Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Land at the Chocolate Factory and Parma House, 5, Clarendon Road, London, N22 6XJ
Last published check: 3 Oct 2026, 01:21. Check the council record for more recent changes.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
Variation of Condition 2 (Approved plans) of planning permission ref: HGY/2017/3020 (Partial demolition, change of use and extension of the Chocolate Factory buildings. Demolition of the remaining buildings and redevelopment to create four new build blocks ranging in height from three up to 18 storeys. Mixed use development comprising 10,657 sq.m (GIA) of commercial floorspace (flexible Use Classes A1, A3, B1, D1 and D2), 230 Class C3 residential units together with associated residential and commercial car parking, public realm works and access. This application is accompanied by an Environmental Impact Assessment.) To change the tenure of the seven market residential units located in Block E2 to affordable housing and amend the affordable housing for Block E2 to include London Affordable Rent.
Sign in to view all collected council fields and recorded changes.
Sign in to view collected detailsLand at the Chocolate Factory and Parma House, 5, Clarendon Road, London, N22 6XJ
This record has no verified map location.
| Document | Published | Action |
|---|---|---|
| 69a 25021_PL-BF-200_REV_C · PDF | 11 Sept 2023 | View |
| 109a 25021_PL-BE2-BD-113_REV_ · PDF | 11 Sept 2023 | View |
| 49 25021_PL-BB-110_REV_B · PDF | 11 Sept 2023 | View |
| 145a Utilities Statement dated 02.18 · PDF | 11 Sept 2023 | View |
| 137a Structural Report_WHOLE_Part6 · PDF | 16 Oct 2023 | View |
| 5 PL-501 - Building 1 Existing Plan · PDF | 11 Sept 2023 | View |
| 125a 25021_PL-BA-BF-103_REV D · PDF | 11 Sept 2023 | View |
| 58a 25021_PL-BB-200_REV_E · PDF | 11 Sept 2023 | View |
| 154 DAS_addendum_002.2_Part6 · PDF | 16 Oct 2023 | View |
| 137a Structural Report_WHOLE_Part5 · PDF | 16 Oct 2023 | View |
| 142a 25021 - Summary Commercial Acc. Schedule_rev I 01.03.21 · PDF | 11 Sept 2023 | View |
| 171 24 Parma House As Built Elevations · PDF | 11 Sept 2023 | View |
| 169a 20150098-Chocolate Factory-Energy letter-Rev A · PDF | 11 Sept 2023 | View |
| 172 25 Parma House As Built_Ground Second and Third Floor Plans · PDF | 11 Sept 2023 | View |
| 32 PL5294-04 Choc Factory Third Floor Existing Layout · PDF | 11 Sept 2023 | View |
| 31 PL5294-03 Choc Factory Second Floor Existing Layout · PDF | 11 Sept 2023 | View |
| 164a 25021 - Block E2 Residential Acc. Schedule_rev A_01.03.21 · PDF | 11 Sept 2023 | View |
| 52 25021_PL-BB-113_REV_B · PDF | 11 Sept 2023 | View |
| 151a CL13351 The Chocolate Factory - Evaluate Infographic - Feb 2018 - v2 · PDF | 11 Sept 2023 | View |
