a 25021_PL-BD-200_REV_C · PDF11 Sept 2023View
122a 25021_PL-BA-BF-100_REV D · PDF11 Sept 2023View
ApplicationFormRedacted · PDF11 Sept 2023View
CFE2-DAR-XX-XX-DR-A-0010 P1 Ground Floor July 23 · PDF11 Sept 2023View
CF-Affordable Social Rent homes · PDF11 Sept 2023View
154 DAS_addendum_002.2_Part3 · PDF16 Oct 2023View
CFE2-DAR-XX-XX-DR-A-0014 P1 Fourth Floor July 23 · PDF11 Sept 2023View
CFE2-DAR-XX-XX-DR-A-0013 P1 Third Floor July 23 · PDF11 Sept 2023View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Approve with Conditions
DM Decision.pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.