Council planning record

Approval of details reserved by condition 3 (Written confirmation of completion of all remedial or precautionary measures required to deal with ground contamination on site and the approved regime of proof testing implemented to demonstrate the effectiveness of the remediation work) attached to planning consent HGY/2017/3118.

Holly Bank Cottage, Holly Bank, Muswell Hill, London, N10 3TH

Decision MadeReference: HGY/2023/0562London Borough of Haringey

Last published check: 4 Oct 2026, 06:46. Check the council record for more recent changes.

Application location

Holly Bank Cottage, Holly Bank, Muswell Hill, London, N10 3TH

This record has no verified map location.

Application summary

Status
Decision Made
Application type
Approval of details reserved by a condition
Received
Not published
Validated
Not published
Determination deadline
Not published
Local authority
London Borough of Haringey

Application overview

Approval of details reserved by condition 3 (Written confirmation of completion of all remedial or precautionary measures required to deal with ground contamination on site and the approved regime of proof testing implemented to demonstrate the effectiveness of the remediation work) attached to planning consent HGY/2017/3118.

Proposal details

Reference
HGY/2023/0562
Alternative references
PP-11963735
Ward
Muswell Hill
Agent
Mr Mandip Sahota

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 13 of 13

DocumentPublishedAction
ApplicationFormRedacted.pdf · PDF24 Feb 2023View
image004.png24 Feb 2023View
HOLLYBANKS BLACKFEN TOPSOIL DELIVERY TICKET SAMPLE FOR C3 · PDF6 Jun 2023View
2024.11.12 GB727B-VR-NOV-2024-REV2 · PDF14 Nov 2024View
HOLLYBANKS CONDITION 3 BARRIER PIPE INSTALLATIONS · PDF6 Jun 2023View
DM Decision.pdf · PDF28 Nov 2024View
1413-100 P2 Site Plan (featuring new land acquisition).pdf · PDF24 Feb 2023View
HOLLYBANKS RECORD PHOTOS FOR CONDITION 3 - SOFT LANDSCAPE AREA PREPARATION · PDF6 Jun 2023View
POE DS6049546 · PDF6 Oct 2023View
GB727-GGR-JAN-2021.pdf · PDF24 Feb 2023View
RQ DS6049546 Thames water quote 3.9.18 signed · PDF6 Oct 2023View
DM Final Officer Report.pdf · PDF28 Nov 2024View
GB727A-VR-AUG-2023 Hollybank Verification Report - SUPERSEDED · PDF17 Aug 2023View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Decision Date

    Published milestoneCouncil source

Decision & conditions

Approve
DM Decision.pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.