Status on council recordCouncil status: Under Consultation
Erection of a rear roof extension; erection of a rear extension at second floor level over part of the existing back addition; installation of 3no rooflights in the front roofslope and 1no rooflight above the main flat roof at roof level; installation of a new window to replace the existing window at first floor level and replacement of existing French doors with a window at ground floor level to the rear elevation; installation of bi-folding doors to replace the existing French doors and windows to the side of rear back addition at ground floor level; replacement of timber trellis screening with obscured glazed screen (to the rear of existing roof terrace) and installation of an air source heat pump above the roof of ground floor rear back addition.
Erection of a rear roof extension; erection of a rear extension at second floor level over part of the existing back addition; installation of 3no rooflights in the front roofslope and 1no rooflight above the main flat roof at roof level; installation of a new window to replace the existing window at first floor level and replacement of existing French doors with a window at ground floor level to the rear elevation; installation of bi-folding doors to replace the existing French doors and windows to the side of rear back addition at ground floor level; replacement of timber trellis screening with obscured glazed screen (to the rear of existing roof terrace) and installation of an air source heat pump above the roof of ground floor rear back addition.
Reference
P/2026/02464/HH
Ward
Munster
Agent
Steven Davidson / Design Team
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.