| 167a 25021_DAS_addendum_003 01.03.2021_Part2 · PDF | 11 Sept 2023 | View |
| 165a 25021 - Summary Residential Acc. Schedule_rev M_01.03.21 · PDF | 11 Sept 2023 | View |
| 126a 25021_PL-BA-BF-104_REV D · PDF | 11 Sept 2023 | View |
| 168a Chocolate Factory S96A - Transport Phasing Strategy 25.02.2021_RED · PDF | 11 Sept 2023 | View |
| 59a 25021_PL-BB-201_REV_E · PDF | 11 Sept 2023 | View |
| 119a 20716 - 33-3D Phased Masterplan · PDF | 11 Sept 2023 | View |
| 102a 25021_PL-BE2-BD-106_REV_ · PDF | 11 Sept 2023 | View |
| 143a 20150098-DK-161214-Energy Statement-Rev G (A3)-part 1 · PDF | 11 Sept 2023 | View |
| 129a 25021 PL-A1-011 REV_ · PDF | 11 Sept 2023 | View |
| 144a 20150098-DK-161214-Sustainability Statement-Rev G (A3)-part 2 · PDF | 11 Sept 2023 | View |
| 30 PL5294-02 Choc Factory First Floor Existing Layout · PDF | 11 Sept 2023 | View |
| 112a 25021_PL-BE2-202_REV_ · PDF | 11 Sept 2023 | View |
| 110a 25021_PL-BE2-200_REV_ · PDF | 11 Sept 2023 | View |
| 101a 25021_PL-BE2-BD-105_REV_ · PDF | 11 Sept 2023 | View |
| 97a 25021_PL-BE2-BD-101_REV_ · PDF | 11 Sept 2023 | View |
| 118 20716-RG-L33B-2 · PDF | 11 Sept 2023 | View |
| 154 DAS_addendum_002.2_Part5 · PDF | 16 Oct 2023 | View |
| 117 20716-RG-L33B-1 · PDF | 11 Sept 2023 | View |
| 154 DAS_addendum_002.2_Part4 · PDF | 16 Oct 2023 | View |
| 103a 25021_PL-BE2-BD-107_REV_ · PDF | 11 Sept 2023 | View |
| 132a 25021_PL-A2-010_REV_ · PDF | 11 Sept 2023 | View |
| 130a 25021 PL-A2-011 REV_ · PDF | 11 Sept 2023 | View |
| 149 2018_02_16_Daylight and Sunlight Study_COMP · PDF | 11 Sept 2023 | View |
| 146 Chocolate Factory - SCI - FEB18 · PDF | 11 Sept 2023 | View |
| 65 25021_PL-BD-203_REV_B · PDF | 11 Sept 2023 | View |
| 96a 25021_PL-BE2-BD-100_REV_ · PDF | 11 Sept 2023 | View |
| 66 25021_PL-BE-200_REV_B · PDF | 11 Sept 2023 | View |
| 133 171013 Planning Statement low res FINAL · PDF | 11 Sept 2023 | View |
| CFE2-DAR-XX-XX-DR-A-0016 P1 Sixth Floor July 23 · PDF | 11 Sept 2023 | View |
| 135a Arboriculture Impact Assessment dated 09.17 · PDF | 11 Sept 2023 | View |
| 137a Structural Report_WHOLE_Part7 · PDF | 16 Oct 2023 | View |
| 137a Structural Report_WHOLE_Part2 · PDF | 16 Oct 2023 | View |
| 99a 25021_PL-BE2-BD-103_REV_ · PDF | 11 Sept 2023 | View |
| 89a 25021_PL-BE1-104_REV_ · PDF | 11 Sept 2023 | View |
| 115a 25021_PL-BD-202_REV_D · PDF | 11 Sept 2023 | View |
| 114a 25021_PL-BD-201_REV_C · PDF | 11 Sept 2023 | View |
| 154 DAS_addendum_002.2_Part2 · PDF | 16 Oct 2023 | View |
| 154 DAS_addendum_002.2_Part7 · PDF | 16 Oct 2023 | View |
| 82 25021_PL-BE-BD-111_REV_ · PDF | 11 Sept 2023 | View |
| 163a 25021 - Block E1 Residential Acc. Schedule_rev A_01.03.21 · PDF | 11 Sept 2023 | View |
