Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Tottenham Hotspur Stadium, 748 High Road, Tottenham, London N17 0AL
Last published check: 3 Oct 2026, 06:13. Check the council record for more recent changes.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
Minor Material Amendments to height, design, maximum floorspace and associated works to Plot 3 (Hotel / Residential development) of the hybrid planning permission HGY/2015/3000 (following previously approved amendments including HGY/2017/1183 to allow part residential (C3) use on Plot 3) for demolition and comprehensive redevelopment of the Northumberland Park Development Project through variation of Conditions A4 (Consented Drawings and Documents); A6 (Conformity with Environmental Statement) and Condition A7 (Maximum Quantity/Density) and D1 (Plot 3 specific drawings) under Section 73 of the Town and Country Planning Act (EIA development)
Sign in to view all collected council fields and recorded changes.
Sign in to view collected detailsTottenham Hotspur Stadium, 748 High Road, Tottenham, London N17 0AL
This record has no verified map location.
| Document | Published | Action |
|---|---|---|
| London Fire Brigade consultation response documents · PDF | 28 Oct 2024 | View |
| NDP Hotel Design and Access Statement_Section 02_Part1 · PDF | 7 Aug 2023 | View |
| Statement of Community Involvement Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| Residential Drawings 100707203 Section D P2 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| Planning Committee Report · PDF | 1 Dec 2023 | View |
| ES Addendum_Main Text_Part 32 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-SC-0187 Stadium North West Stand Section Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| Residential Drawings 100707201 Section B P4 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| Residential Drawings 100707PP000 Hybrid Application Boundary Site Plan P4 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| Concerns from local residents and petition header (signatures on file) · PDF | 22 Sept 2023 | View |
| ES Addendum_Main Text_Part 28 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-SC-0540 Community Health Building Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| NDP Hotel Design and Access Statement_Section 02_Part3 · PDF | 7 Aug 2023 | View |
| Residential Drawings 100707PP007 Outline Planning Boundary South Elevation P4 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-SC-8006 Landscape Site Sections (Sheet 1 of 2) Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| GLA 2023.0586 Tottenham Hotspur Stadium Hotel Stage 1 Report · PDF | 10 Oct 2023 | View |
| Residential Drawings 100707105 Level R2 P4 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| Residential Drawings 100707102 Level P2 P4 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| Residential Drawings 100707098 2nd Basement Level B2 P4 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| Residential Drawings 100707PP004 Outline Planning Boundary Level P1 P5 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| Residential Drawings 100707099 1st Basement Level B1 P4 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| THHTL-F3A-XX-28-GA-A-082040-P02 LEVEL 28 RESIDENTIAL GENERAL ARRANGEMENT PLAN · PDF | 6 Nov 2023 | View |
| POP-4494-PLN-SC-0199 Stadium North and South Entrance Sections Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| THHTL-F3A-XX-15+-DE-A-082101-P02 ACCESSIBLE RESIDENTIAL UNITS - ENLARGED PLAN · PDF | 6 Nov 2023 | View |
| POP-4494-PLN-SC-0188 Stadium North East Section Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| No objection from L.B. Islington - formal letter · PDF | 20 Oct 2023 | View |
| Residential Drawings 100707303 West Elevation P4 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| Residential Drawings 100707202 Section C P4 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| TA MED TA Appendix J Part 2 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| THHTL-F3A-XX-EX-ST-A-089020-P02 APPLICATION SITE BOUNDARY · PDF | 6 Nov 2023 | View |
| 14 NDP Hotel S73 Application_Drawings_Part11_Rev · PDF | 7 Aug 2023 | View |
| Residential Design Codes Part 1 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| Residential Drawings 100707PP009 Proposed Maximum Heights Plan P5 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| Residential Drawings 100707PP008 Outline Planning Boundary East Elevation P4 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| Residential Drawings 100707PP017 Use Level P1 P4 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| DAS 08 - TOTTENHAM EXPERIENCE_Part1 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| Comments from Natural England with consultation response to HGY_2015_3000 included for reference · PDF | 11 Sept 2023 | View |
| DAS 11 - RESIDENTIAL_Part1 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| Residential Drawings 100707100 Ground Floor Level P4 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| NDP Hotel Design and Access Statement_Section 02_Part7 · PDF | 7 Aug 2023 | View |
| Residential Drawings 100707104 Level R1 P4 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| Residential Drawings 100707PP001 Outline Planning Boundary Level B2 P5 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| THHTL-F3A-XX-ZZ-EL-A-082505-P02 ILLUSTRATIVE WESTERN HIGH ROAD ELEVATION · PDF | 6 Nov 2023 | View |
| THHTL-F3A-XX-RF-GA-A-082022-P02 SOUTHERN DEVELOPMENT ROOF PLAN · PDF | 6 Nov 2023 | View |
| NDP Hotel Design and Access Statement_Section 04_Part1 · PDF | 7 Aug 2023 | View |
| Decision Notice Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| Residential Drawings 100707107 Level R4 Typical Floors P4 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| Residential Drawings 100707PP011 Access Level P2 P5 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| DAS 08 - TOTTENHAM EXPERIENCE_Part2 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| THHTL-F3A-XX-XX-DR-A-082112-P02 BAY STUDY - MIDDLE OF BUILDING · PDF | 6 Nov 2023 | View |
| DAS 11 - RESIDENTIAL_Part14 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| THHTL-F3A-XX-B1-GA-A-082000-P01 EXISTING BASEMENT GENERAL ARRANGEMENT PLAN · PDF | 6 Nov 2023 | View |
| DAS 11 - RESIDENTIAL_Part13 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| Residential Drawings 100707204 Section E P1 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| 04 Design and Access Statement_Part7 · PDF | 22 Aug 2023 | View |
