Status on council recordCouncil status: Under Consultation

Erection of a rear extension at second floor level over part of the existing back addition; erection of a single storey rear extension, to the side and rear of the existing back addition; excavation of the front and rear garden to form lightwells in connection with the enlargement of the existing basement and formation of a plant room underneath the front courtyard area; installation of a new enlarged window to replace the existing window in the rear roofslope; installation of a new window opening to the side of rear back addition at first floor level; erection of a brick wall to form a bin store area in the front garden.

50 Chipstead Street, London, SW6 3SS

London Borough of Hammersmith & FulhamReference P/2026/02634/HH

Last published check: 19 Nov 2026, 04:29. Check the council record for more recent changes.

Status and dates

Last published check: 19 Nov 2026, 04:29 (UK)

  1. DoneReceived17 Oct 2026
  2. DoneValidated19 Oct 2026
  3. Not publishedConsultationNo date on council record
  4. Date set by councilTarget decision date14 Dec 2026
  5. Not yet publishedDecisionNo decision on council record

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (4)
  1. Received

    Published milestoneCouncil source
  2. Validated

    Published milestoneCouncil source
  3. Registered

    Published milestoneCouncil source
  4. Statutory expiry date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Ward
Parsons Green And Sandford
Documents
24 published

Proposal

Erection of a rear extension at second floor level over part of the existing back addition; erection of a single storey rear extension, to the side and rear of the existing back addition; excavation of the front and rear garden to form lightwells in connection with the enlargement of the existing basement and formation of a plant room underneath the front courtyard area; installation of a new enlarged window to replace the existing window in the rear roofslope; installation of a new window opening to the side of rear back addition at first floor level; erection of a brick wall to form a bin store area in the front garden.

Reference
P/2026/02634/HH
Ward
Parsons Green And Sandford
Agent
Mr Zaeem Chaudhary / AC DESIGN SOLUTION

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • ApplicationFormRedacted.pdfCouncil documentNot publishedView
  • CLP_50_Chipstead_Street.pdfCouncil documentNot publishedView
  • FRA_50_Chipstead_Street.pdfCouncil documentNot publishedView
  • CMS_50_Chipstead_Street.pdfCouncil documentNot publishedView
  • A-000 OS PLAN.pdfCouncil documentNot publishedView
  • A-205 EXISTING AND PROPOSED SECTIONS.pdfCouncil documentNot publishedView
  • SiteBlock Plan - Existing_included_in_Layout Plan - Existing.pdfCouncil documentNot publishedView
  • A-203 PROPOSED FRONT AND OTHER SIDE ELEVATIONS.pdfCouncil documentNot publishedView

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Under Consultation
SITE_NOTICE Press Notice
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.