| 8 25021_PL-504 - Building 2 Existing Elevations · PDF | 11 Sept 2023 | View |
| CFE2-DAR-XX-XX-DR-A-0015 P1 Fifth Floor July 23 · PDF | 11 Sept 2023 | View |
| 179 Phase 1 Desk Study_Part 1 · PDF | 11 Sept 2023 | View |
| 61a 25021_PL-BB-203_REV_E · PDF | 11 Sept 2023 | View |
| 36a 25021_PL-BA-202_REV_D · PDF | 11 Sept 2023 | View |
| 100a 25021_PL-BE2-BD-104_REV_ · PDF | 11 Sept 2023 | View |
| 81 25021_PL-BE-BD-110_REV_ · PDF | 11 Sept 2023 | View |
| 175 64 PL-BD-202_REV_C · PDF | 16 Oct 2023 | View |
| 86a 25021_PL-BE1-101_REV · PDF | 11 Sept 2023 | View |
| 71a 25021_PL-BF-202_REV_D · PDF | 11 Sept 2023 | View |
| 1 25021 PL 003_Rev_ · PDF | 11 Sept 2023 | View |
| 72a 25021_PL-BF-203_REV_C · PDF | 11 Sept 2023 | View |
| 128a 25021_PL-BA-BF-106_REV C · PDF | 11 Sept 2023 | View |
| 84 25021_PL-BE-BD-113_REV_ · PDF | 11 Sept 2023 | View |
| 176 67.5 PL-BE-202_REV_C · PDF | 16 Oct 2023 | View |
| 126a 25021_PL-BA-BF-104_REV D · PDF | 11 Sept 2023 | View |
| 131a 25021_PL-A1-010_REV_ · PDF | 11 Sept 2023 | View |
| 144a 20150098-DK-161214-Sustainability Statement-Rev G (A3)-part 1 · PDF | 11 Sept 2023 | View |
| 177 75 PL-BE-BD-101 Proposed Plans Blocks E - D rev C · PDF | 11 Sept 2023 | View |
| 173 39 PL-BB-100 Proposed Plan Block B rev C · PDF | 11 Sept 2023 | View |
| 55a PL-BB-116_REV_C · PDF | 11 Sept 2023 | View |
| 98a 25021_PL-BE2-BD-102_REV_ · PDF | 11 Sept 2023 | View |
| 91a 25021_PL-BE1-106_REV_ · PDF | 11 Sept 2023 | View |
| 13 25021 PL 700 REV_ (1) · PDF | 11 Sept 2023 | View |
| 11 25021_PL-507 - Building 4 Existing Plans and Elevations · PDF | 11 Sept 2023 | View |
| 123a 25021_PL-BA-BF-101_REV D · PDF | 11 Sept 2023 | View |
| 47 25021_PL-BB-108_REV_B · PDF | 11 Sept 2023 | View |
| 46 25021_PL-BB-107_REV_B · PDF | 11 Sept 2023 | View |
| 45 25021_PL-BB-106_REV_B · PDF | 11 Sept 2023 | View |
| 137a Structural Report_WHOLE_Part3 · PDF | 16 Oct 2023 | View |
| 137a Structural Report_WHOLE_Part1 · PDF | 16 Oct 2023 | View |
| 137a Structural Report_WHOLE · PDF | 16 Oct 2023 | View |
| Accommodation and Areas Schedule Residential Summary Rev N 14.08.23 | 11 Sept 2023 | View |
| 9 PL-505 - Building 3 Existing Plan · PDF | 11 Sept 2023 | View |
| 37a 25021_PL-BA-203_REV_E · PDF | 11 Sept 2023 | View |
| 35a 25021_PL-BA-201_REV_E · PDF | 11 Sept 2023 | View |
| 2 25021_PL-010_REV_B · PDF | 11 Sept 2023 | View |
| 68 25021_PL-BE-203_REV_B · PDF | 11 Sept 2023 | View |
| 44 25021_PL-BB-105_REV_B · PDF | 11 Sept 2023 | View |
| 56a PL-BB-117_REV_B · PDF | 11 Sept 2023 | View |
| 153a 210224 Non-Residential Floorspace schedule · PDF | 11 Sept 2023 | View |
| 62 25021_PL-BD-200_REV_B · PDF | 11 Sept 2023 | View |
| 107a 25021_PL-BE2-BD-111_REV_ · PDF | 11 Sept 2023 | View |