| Residential Drawings 100707120 Level R17 R19 P4 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| THHTL-F3A-XX-B1-GA-A-082030-P02 BASEMENT GENERAL ARRANGEMENT PLAN · PDF | 6 Nov 2023 | View |
| Y_HERef_P01564854_439414_HGY20232137 · PDF | 20 Nov 2023 | View |
| NDP Hotel Design and Access Statement_Section 08_Part1 · PDF | 7 Aug 2023 | View |
| TA MED TA Appendix I Part 2 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| NDP Hotel Design and Access Statement_Section 02_Part10 · PDF | 7 Aug 2023 | View |
| TA MED TA Appendix A Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN- EL-0333 Hotel Southern Elevation Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP 4494 PLN PP 0402 Extreme Sports Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| NDP Hotel Design and Access Statement_Section 02_Part8 · PDF | 7 Aug 2023 | View |
| Residential Drawings 100707103 Level P3 P4 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| Residential Drawings 100707PP010 Access Ground Floor Plan P5 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| TA MED TA Appendix E Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| Appendix 4 - Internal and External Comments · PDF | 1 Dec 2023 | View |
| THHTL-F3A-XX-XX-DR-A-082123-P02 WALL TYPE 04 - RECESSED INFILL BALCONIES · PDF | 6 Nov 2023 | View |
| Residential Drawings 100707PP016 Use Ground Floor Plan P4 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| 16 Transport Assessment Addendum Update · PDF | 1 Nov 2023 | View |
| 03 Cover Letter - Summary of Amendments · PDF | 1 Nov 2023 | View |
| Residential Drawings 100707123 Level R20 R24 P4 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| THHTL-F3A-XX-RFP-GA-A-082043-P02 ROOF PLANT GENERAL ARRANGEMENT PLAN · PDF | 6 Nov 2023 | View |
| GLA2023.0661 - Spurs Stadium Hotel - Stage 2 Report · PDF | 25 Mar 2024 | View |
| DAS 07 - STADIUM DESIGN_Part1 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| DAS 04 - DESIGN RESPONSE_Part2 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| 04 Design and Access Statement_Part10 · PDF | 22 Aug 2023 | View |
| 14 NDP Hotel S73 Application_Drawings_Part4 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN- GA-0127 Masterplan Level 07 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN- GA-0122 Masterplan Level 02 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP4494PLNEL0431 Extreme Sports Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| Application Form Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-EL-0170 Stadium East and West Elevations Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| 14 NDP Hotel S73 Application_Drawings_Part8 · PDF | 7 Aug 2023 | View |
| 14 NDP Hotel S73 Application_Drawings_Part7 · PDF | 7 Aug 2023 | View |
| ApplicationFormRedacted · PDF | 7 Aug 2023 | View |
| THHTL-F3A-XX-29-GA-A-082041-P02 LEVEL 29 RESIDENTIAL GENERAL ARRANGEMENT PLAN · PDF | 6 Nov 2023 | View |
| Y_HERef_P01564854_434807_HGY20232137 · PDF | 20 Nov 2023 | View |
| 04 Design and Access Statement_Part16 · PDF | 22 Aug 2023 | View |
| THHTL-F3A-XX-ZZ-EL-A-082502-P02 NORTHERN AND SOUTHERN ELEVATION · PDF | 6 Nov 2023 | View |
| DAS 11 - RESIDENTIAL_Part5 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| DAS 09 - HOTEL_Part2 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| NDP Hotel N17 TVIA Addendum Final HR_Part13 · PDF | 22 Aug 2023 | View |
| DAS 11 - RESIDENTIAL_Part6 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| Comments from the Greater London Archaeological Advisory Service · PDF | 30 Aug 2023 | View |
| THHTL-F3A-XX-00-GA-A-082031-P02 LEVEL 00 GENERAL ARRANGEMENT PLAN · PDF | 6 Nov 2023 | View |
| NDP Hotel Design and Access Statement_Section 08_Part3 · PDF | 7 Aug 2023 | View |
| NDP Hotel Design and Access Statement_Section 07 · PDF | 7 Aug 2023 | View |
| THHTL-F3A-XX-RF-GA-A-082045-P02 ROOF GENERAL ARRANGEMENT PLAN · PDF | 6 Nov 2023 | View |
| 02 CIL Additional Information Form · PDF | 7 Aug 2023 | View |
| THHTL-F3A-XX-ZZ-SE-A-082631-P02 CROSS SECTION SOUTH AND NORTH · PDF | 6 Nov 2023 | View |
| Consultation response from L.B. Waltham Forest · PDF | 23 Jan 2024 | View |
| Cover Letter Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| DAS 04 - DESIGN RESPONSE_Part1 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| TA MED TA Appendix J Part 1 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| Sustainability Report Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| Residential Drawings 100707101 Level P1 P4 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| TA MED TA Appendix I Part 3 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| THHTL-F3A-XX-12-GA-A-082034-P02 LEVEL 12 AMENITY GENERAL ARRANGEMENT PLAN · PDF | 6 Nov 2023 | View |
| TA MED TA Appendix B C G and H Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| THHTL-F3A-XX-ZZ-EL-A-082510-P01 EXISTING ELEVATIONS · PDF | 6 Nov 2023 | View |
| THHTL-F3A-XX-RF-ST-A-089050-P02 COMPARISON TO CONSENTED SCHEME - PLANS · PDF | 6 Nov 2023 | View |
| NDP Hotel N17 TVIA Addendum Final HR_Part23 · PDF | 22 Aug 2023 | View |
| NDP Hotel - Design and Access Statement_Section 05_Part1 · PDF | 7 Aug 2023 | View |
| NDP Hotel - Design and Access Statement_Section 05_Part14 · PDF | 7 Aug 2023 | View |
| DAS 11 - RESIDENTIAL_Part8 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| NDP Hotel - Design and Access Statement_Section 05_Part6 · PDF | 7 Aug 2023 | View |
| NDP Hotel Design and Access Statement_Section 02_Part2 · PDF | 7 Aug 2023 | View |
| NDP Hotel Design and Access Statement_Section 08_Part6 · PDF | 7 Aug 2023 | View |
| NDP Hotel - Design and Access Statement_Section 05_Part16 · PDF | 7 Aug 2023 | View |
| NDP Hotel - Design and Access Statement_Section 05_Part17 · PDF | 7 Aug 2023 | View |
| NDP Hotel N17 TVIA Addendum Final HR_Part27 · PDF | 22 Aug 2023 | View |
| POP-4494-PLN- EL-0330 Hotel Western Elevation Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| DAS 07 - STADIUM DESIGN_Part9 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| NDP Hotel - Design and Access Statement_Section 05_Part4 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-DE-0232 Tottenham Experience Detail Sections Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| NDP Hotel N17 TVIA Addendum Final HR_Part34 · PDF | 22 Aug 2023 | View |
| POP-4494-PLN- GA-0301 Hotel Level 00 General Arrangement Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| NDP Hotel N17 TVIA Addendum Final HR_Part24 · PDF | 22 Aug 2023 | View |
| POP4494 PLN PP 0417 Extreme Sports Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN- EP-0340 Hotel Accessible RoomsApt Variations Enlarged Plan Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| ES Addendum_Appendix 11.1_Part5 · PDF | 7 Aug 2023 | View |
