Status on council recordCouncil status: Decision Made

Request under Regulation 13 of the Town and Country Planning (Environmental Impact Assessment) (England) Regulations 2015 (as amended) for a EIA Scoping Opinion for the development of Phase 1 of Meridian Water comprising up to 725 residential units (class C3), new station building, platforms and associated interchange and drop-off facilities, a maximum of 1,250 sqm retail (A1/A2/A3) floorspace, 600 sqm of community (D1) floorspace, 750 sqm of leisure (D2) floorspace, associated site infrastructure works including ground and remediation works, roads, cycleways and footpaths, utility works above and below ground, surface water drainage works, energy centre and associated plant, public open space and childrens play areas, and various temporary meantime uses without structures, e.g. landscaping and open space (Observations to L.B. Enfield)

Meridian Water Willoughby Lane And Meridian Way, London, N18

London Borough of HaringeyReference HGY/2016/0557Observations for Adjoining Borough

Last published check: 18 Nov 2026, 21:03. Check the council record for more recent changes.

Status and dates

Last published check: 18 Nov 2026, 21:03 (UK)

  1. Not publishedReceivedNo date on council record
  2. Not publishedValidatedNo date on council record
  3. Not publishedConsultationNo date on council record
  4. Not publishedTarget decision dateNo date on council record
  5. DecidedObject9 Mar 2016

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (1)
  1. Decision Date

    Published milestoneCouncil source
Application type
Observations for Adjoining Borough
Ward
Unknown
Documents
2 published

Proposal

Request under Regulation 13 of the Town and Country Planning (Environmental Impact Assessment) (England) Regulations 2015 (as amended) for a EIA Scoping Opinion for the development of Phase 1 of Meridian Water comprising up to 725 residential units (class C3), new station building, platforms and associated interchange and drop-off facilities, a maximum of 1,250 sqm retail (A1/A2/A3) floorspace, 600 sqm of community (D1) floorspace, 750 sqm of leisure (D2) floorspace, associated site infrastructure works including ground and remediation works, roads, cycleways and footpaths, utility works above and below ground, surface water drainage works, energy centre and associated plant, public open space and childrens play areas, and various temporary meantime uses without structures, e.g. landscaping and open space (Observations to L.B. Enfield)

Reference
HGY/2016/0557
Ward
Unknown
Agent
L.B. Enfield

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • Decision NoticeDecision Notice9 Mar 2016View
  • Letter from L.B. EnfieldEnvironmental Impact Assessment23 Feb 2016View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Object
Decision Notice
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.