| 51 25021_PL-BB-112_REV_B · PDF | 11 Sept 2023 | View |
| 139 Pt1 180209 FRA4 The Chocolate Factory · PDF | 11 Sept 2023 | View |
| 7 PL-503 - Building 2 Existing Plan · PDF | 11 Sept 2023 | View |
| 50 25021_PL-BB-111_REV_B · PDF | 11 Sept 2023 | View |
| 104a 25021_PL-BE2-BD-108_REV_ · PDF | 11 Sept 2023 | View |
| 158a RWDI Chocolate Factory - Wind Microclimate Statement of Conf · PDF | 11 Sept 2023 | View |
| 6 25021_PL-502 - Building 1 Existing Elevations · PDF | 11 Sept 2023 | View |
| 87a 25021_PL-BE1-102_REV_ · PDF | 11 Sept 2023 | View |
| 48 25021_PL-BB-109_REV_B · PDF | 11 Sept 2023 | View |
| 70a 25021_PL-BF-201_REV_C · PDF | 11 Sept 2023 | View |
| 157a RWDI response to the Wind Microclimate Review dated 090318 · PDF | 11 Sept 2023 | View |
| Officer Report · PDF | 17 May 2024 | View |
| 41a 25021_PL-BB-102_REV_B · PDF | 11 Sept 2023 | View |
| 57 25021_PL-BB-118_REV_A · PDF | 11 Sept 2023 | View |
| 38 25021_PL-BB-099_REV_B · PDF | 11 Sept 2023 | View |
| 53 25021_PL-BB-114_REV_B · PDF | 11 Sept 2023 | View |
| 111a 25021_PL-BE2-201_REV_ · PDF | 11 Sept 2023 | View |
| 10 25021_PL-506 - Building 3 Existing Elevations · PDF | 11 Sept 2023 | View |
| 174 40 PL-BB-101 Proposed Plan Block B rev C · PDF | 11 Sept 2023 | View |
| 83 25021_PL-BE-BD-112_REV_ · PDF | 11 Sept 2023 | View |
| 43 25021_PL-BB-104_REV_B · PDF | 11 Sept 2023 | View |
| 4 PL-500 -Existing Site Plan Diagram · PDF | 11 Sept 2023 | View |
| 93a 25021_PL-BE1-200_REV_ · PDF | 11 Sept 2023 | View |
| 154 DAS_addendum_002.2_Part1 · PDF | 16 Oct 2023 | View |
| 85a 25021_PL-BE1-100_REV_ · PDF | 11 Sept 2023 | View |
| 137a Structural Report_WHOLE_Part4 · PDF | 16 Oct 2023 | View |
| Comments from Crossrail 2 Safeguarding · PDF | 20 Oct 2023 | View |
| 63 25021_PL-BD-201_REV_B · PDF | 11 Sept 2023 | View |
| 54 PL-BB-115_REV_C · PDF | 11 Sept 2023 | View |
| 42a 25021_PL-BB-103_REV_B · PDF | 11 Sept 2023 | View |
| 3 25021_PL-011_REV_B · PDF | 11 Sept 2023 | View |
| 14 171013 Existing GIA Floorspace Schedule and Drawings merged · PDF | 11 Sept 2023 | View |
| 12 25021_PL-508 -Building 5 Existing Plan · PDF | 11 Sept 2023 | View |
| 154 DAS_addendum_002.2 · PDF | 16 Oct 2023 | View |
| 33 PL5294-05 Choc Factory Fourth and Fifth Floor Existing Layout · PDF | 11 Sept 2023 | View |
| 29 PL5294-01 Choc Factory Ground Floor Existing Layout · PDF | 11 Sept 2023 | View |
| 60a 25021_PL-BB-202_REV_E · PDF | 11 Sept 2023 | View |
| 116a 25021_PL-BD-203_REV_C · PDF | 11 Sept 2023 | View |
| CF S73 draft cover Letter | 11 Sept 2023 | View |
| 95a 25021_PL-BE1-202_REV_ · PDF | 11 Sept 2023 | View |
| 34a 25021_PL-BA-200_REV_C · PDF | 11 Sept 2023 | View |
| 90a 25021_PL-BE1-105_REV_ · PDF | 11 Sept 2023 | View |