| ES Addendum_Main Text_Part 20 · PDF | 7 Aug 2023 | View |
| ES Addendum_Appendix 17.4 · PDF | 7 Aug 2023 | View |
| NDP Hotel N17 TVIA Addendum Final HR_Part15 · PDF | 22 Aug 2023 | View |
| NDP Hotel N17 TVIA Addendum Final HR_Part1 · PDF | 22 Aug 2023 | View |
| NDP Hotel N17 TVIA Addendum Final HR_Part11 · PDF | 22 Aug 2023 | View |
| 04 Design and Access Statement_Part2 · PDF | 22 Aug 2023 | View |
| NDP Hotel N17 TVIA Addendum Final HR_Part17 · PDF | 22 Aug 2023 | View |
| THHTL-F3A-XX-01-GA-A-082002 EXISTING LEVEL 01 GENERAL ARRANGEMENT PLAN · PDF | 6 Nov 2023 | View |
| Appendix 12 - Drawings and Documents List · PDF | 1 Dec 2023 | View |
| Appendix 3 - Images and Drawings · PDF | 1 Dec 2023 | View |
| NDP Hotel N17 TVIA Addendum Final HR_Part35 · PDF | 22 Aug 2023 | View |
| NDP Hotel N17 TVIA Addendum Final HR_Part28 · PDF | 22 Aug 2023 | View |
| NDP Hotel N17 TVIA Addendum Final HR_Part29 · PDF | 22 Aug 2023 | View |
| ES Addendum_Main Text_Part 13 · PDF | 7 Aug 2023 | View |
| 231005 GLA Drainage, Flood Risk & Water Comments | 26 Oct 2023 | View |
| THHTL-F3A-XX-27-GA-A-082039-P02 LEVEL 27 RESIDENTIAL GENERAL ARRANGEMENT PLAN · PDF | 6 Nov 2023 | View |
| THHTL-F3A-XX-14-GA-A-082036-P02 LEVEL 14 RESIDENTIAL AMENITY GENERAL ARRANGEMENT PLAN · PDF | 6 Nov 2023 | View |
| ES Addendum_Main Text_Part 11 · PDF | 7 Aug 2023 | View |
| 15 Sustainability Statement Update · PDF | 26 Oct 2023 | View |
| ES Addendum_Main Text_Part 6 · PDF | 7 Aug 2023 | View |
| 14 NDP Hotel S73 Application_Drawings_Part10 · PDF | 7 Aug 2023 | View |
| 16 Transport Assessment Addendum · PDF | 7 Aug 2023 | View |
| 09 Fire Statement · PDF | 7 Aug 2023 | View |
| NDP Hotel N17 TVIA Addendum Final HR_Part32 · PDF | 22 Aug 2023 | View |
| 09 Gateway 1 Fire Form · PDF | 7 Aug 2023 | View |
| THHTL-F3A-XX-XX-DR-A-082125-P02 WALL TYPE 06 - PRE-CAST PANELS · PDF | 6 Nov 2023 | View |
| THHTL-F3A-XX-RFP-GA-A-082044-P02 ROOF PLANT MEZZANINE GENERAL ARRANGEMENT PLAN · PDF | 6 Nov 2023 | View |
| NDP Hotel N17 TVIA Addendum Final HR_Part33 · PDF | 22 Aug 2023 | View |
| NDP Hotel N17 TVIA Addendum Final HR_Part30 · PDF | 22 Aug 2023 | View |
| ES Addendum_Main Text_Part 29 · PDF | 7 Aug 2023 | View |
| ES Addendum_Main Text_Part 3 · PDF | 7 Aug 2023 | View |
| NDP Hotel N17 TVIA Addendum Final HR_Part31 · PDF | 22 Aug 2023 | View |
| ES Addendum_Appendix 1.1_Part1 · PDF | 7 Aug 2023 | View |
| ES Addendum_Appendix 1.1_Part19 · PDF | 7 Aug 2023 | View |
| ES Addendum_Main Text_Part 7 · PDF | 7 Aug 2023 | View |
| ES Addendum_Appendix 1.1_Part20 · PDF | 7 Aug 2023 | View |
| ES Addendum_Appendix 1.1_Part3 · PDF | 7 Aug 2023 | View |
| THHTL-F3A-XX-ZZ-SE-A-082660-P02 COMPARISON TO CONSENTED - SECTIONS · PDF | 6 Nov 2023 | View |
| NDP Hotel N17 TVIA Addendum Final HR_Part9 · PDF | 22 Aug 2023 | View |
| ES Addendum_Appendix 1.1_Part12 · PDF | 7 Aug 2023 | View |
| ES Addendum_ Appendix 7.1 · PDF | 7 Aug 2023 | View |
| THHTL-F3A-XX-ZZ-SE-A-082630-P02 LONGITDUINAL SECTION · PDF | 6 Nov 2023 | View |
| THHTL-F3A-XX-15+-GA-A-082037-P02 LEVELS 15-20 TYPICAL RESIDENTIAL GENERAL ARRANGEMENT PLAN · PDF | 6 Nov 2023 | View |
| THHTL-F3A-XX-21+-GA-A-082038-P02 LEVELS 21-26 TYPICAL RESIDENTIAL GENERAL ARRANGEMENT PLAN · PDF | 6 Nov 2023 | View |
| ES Addendum_Main Text_Part 30 · PDF | 7 Aug 2023 | View |
| Appendix 11 - Site History · PDF | 1 Dec 2023 | View |
| ES Addendum_Main Text_Part 16 · PDF | 7 Aug 2023 | View |
| ES Addendum_Main Text_Part 33 · PDF | 7 Aug 2023 | View |
| Appendix 8 - QRP Review 19 April 2023 · PDF | 1 Dec 2023 | View |
| 04 Design and Access Statement_Part3 · PDF | 22 Aug 2023 | View |
| NDP Hotel N17 TVIA Addendum Final HR_Part39 · PDF | 22 Aug 2023 | View |
| ES Addendum_Main Text_Part 12 · PDF | 7 Aug 2023 | View |
| 07 Environmental Statement Addendum Supplementary Note · PDF | 1 Nov 2023 | View |
| ES Addendum_Main Text_Part 22 · PDF | 7 Aug 2023 | View |
| ES Addendum_Main Text_Part 24 · PDF | 7 Aug 2023 | View |
| Appendix 10 - QRP Review 18 October 2023 (Chair Review) · PDF | 1 Dec 2023 | View |
| 04 Design and Access Statement_Part6 · PDF | 22 Aug 2023 | View |
| THHTL-F3A-XX-00-GA-A-082001 EXISTING LEVEL 00 GENERAL PLAN · PDF | 6 Nov 2023 | View |
| THHTL-F3A-XX-B1-GA-A-082020-P02 SOUTHERN DEVELOPMENT BASEMENT PLAN · PDF | 6 Nov 2023 | View |
| THHTL-F3A-XX-XX-DR-A-082113-P02 BAY STUDY - TOP OF BUILDING · PDF | 6 Nov 2023 | View |
| THHTL-F3A-XX-01-GA-A-082032-P02 LEVEL 01 GENERAL ARRANGEMENT PLAN · PDF | 6 Nov 2023 | View |
| DM Decision · PDF | 8 Apr 2024 | View |
| 04 Design and Access Statement_Part4 · PDF | 22 Aug 2023 | View |
| Appendix 7 - Wind Microclimate Review · PDF | 1 Dec 2023 | View |
| ES Addendum_Main Text_Part 23 · PDF | 7 Aug 2023 | View |
| ES Addendum_Main Text_Part 17 · PDF | 7 Aug 2023 | View |
| NDP Hotel N17 TVIA Addendum Final HR_Part12 · PDF | 22 Aug 2023 | View |
| ES Addendum_Main Text_Part 25 · PDF | 7 Aug 2023 | View |
| 04 Design and Access Statement_Part8 · PDF | 22 Aug 2023 | View |
| ES Addendum_Main Text_Part 21 · PDF | 7 Aug 2023 | View |
| 04 Design and Access Statement_Part5 · PDF | 22 Aug 2023 | View |
| 04 Design and Access Statement_Part1 · PDF | 22 Aug 2023 | View |
| ES Addendum_Main Text_Part 26 · PDF | 7 Aug 2023 | View |
| ES Addendum_Main Text_Part 9 · PDF | 7 Aug 2023 | View |
| ES Addendum_Appendix 15.1 · PDF | 7 Aug 2023 | View |
| ES Addendum_Main Text_Part 10 · PDF | 7 Aug 2023 | View |
| TA MED TA Appendix K Part 2 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| Residential Drawings 100707131 Level R28 R31 P4 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-SC-0182 Stadium West Stand Section Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| TA MED TA Appendix K Part 1 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| TA MED TA Appendix I Part 4 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| ES Addendum_Main Text_Part 31 · PDF | 7 Aug 2023 | View |
| ES Addendum_Main Text_Part 27 · PDF | 7 Aug 2023 | View |
| NDP Hotel - Design and Access Statement_Section 05_Part3 · PDF | 7 Aug 2023 | View |
| DAS 13 - PUBLIC REALM_Part7 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| Comments from Natural England · PDF | 4 Dec 2023 | View |
| DAS 07 - STADIUM DESIGN_Part2 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-GA-0208 Tottenham Experience Roof Level General Arrangement Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| DAS 02 - CONTEXT Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| THHTL-F3A-XX-ZZ-EL-A-082501-P02 WESTERN AND EASTERN ELEVATION · PDF | 6 Nov 2023 | View |
