Status on council recordCouncil status: Under Consultation
Demolition of the single storey back addition and rear outbuildings attached to the rear of the main building; erection of side and rear extensions at lower ground, upper ground and first floor level, erection of a rear roof extension to replace the existing dormer window, excavation beneath the main building in connection with the creation of a new basement and the formation of a roof terrace at upper ground floor level to the main building; change of use of the main building from office (Class E) into 2 x two bedroom self-contained flats; erection of a part one storey plus-basement single family dwellinghouse in the rear garden; erection of a new boundary wall with three new entrances to the side elevation; associated landscaping and external alterations.
Demolition of the single storey back addition and rear outbuildings attached to the rear of the main building; erection of side and rear extensions at lower ground, upper ground and first floor level, erection of a rear roof extension to replace the existing dormer window, excavation beneath the main building in connection with the creation of a new basement and the formation of a roof terrace at upper ground floor level to the main building; change of use of the main building from office (Class E) into 2 x two bedroom self-contained flats; erection of a part one storey plus-basement single family dwellinghouse in the rear garden; erection of a new boundary wall with three new entrances to the side elevation; associated landscaping and external alterations.
Reference
P/2026/02798/FUL
Ward
Grove
Agent
Mrs Sharon Claughton / Chestnut Planning
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.