| 160 WG042 Chocolate Factory Methodology 200218 · PDF | 11 Sept 2023 | View |
| 124a 25021_PL-BA-BF-102_REV D · PDF | 11 Sept 2023 | View |
| 144a 20150098-DK-161214-Sustainability Statement-Rev G (A3)-with appendices · PDF | 11 Sept 2023 | View |
| 105a 25021_PL-BE2-BD-109_REV_ · PDF | 11 Sept 2023 | View |
| 92a 25021_PL-BE1-107_REV_ · PDF | 11 Sept 2023 | View |
| 180 PL-BE-201_REV_C · PDF | 16 Oct 2023 | View |
| 170a 210301 FINAL S96A Planning Statement · PDF | 11 Sept 2023 | View |
| 143a 20150098-DK-161214-Energy Statement-Rev G (A3)-part 2 · PDF | 11 Sept 2023 | View |
| 127a 25021_PL-BA-BF-105_REV D · PDF | 11 Sept 2023 | View |
| 121a 20716 - 33-6D Phased Masterplan · PDF | 11 Sept 2023 | View |
| 167a 25021_DAS_addendum_003 01.03.2021_Part1 · PDF | 11 Sept 2023 | View |
| 178 76 PL-BE-BD-105 Proposed Plans Blocks E - D rev C · PDF | 11 Sept 2023 | View |
| DM Decision.pdf · PDF | 17 May 2024 | View |
| 143a 20150098-DK-161214-Energy Statement-Rev G (A3)-part 3 · PDF | 11 Sept 2023 | View |
| 156 Commercial Strategy Submission · PDF | 11 Sept 2023 | View |
| Accommodation and Areas Schedule Block E2 Residential Affordable Housing Rev B 14.08.23 | 11 Sept 2023 | View |
| CFE2-DAR-XX-XX-DR-A-0012 P1 Second Floor July 23 · PDF | 11 Sept 2023 | View |
| 108a 25021_PL-BE2-BD-112_REV_ · PDF | 11 Sept 2023 | View |
| 106a 25021_PL-BE2-BD-110_REV_ · PDF | 11 Sept 2023 | View |
| CFE2-DAR-XX-XX-DR-A-0011 P1 First Floor July 23 · PDF | 11 Sept 2023 | View |
| 148 1602082 Chocolate Factory SoC 16.02.2018 · PDF | 11 Sept 2023 | View |
| 94a 25021_PL-BE1-201_REV_ · PDF | 11 Sept 2023 | View |
| 120 20716-RG-L33B-4 · PDF | 11 Sept 2023 | View |
| 88a 25021_PL-BE1-103_REV_ · PDF | 11 Sept 2023 | View |
| 152 a Block D Residential Acc. Schedule_rev J_ 27.02.18 · PDF | 11 Sept 2023 | View |
| 139 Pt2 180209 FRA4 The Chocolate Factory · PDF | 11 Sept 2023 | View |
| 140a 25021 - Block B Residential Acc. Schedule_rev J 12.02.18 · PDF | 11 Sept 2023 | View |
| 113a 25021_PL-BD-200_REV_C · PDF | 11 Sept 2023 | View |
| 122a 25021_PL-BA-BF-100_REV D · PDF | 11 Sept 2023 | View |
| ApplicationFormRedacted · PDF | 11 Sept 2023 | View |
| CFE2-DAR-XX-XX-DR-A-0010 P1 Ground Floor July 23 · PDF | 11 Sept 2023 | View |
| CF-Affordable Social Rent homes · PDF | 11 Sept 2023 | View |
| 154 DAS_addendum_002.2_Part3 · PDF | 16 Oct 2023 | View |
| CFE2-DAR-XX-XX-DR-A-0014 P1 Fourth Floor July 23 · PDF | 11 Sept 2023 | View |
| CFE2-DAR-XX-XX-DR-A-0013 P1 Third Floor July 23 · PDF | 11 Sept 2023 | View |
Documents open on the council website. Browse council documents if a link has changed.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
No related records were published in this section.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.