| 14 NDP Hotel S73 Application_Drawings_Part3 · PDF | 7 Aug 2023 | View |
| 14 NDP Hotel S73 Application_Drawings_Part6 · PDF | 7 Aug 2023 | View |
| Comments from Historic England · PDF | 7 Sept 2023 | View |
| DAS 11 - RESIDENTIAL_Part2 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP4494PLNIP0422 Extreme Sports Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| DAS 07 - STADIUM DESIGN_Part5 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-GA-0521 Community Health Building Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| 11 Internal DSO Report · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-SC-0186 Stadium South East Stand Section Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| 14 NDP Hotel S73 Application_Drawings_Part1 · PDF | 7 Aug 2023 | View |
| DAS 11 - RESIDENTIAL_Part4 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-SC-0185 Stadium South Stand Section Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-EL-0543 Community Health Building Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| THHTL-F3A-XX-13-GA-A-082035-P02 LEVEL 13 AMENITY GENERAL ARRANGEMENT PLAN · PDF | 6 Nov 2023 | View |
| ES Addendum_Main Text_Part 19 · PDF | 7 Aug 2023 | View |
| ES Addendum_Main Text_Part 18 · PDF | 7 Aug 2023 | View |
| POP4494 PLN PP 0408 Extreme Sports Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| DAS 07 - STADIUM DESIGN_Part11 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| NDP Hotel - Design and Access Statement_Section 05_Part12 · PDF | 7 Aug 2023 | View |
| POP4494PLNEL0432 Extreme Sports Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-EL-0190 Stadium North Entrance Elevation Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| DAS 06 - MASTERPLAN_Part1 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| DAS 13 - PUBLIC REALM_Part10 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN- GA-0128 Masterplan Level 08 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| DAS 03 - SITE HERITAGE Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| DAS 13 - PUBLIC REALM_Part6 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP4494 PLN PP 0412 Extreme Sports Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| ES Addendum Non-Technical Summary.F · PDF | 7 Aug 2023 | View |
| DAS 06 - MASTERPLAN_Part2 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| Decision Notice 3 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN- GA-0304 Hotel Typical Floor Plan (Levels 03-14) General Arrangement Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| Tottenham Hotspur Stadium (Stage 1) GLA Energy Memo | 29 Sept 2023 | View |
| DAS 13 - PUBLIC REALM_Part9 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN- GA-0140 Comparison to Consented Scheme Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| TA MED TA Appendix J Part 4 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| ES Addendum_Appendix 1.1_Part18 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN- GA-0132 Masterplan Basement Level B2 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| TA MED TA Appendix J Part 3 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| NDP Hotel Design and Access Statement_Section 02_3 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN- GA-0308 Hotel Roof General Arrangement Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP4494PLNEL0433 Extreme Sports Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| ES Addendum_Main Text_Part 15 · PDF | 7 Aug 2023 | View |
| NDP Hotel - Design and Access Statement_Section 05_Part18 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN- GA-0306 Hotel Level 22 General Arrangement Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-EL-0230 Tottenham Experience East Elevation and Section BB Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| Transport Assessment (Major Event Day) Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| ES Addendum_Appendix 17.3 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-EL-0220 Tottenham Experience West Elevation and Section AA Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-EL-0195 Stadium North West Entrance Elevation Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| THHTL-F3A-XX-XX-DR-A-082110-P02 BAY STUDY - BASE OF BUILDING 01 · PDF | 6 Nov 2023 | View |
| Comments from Natural England - Annex A to standard letters - Oct 23 PDF · PDF | 4 Dec 2023 | View |
| POP-4494-PLN-EL-0531 Community Health Building Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-EL-0192 Stadium East Entrance Elevation Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN- GA-0125 Masterplan Level 05 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-GA-0150 Stadium Level 00 General Arrangement Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP4494 PLN PP 0411 Extreme Sports Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP 4494 PLN PP 0405 Extreme Sports Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| 20 Supplementary Internal Daylight, Sunlight and Overshadowing Note · PDF | 1 Nov 2023 | View |
| 04 Design and Access Statement Addendum · PDF | 1 Nov 2023 | View |
| POP-4494-PLN-GA-0160 Stadium Basement Level B1 General Arrangement Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-GA-0157 Stadium Level 07 General Arrangement Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| Residential Drawings 100707PP003 Outline Planning Boundary Level 00 P5 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-SC-0189 Stadium South West Section Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| Energy Strategy Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| Transport Assessment (Non Major Event Day) Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| NDP Hotel - Design and Access Statement_Section 05_Part13 · PDF | 7 Aug 2023 | View |
| TA MED TA Appendix J Part 5 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| NDP Hotel - Design and Access Statement_Section 05_Part5 · PDF | 7 Aug 2023 | View |
| POP4494PLNIP0421 Extreme Sports Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| DAS 13 - PUBLIC REALM_Part8 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-GA-8102 Landscape Temporary Surfacing Detailed Plan (Sheet 2 of 2) Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| THHTL-F3A-XX-XX-DR-A-082111-P02 BAY STUDY - BASE OF BUILDING 02 · PDF | 6 Nov 2023 | View |
| NDP Hotel Design and Access Statement_Section 06 · PDF | 7 Aug 2023 | View |
| ES Addendum_Appendix 1.1_Part29 · PDF | 7 Aug 2023 | View |
