Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Flat C, 32-34 Highgate High Street, Hornsey, London, N6 5JG
Last published check: 3 Oct 2026, 20:12. Check the council record for more recent changes.
Flat C, 32-34 Highgate High Street, Hornsey, London, N6 5JG
This record has no verified map location.
Proposed installation of three rooflights and enlargement of existing rear dormer window.
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| Design_Heritage Statement_Flat C 32_34 Highgate High St_REVISED copy.pdf · PDF | 4 Apr 2023 | View |
| Drawing 02C_Proposed Layout Plan.pdf · PDF | 4 Apr 2023 | View |
| Additional Document 05_Pre Application Advice_Thomas Muston.pdf · PDF | 4 Apr 2023 | View |
| Additional Document 04_Photographic Survey_Rooflight Positions.pdf · PDF | 4 Apr 2023 | View |
| Drawing 01_Existing Layout Plan.pdf · PDF | 4 Apr 2023 | View |
| Additional Document 02_Site Location.pdf · PDF | 4 Apr 2023 | View |
| DM Decision.pdf · PDF | 13 Oct 2023 | View |
| Additional Document 03_Photographic Survey_Entire Flat.pdf · PDF | 4 Apr 2023 | View |
| Drawing 03C_Proposed Ceiling Plan.pdf · PDF | 4 Apr 2023 | View |
| ApplicationFormRedacted.pdf · PDF | 4 Apr 2023 | View |
| Drawing 08_Existing Layout Plan Modern Historic Fabric.pdf · PDF | 4 Apr 2023 | View |
| Drawing 09_Internal Plan Elevation Section Proposed New Dormer.pdf · PDF | 4 Apr 2023 | View |
| Design_Heritage Statement_Flat C 32_34 Highgate High St_REVISED.pdf · PDF | 4 Apr 2023 | View |
| Additional Document 01_CARE Engineer Structural Assessment Report.pdf · PDF | 4 Apr 2023 | View |
| Drawing 10_Planning Application OLD_1987_0777_Existing and Proposed Plans.pdf · PDF | 4 Apr 2023 | View |
| Drawing 07D_Proposed Roof Elevation ZZ Sections CC DD.pdf · PDF | 4 Apr 2023 | View |
| Drawing 06B_Proposed Roof Plan.pdf · PDF | 4 Apr 2023 | View |
| Drawing 05_Existing Roof Plan.pdf · PDF | 4 Apr 2023 | View |
| DM Final Officer Report.pdf · PDF | 13 Oct 2023 | View |
| Drawing 04A_Existing and Proposed External Elevations.pdf · PDF | 4 Apr 2023 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
No related records were published in this section.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.