| THHTL-F3A-XX-30-GA-A-082042-P02 LEVEL 30 RESIDENTIAL GENERAL ARRANGEMENT PLAN · PDF | 6 Nov 2023 | View |
| POP4494PLNIP0423 Extreme Sports Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| ES Addendum_Appendix 1.1_Part24 · PDF | 7 Aug 2023 | View |
| NDP Hotel Design and Access Statement_Section 02_Part9 · PDF | 7 Aug 2023 | View |
| POP4494PLNSC0441 Extreme Sports Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| NDP Hotel Design and Access Statement_Section 02_Part4 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-GA-0152 Stadium Level 02 General Arrangement Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| Tree Survey Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-GA-8005 Landscape Public Realm Diagram Fire Access Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-SC-0541 Community Health Building Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-GA-0501 Community Health Building Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| ES Addendum_Appendix 11.1_Part4 · PDF | 7 Aug 2023 | View |
| London Fire Brigade consultation response documents · PDF | 28 Oct 2024 | View |
| POP-4494-PLN-EL-0231 Tottenham Experience South and North Elevations Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| ES Addendum_Appendix 1.1_Part23 · PDF | 7 Aug 2023 | View |
| ES Addendum_Appendix 1.1_Part22 · PDF | 7 Aug 2023 | View |
| ES Addendum_Main Text_Part 4 · PDF | 7 Aug 2023 | View |
| ES Addendum_Appendix 1.1_Part28 · PDF | 7 Aug 2023 | View |
| POP 4494 PLN PP 0416 Extreme Sports Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| ES Addendum_Appendix 1.1_Part26 · PDF | 7 Aug 2023 | View |
| Residential Drawings 100707PP005 Outline Planning Boundary Level P2 P5 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-SC-0181 Stadium Section C-C and D-D Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP4494PLNSC0440 Extreme Sports Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-GA-8101 Landscape Temporary Surfacing Detailed Plan (Sheet 1 of 2) Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-SC-0184 Stadium North Stand Section Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP4494PLNIP0426 Extreme Sports Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-SC-8007 Landscape Site Sections (Sheet 2 of 2) Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP4494PLNIP0425 Extreme Sports Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| FeeCalculation · PDF | 7 Aug 2023 | View |
| THFC s106 - 070316 - Part III Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-GA-0510 Community Health Building Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-GA-0502 Community Health Building Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| 18 Whole Life Carbon · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-GA-8002 Landscape Detailed Area (Sheet 2 of 4) Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-GA-0511 Community Health Building Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP4494PLNEL0430 Extreme Sports Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| 06 Energy Strategy Addendum Update · PDF | 7 Nov 2023 | View |
| TA MED TA Appendix K Part 4 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-SC-0180 Stadium Section A-A and B-B Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-GA-8004 Landscape Detailed Area (Sheet 4 of 4) Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| DAS 07 - STADIUM DESIGN_Part3 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| NDP Hotel - Design and Access Statement_Section 05_Part9 · PDF | 7 Aug 2023 | View |
| Residential Drawings 100707PP015 Use Level B1 P4 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| Heritage Statement Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| Residential Drawings 100707PP014 Use Level B2 P4 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| 12 Lighting Statement · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-EL-0532 Community Health Building Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| 15 Sustainability Statement · PDF | 7 Aug 2023 | View |
| Residential Drawings 100707PP018 Use Level P2 P4 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| ES Addendum_Appendix 1.1_Part31 · PDF | 7 Aug 2023 | View |
| THHTL-F3A-XX-XX-DR-A-082124-P02 WALL TYPE 05 - FOLDING BLADE · PDF | 6 Nov 2023 | View |
| Residential Drawings 100707PP012 Access Level P3 P5 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| THFC Hotel Part_l_2021_gla_carbon_emission_reporting_spreadsheet_v2.0_0 | 7 Aug 2023 | View |
| NDP Hotel N17 TVIA Addendum Final HR_Part25 · PDF | 22 Aug 2023 | View |
| TA MED TA Appendix K Part 5 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| THFC s106 - 070316 - Part II Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| TA MED TA Appendix K Part 3 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| NDP Hotel N17 TVIA Addendum Final HR_Part38 · PDF | 22 Aug 2023 | View |
| DAS 07 - STADIUM DESIGN_Part6 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| NDP Hotel Design and Access Statement_Section 03 · PDF | 7 Aug 2023 | View |
| Residential Drawings 100707PP019 Use Roof Plan P4 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| ES Addendum_Main Text_Part 1 · PDF | 7 Aug 2023 | View |
| NDP Hotel Design and Access Statement_Section 02_Part5 · PDF | 7 Aug 2023 | View |
| Residential Drawings 100707PP013 Access Roof Plan P5 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| ES Addendum_Appendix 16.1 · PDF | 7 Aug 2023 | View |
| 06 Energy Strategy Addendum · PDF | 7 Aug 2023 | View |
| ES Addendum_Main Text_Part 14 · PDF | 7 Aug 2023 | View |
| NDP Hotel N17 TVIA Addendum Final HR_Part37 · PDF | 22 Aug 2023 | View |
| 13 Planning Statement · PDF | 7 Aug 2023 | View |
| NDP Hotel Design and Access Statement_Section 10 · PDF | 7 Aug 2023 | View |
| ES Addendum_Main Text_Part 5 · PDF | 7 Aug 2023 | View |
| NDP Hotel N17 TVIA Addendum Final HR_Part36 · PDF | 22 Aug 2023 | View |
| POP-4494-PLN-GA-0151 Stadium Level 01 General Arrangement Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| NDP Hotel Design and Access Statement_Section 00 · PDF | 7 Aug 2023 | View |
| Residential Drawings 100707PP002 Outline Planning Boundary Level B1 P5 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| ES Addendum_Appendix 11.1_Part1 · PDF | 7 Aug 2023 | View |
| NDP Hotel - Design and Access Statement_Section 05_Part15 · PDF | 7 Aug 2023 | View |
| POP4494PLNIP0420 Extreme Sports Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN- GA-0302 Hotel Level 01 General Arrangement Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| Residential Design Codes Part 2 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN- GA-0135 Masterplan Roof Level Plan Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-SC-0198 Stadium West and East Entrance Sections Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| Residential Drawings 100707PP006 Outline Planning Boundary Roof Plan P5 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| 230913_Plan A THFC Hotel Part_l_2021_gla_carbon_emission_reporting_spreadsheet_v2.0_0 - P02 | 29 Sept 2023 | View |
| 14 NDP Hotel S73 Application_Drawings_Part2 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN- GA-0123 Masterplan Level 03 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-SC-0183 Stadium East Stand Section Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN- GA-0121 Masterplan Level 01 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP4494PLNIP0429 Extreme Sports Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| ES Addendum_Appendix 19.1 · PDF | 7 Aug 2023 | View |
| 17 Utilities Planning Report · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-GA-0161 Stadium Roof Level General Arrangement Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| ES Addendum_Appendix 2.1 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-GA-0158 Stadium Level 08 General Arrangement Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| DAS 01- INTRODUCTION_Part3 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP4494PLNIP0427 Extreme Sports Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| ES Addendum_Appendix 17.6 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-GA-0523 Community Health Building Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| ES Addendum_Appendix 8.1 · PDF | 7 Aug 2023 | View |
| NDP Hotel N17 TVIA Addendum Final HR_Part26 · PDF | 22 Aug 2023 | View |
| NDP Hotel N17 TVIA Addendum Final HR_Part21 · PDF | 22 Aug 2023 | View |
| NDP Hotel N17 TVIA Addendum Final HR_Part20 · PDF | 22 Aug 2023 | View |
| 3.04 TA - NMED Transport Assessment NMED Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| NDP Hotel N17 TVIA Addendum Final HR_Part18 · PDF | 22 Aug 2023 | View |
| GLA0661 - Spurs Stadium - Stage 2 Letter · PDF | 25 Mar 2024 | View |
| NDP Hotel N17 TVIA Addendum Final HR_Part19 · PDF | 22 Aug 2023 | View |
| POP-4494-PLN-GA-0154 Stadium Level 04 General Arrangement Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-GA-0153 Stadium Level 03 General Arrangement Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-GA-8003 Landscape Detailed Area (Sheet 3 of 4) Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-GA-0520 Community Health Building Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| 04 Design and Access Statement_Part9 · PDF | 22 Aug 2023 | View |
| POP-4494-PLN-GA-0522 Community Health Building Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-GA-0202 Tottenham Experience Level 02 General Arrangement Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| DAS 10 -EXTREME SPORTS_Part1 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| DAS 07 - STADIUM DESIGN_Part8 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| DAS 11 - RESIDENTIAL_Part9 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| DAS 11 - RESIDENTIAL_Part7 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP4494PLNIP0428 Extreme Sports Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| NDP Hotel N17 TVIA Addendum Final HR_Part22 · PDF | 22 Aug 2023 | View |
| ES Addendum_Appendix 11.1_Part3 · PDF | 7 Aug 2023 | View |
| ES Addendum_Appendix 11.1_Part2 · PDF | 7 Aug 2023 | View |
| POP4494PLNIP0424 Extreme Sports Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| ES Addendum_Appendix 17.1 · PDF | 7 Aug 2023 | View |
| No objection from L.B. Hackney · PDF | 29 Sept 2023 | View |
| POP-4494-PLN-GA-0155 Stadium Level 05 General Arrangement Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| NDP Hotel - Design and Access Statement_Section 05_Part10 · PDF | 7 Aug 2023 | View |
| NDP Hotel - Design and Access Statement_Section 05_Part2 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-GA-0159 Stadium Level 09 General Arrangement Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| 231020_NDP Hotel WLC GLA_P04 | 26 Oct 2023 | View |
| Residential Drawings 100707115 Level R12 P4 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| Appendix C - DEN Carbon Factors · PDF | 26 Oct 2023 | View |
| Appendix D - PV Panel MAXEON 3 technical specification · PDF | 26 Oct 2023 | View |
| Appendix C- DEN Correspondence part 0 · PDF | 26 Oct 2023 | View |
| THHTL-F3A-XX-ZZ-SE-A-082610-P01 EXISTING SECTION · PDF | 6 Nov 2023 | View |
| THFC s106 - 070316 - Part I Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| NDP Hotel N17 TVIA Addendum Final HR_Part3 · PDF | 22 Aug 2023 | View |
| 05 Drainage_Strategy · PDF | 7 Aug 2023 | View |
| TA MED TA Appendix I Part 1 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| 231020_THFC Hotel Part_l_2021_gla_carbon_emission_reporting_spreadsheet_v2.0_0 - P05 | 26 Oct 2023 | View |
| 3.05 TA - NMED Transport Assessment NMED Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| 14 NDP Hotel S73 Application_Drawings_Part5 · PDF | 7 Aug 2023 | View |
| Planning Statement Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| NDP Hotel Design and Access Statement_Section 08_Part4 · PDF | 7 Aug 2023 | View |
| 03 Cover Letter · PDF | 7 Aug 2023 | View |
| POP 4494 PLN PP 0400 Extreme Sports Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| Residential Drawings 100707301 East Elevation P4 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| Residential Drawings 100707106 Level R3 P4 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| Appendix 1 - Plot 3 Conditions and Informatives · PDF | 1 Dec 2023 | View |
| Utilities Planning Report Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| TA MED TA Appendix I Part 5 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| DAS 07 - STADIUM DESIGN_Part10 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| DAS 10 -EXTREME SPORTS_Part2 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| 10 Flood Risk Assessment · PDF | 7 Aug 2023 | View |
| ES Addendum_Appendix 1.1_Part2 · PDF | 7 Aug 2023 | View |
| DAS 05 - CONSULTATION Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| Appendix B - LEAN_brukl_P05 · PDF | 26 Oct 2023 | View |
| Appendix A - THAMES WATER ASSETS · PDF | 26 Oct 2023 | View |
| Appendix A - Green SAPs · PDF | 26 Oct 2023 | View |
| 14 NDP Hotel S73 Application_Drawings_Part11 · PDF | 7 Aug 2023 | View |
| DAS 04 - DESIGN RESPONSE_Part3 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| Appendix A - Lean Saps · PDF | 26 Oct 2023 | View |
| Comments from Barnet Council · PDF | 4 Sept 2023 | View |
| DAS 11 - RESIDENTIAL_Part3 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN- EL-0331 Hotel Eastern Elevation Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| NDP Hotel N17 TVIA Addendum Final HR_Part16 · PDF | 22 Aug 2023 | View |
| NDP Hotel N17 TVIA Addendum Final HR_Part14 · PDF | 22 Aug 2023 | View |
| NDP Hotel N17 TVIA Addendum Final HR_Part4 · PDF | 22 Aug 2023 | View |
| 04 Design and Access Statement_Part13 · PDF | 22 Aug 2023 | View |
| 04 Design and Access Statement_Part11 · PDF | 22 Aug 2023 | View |
| Residential Drawings 100707136 Roof Plan P4 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| 04 Design and Access Statement_Part12 · PDF | 22 Aug 2023 | View |
| DAS 01- INTRODUCTION_Part1 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| NDP Hotel Design and Access Statement_Section 08_Part5 · PDF | 7 Aug 2023 | View |
| Appendix 6 - BNP Paribas Viability Review · PDF | 1 Dec 2023 | View |
| POP4494 PLN PP 0407 Extreme Sports Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| 09 Gateway One Fire Form Update · PDF | 1 Nov 2023 | View |
| 04 Design and Access Statement_Part17 · PDF | 22 Aug 2023 | View |
| Water Strategy Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN- GA-0131 Masterplan Basement Level Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| ES Addendum_Appendices_ToC · PDF | 7 Aug 2023 | View |
| POP-4494-PLN- GA-0129 Masterplan Level 09 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| 04 Design and Access Statement_Part19 · PDF | 22 Aug 2023 | View |
| POP-4494-PLN-DP-8008 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| Residential Drawings 100707200 Section A P4 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| 04 Design and Access Statement_Part14 · PDF | 22 Aug 2023 | View |
| POP-4494-PLN- GA-0300 Hotel Basement General Arrangement Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| Residential Drawings 100707119 Level R16 P4 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| 230728_NDP Hotel WLC GLA_P03 | 7 Aug 2023 | View |
| 09 Fire Statement Update · PDF | 1 Nov 2023 | View |
| 14 NDP Hotel S73 Application_Drawings_Part9 · PDF | 7 Aug 2023 | View |
| DAS 00 FRONT PAGE CONTENTS Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| Committee Report Main Report Approved under HGY20153000_Part2 · PDF | 7 Aug 2023 | View |
| Residential Drawings 100707128 Level R25bR27 P4 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-EL-0194 Stadium West Entrance Elevation Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| TA MED TA Appendix D Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| ES Addendum_Appendix 1.1_Part7 · PDF | 7 Aug 2023 | View |
| Appendix 9 - QRP Review 06 September 2023 · PDF | 1 Dec 2023 | View |
| ES Addendum_Main Text_Part 8 · PDF | 7 Aug 2023 | View |
| DAS 11 - RESIDENTIAL_Part10 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| THHTL-F3A-XX-02+-GA-A-082033-P02 LEVELS 02-11 TYPICAL HOTEL GENERAL ARRANGEMENT PLAN · PDF | 6 Nov 2023 | View |
| DAS 11 - RESIDENTIAL_Part11 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| AttachmentSummary · PDF | 7 Aug 2023 | View |
| Committee Report Main Report Approved under HGY20153000_Part1 · PDF | 7 Aug 2023 | View |
| CIL Form Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| THHTL-F3A-XX-XX-DR-A-082120-P02 WALL TYPE 01A - PLANAR BLADE - RESIDENTIAL · PDF | 6 Nov 2023 | View |
| ES Addendum_Appendix 1.1_Part5 · PDF | 7 Aug 2023 | View |
| THHTL-F3A-XX-00-GA-A-082021-P02 SOUTHERN DEVELOPMENT LEVEL 00 PLAN · PDF | 6 Nov 2023 | View |
| ES Addendum_Appendix 1.1_Part9 · PDF | 7 Aug 2023 | View |
| ES Addendum_Appendix 1.1_Part8 · PDF | 7 Aug 2023 | View |
| ES Addendum_Appendix 1.1_Part11 · PDF | 7 Aug 2023 | View |
| ES Addendum_Appendix 1.1_Part10 · PDF | 7 Aug 2023 | View |
| NDP Hotel Design and Access Statement_Section 08_Part2 · PDF | 7 Aug 2023 | View |
| POP 4494 PLN PP 0414 Extreme Sports Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| DAS 09 - HOTEL_Part1 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP 4494 PLN PP 0413 Extreme Sports Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| DAS 07 - STADIUM DESIGN_Part7 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| NDP Hotel N17 TVIA Addendum Final HR_Part10 · PDF | 22 Aug 2023 | View |
| Committee Report Addendum Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| NDP Hotel N17 TVIA Addendum Final HR_Part5 · PDF | 22 Aug 2023 | View |
| DAS 08 - TOTTENHAM EXPERIENCE_Part3 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| DAS 07 - STADIUM DESIGN_Part12 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| 04 Design and Access Statement_Part18 · PDF | 22 Aug 2023 | View |
| ES Addendum_Appendix 1.1_Part32 · PDF | 7 Aug 2023 | View |
| ES Addendum_Appendix 1.1_Part17 · PDF | 7 Aug 2023 | View |
| THHTL-F3A-XX-XX-DR-A-082121-P02 WALL TYPE 02 - RECESSED INFILL N S · PDF | 6 Nov 2023 | View |
| DAS 07 - STADIUM DESIGN_Part4 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| ES Addendum_Appendix 1.1_Part4 · PDF | 7 Aug 2023 | View |
| DAS 01- INTRODUCTION_Part2 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| ES Addendum_Appendix 1.1_Part15 · PDF | 7 Aug 2023 | View |
| ES Addendum_Appendix 1.1_Part6 · PDF | 7 Aug 2023 | View |
| NDP Hotel - Design and Access Statement_Section 05_Part7 · PDF | 7 Aug 2023 | View |
| DAS 11 - RESIDENTIAL_Part12 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| NDP Hotel N17 TVIA Addendum Final HR_Part7 · PDF | 22 Aug 2023 | View |
| NDP Hotel Design and Access Statement_Section 04_Part2 · PDF | 7 Aug 2023 | View |
| 04 Design and Access Statement_Part15 · PDF | 22 Aug 2023 | View |
| Residential Drawings 100707300 South Elevation P4 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| Health and Safety Executive Substantive Response · PDF | 24 Nov 2023 | View |
| TA MED TA Appendix F Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| NDP Hotel Design and Access Statement_Section 09 · PDF | 7 Aug 2023 | View |
| ES Addendum_Appendix 1.1_Part27 · PDF | 7 Aug 2023 | View |
| ES Addendum_Appendix 1.1_Part14 · PDF | 7 Aug 2023 | View |
| ES Addendum_Appendix 8.2 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN- SC-0143 Sections - Comparison to Consented Scheme Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| THHTL-F3A-XX-02+-DE-A-082100-P02 ACCESSIBLE HOTEL ROOMS - ENLARGED PLAN · PDF | 6 Nov 2023 | View |
| POP-4494-PLN- GA-0126 Masterplan Level 06 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-EL-0530 Community Health Building Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-DE-0233 Tottenham Experience Detail West Elevation and Section AA Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN- GA-0119 Application Site Boundary Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP 4494 PLN PP 0415 Extreme Sports Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN- GA-0120 Masterplan Level 00 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP 4494 PLN PP 0410 Extreme Sports Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| NDP Hotel Design and Access Statement_Section 08_Part7 · PDF | 7 Aug 2023 | View |
| Residential Drawings 100707302 North Elevation P4 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| ES Addendum_Appendix 1.1_Part13 · PDF | 7 Aug 2023 | View |
| NDP Hotel - Design and Access Statement_Section 05_Part11 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-EL-0175 Stadium Illuminated Signage Screens and Antennae Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-DE-0234 Tottenham Experience Detail East Elevation and Section BB Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP 4494 PLN PP 0406 Extreme Sports Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN- SC-0321 Hotel Section B-B Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP 4494 PLN PP 0403 Extreme Sports Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN- GA-0305 Hotel Typical Floor Plan (Levels 15-21) General Arrangement Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP 4494 PLN PP 0401 Extreme Sports Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| NDP Hotel N17 TVIA Addendum Final HR_Part8 · PDF | 22 Aug 2023 | View |
| POP-4494-PLN- GA-0303 Hotel Level 02 General Arrangement Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| NDP Hotel N17 TVIA Addendum Final HR_Part6 · PDF | 22 Aug 2023 | View |
| Appendix B - GREEN_brukl_P05 · PDF | 26 Oct 2023 | View |
| POP4494 PLN PP 0419 Extreme Sports Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| NDP Hotel N17 TVIA Addendum Final HR_Part2 · PDF | 22 Aug 2023 | View |
| POP-4494-PLN- GA-0307 Hotel Level 23 General Arrangement Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| 19 Circular Economy Statement · PDF | 26 Oct 2023 | View |
| Appendix E - THFC Hotel - GHA-Overheating-Tool · PDF | 26 Oct 2023 | View |
| NDP Hotel - Design and Access Statement_Section 05_Part8 · PDF | 7 Aug 2023 | View |
| DAS 12 - NORTH-EAST BUILDING Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-GA-0201 Tottenham Experience Level 01 General Arrangement Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-GA-0200 Tottenham Experience Level 00 General Arrangement Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| Appendix 2 - Site Wide Conditions · PDF | 1 Dec 2023 | View |
| DAS 13 - PUBLIC REALM_Part4 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| DAS 13 - PUBLIC REALM_Part2 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| NDP Hotel Design and Access Statement_Section 02_Part6 · PDF | 7 Aug 2023 | View |
| ES Addendum_Appendices 6.1-6.4 · PDF | 7 Aug 2023 | View |
| DAS 13 - PUBLIC REALM_Part1 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| NDP Hotel Design and Access Statement_Section 01 · PDF | 7 Aug 2023 | View |
| DAS 13 - PUBLIC REALM_Part5 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-DE-0235 Tottenham Experience Facade Detail Elevation and Section Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| ES Addendum_Appendix 8.3 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-EL-0171 Stadium North and South Elevations Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN- SC-0320 Hotel Section A-A Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| ES Addendum_Appendix 2.2 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-EL-0542 Community Health Building Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| ES Addendum_Appendix 17.5 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-EL-0191 Stadium North East Entrance Elevation Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| ES Addendum_Appendix 17.2 · PDF | 7 Aug 2023 | View |
| THHTL-F3A-XX-XX-DR-A-082122-P02 WALL TYPE 03 - RECESSED INFILL E W · PDF | 6 Nov 2023 | View |
| POP-4494-PLN- EE-0341 Hotel Facade Detail Enlarged Elevation Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP 4494 PLN PP 0404 Extreme Sports Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN- GA-0130 Masterplan Level 10 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| ES Addendum_Appendix 1.1_Part16 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN- GA-0124 Masterplan Level 04 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| 231020_THFC Hotel (Stage 1) GLA Energy Memo_BH response | 26 Oct 2023 | View |
| POP-4494-PLN- EL-0332 Hotel Northern Elevation Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-GA-0513 Community Health Building Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP 4494 PLN PP 0418 Extreme Sports Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-EL-0193 Stadium South Entrance Elevation Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-GA-8000 Landscape General Arrangement Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| (DS6107105) Capacity confirmation letter · PDF | 26 Oct 2023 | View |
| POP-4494-PLN-GA-8100 Landscape Temporary Surfacing Plan Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| ES Addendum_Appendix 1.1_Part30 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-GA-8009 Landscape Illustrative PR Masterplan Project Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| ES Addendum_Appendix 1.1_Part25 · PDF | 7 Aug 2023 | View |
| ES Addendum_Main Text_Part 2 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-GA-0156 Stadium Level 06 General Arrangement Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| Comments from the Environment Agency · PDF | 31 Aug 2023 | View |
| DAS 13 - PUBLIC REALM_Part3 Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-GA-8001 Landscape Detailed Area (Sheet 1 of 4) Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
| ES Addendum_Appendix 1.1_Part21 · PDF | 7 Aug 2023 | View |
| POP-4494-PLN-GA-0512 Community Health Building Approved under HGY20153000 · PDF | 7 Aug 2023 | View |
Documents open on the council website. Browse council documents if a link has changed.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
No related records were published in this section.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.