Council planning record
Ravenscourt Park Hospital Ravenscourt Park London W6 0TU
Ravenscourt Park Hospital Ravenscourt Park London W6 0TU
This record has no verified map location.
Submission of Method Statement (Soft Strip, Historic Fabric & Schedule of Artefacts), in compliance with Condition 22 of Listed Building Consent 2023/03130/LBC dated 30TH July 2026.
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| RCE - Strip Out and Protection Level B1 Floor Plan - Phase 1.pdfCouncil document | Not published | View |
| RCE - Strip Out and Protection Level 02 Floor Plan - Phase 1.pdfCouncil document | Not published | View |
| RCE - Strip Out and Protection Level 01 Floor Plan - Phase 1.pdfCouncil document | Not published | View |
| RCE - Strip Out and Protection Level 0G Floor Plan - Phase 1.pdfCouncil document | Not published | View |
| RCE - Strip Out West Elevation - Phase 1 - 2210-SPP-RCE-ZZ-DR-A-95-3004-S4-P01.pdfCouncil document | Not published | View |
| RCE - Strip Out South Elevation - Phase 1 - 2210-SPP-RCE-ZZ-DR-A-95-3001-S4-P01.pdfCouncil document | Not published | View |
| RCE - Strip Out Section 02 - Phase 1 - 2210-SPP-RCE-ZZ-DR-A-95-2002-S4-P01.pdfCouncil document | Not published | View |
| RCE - Strip Out Section 01 - Phase 1 - 2210-SPP-RCE-ZZ-DR-A-95-2001-S4-P01.pdfCouncil document | Not published | View |
| RCE - Strip Out North Elevation - Phase 1 - 2210-SPP-RCE-ZZ-DR-A-95-3003-S4-P01.pdfCouncil document | Not published | View |
| RCE - Strip Out Level 01 RCP - Phase 1 - 2210-SPP-RCE-0G-DR-A-95-3503-S4-P01.pdfCouncil document | Not published | View |
| RCE - Strip Out Level 01 Floor Finishes - Phase 1.pdfCouncil document | Not published | View |
| RCE - Strip Out Level 0G RCP - Phase 1 - 2210-SPP-RCE-0G-DR-A-95-3502-S4-P01.pdfCouncil document | Not published | View |
| RCE - Strip Out Level 0G Floor Finishes - Phase 1.pdfCouncil document | Not published | View |
| RCE - Strip Out East Elevation - Phase 1 - 2210-SPP-RCE-ZZ-DR-A-95-3002-S4-P01.pdfCouncil document | Not published | View |
| RCE - Strip Out and Protection Roof Plan - Phase 1.pdfCouncil document | Not published | View |
| RCD - Strip Out Level B1 Floor Finishes - Phase 1.pdfCouncil document | Not published | View |
| RCD - Strip Out Level 03 RCP - Phase 1 - 2210-SPP-RCD-03-DR-A-95-3505-S4-P01.pdfCouncil document | Not published | View |
| RCD - Strip Out Level 03 Floor Finishes - Phase 1.pdfCouncil document | Not published | View |
| RCD - Strip Out Level 02 RCP - Phase 1 - 2210-SPP-RCD-02-DR-A-95-3504-S4-P01.pdfCouncil document | Not published | View |
| RCD - Strip Out Level 02 Floor Finishes - Phase 1.pdfCouncil document | Not published | View |
| RCD - Strip Out Level 01 RCP - Phase 1 - 2210-SPP-RCD-01-DR-A-95-3503-S4-P01.pdfCouncil document | Not published | View |
| RCD - Strip Out Level 01 Floor Finishes - Phase 1.pdfCouncil document | Not published | View |
| RCD - Strip Out Level 0G RCP - Phase 1 - 2210-SPP-RCD-0G-DR-A-95-3502-S4-P01.pdfCouncil document | Not published | View |
| RCD - Strip Out Level 0G Floor Finishes - Phase 1.pdfCouncil document | Not published | View |
| RCD - Strip Out East Elevation - Phase 1 - 2210-SPP-RCD-ZZ-DR-A-95-3002-S4-P01.pdfCouncil document | Not published | View |
| RCD - Strip Out and Protection Roof Plan - Phase 1.pdfCouncil document | Not published | View |
| RCD - Strip Out and Protection Level B1 Floor Plan - Phase 1.pdfCouncil document | Not published | View |
| RCD - Strip Out and Protection Level 03 Floor Plan - Phase 1.pdfCouncil document | Not published | View |
| RCD - Strip Out and Protection Level 02 Floor Plan - Phase 1.pdfCouncil document | Not published | View |
| RCD - Strip Out and Protection Level 01 Floor Plan - Phase 1.pdfCouncil document | Not published | View |
| RCD - Strip Out and Protection Level 0G Floor Plan - Phase 1.pdfCouncil document | Not published | View |
| RCD - Strip Out West Elevation - Phase 1.pdfCouncil document | Not published | View |
| RCD - Strip Out South Elevation - Phase 1.pdfCouncil document | Not published | View |
| RCD - Strip Out Section 02 - Phase 1 - 2210-SPP-RCD-ZZ-DR-A-95-2002-S4-P01.pdfCouncil document | Not published | View |
| RCD - Strip Out Section 01 - Phase 1 - 2210-SPP-RCD-ZZ-DR-A-95-2001-S4-P01.pdfCouncil document | Not published | View |
| RCD - Strip Out North Elevation - Phase 1.pdfCouncil document | Not published | View |
| RCD - Strip Out Level B1 RCP - Phase 1 - 2210-SPP-RCD-B1-DR-A-95-3501-S4-P01.pdfCouncil document | Not published | View |
| RCC - Strip Out and Protection Level 02 Floor Plan - Phase 1.pdfCouncil document | Not published | View |
| RCC - Strip Out and Protection Level 01 Floor Plan - Phase 1.pdfCouncil document | Not published | View |
| RCC - Strip Out and Protection Level 0G Floor Plan - Phase 1.pdfCouncil document | Not published | View |
| RCC - Heritage Door Storage Level 0G - Phase 1.pdfCouncil document | Not published | View |
| RCC - Strip Out West Elevation - Phase 1.pdfCouncil document | Not published | View |
| RCC - Strip Out South Elevation - Phase 1.pdfCouncil document | Not published | View |
| RCC - Strip Out Section 02 - Phase 1 - 2210-SPP-RCC-ZZ-DR-A-95-2002-S4-P01.pdfCouncil document | Not published | View |
| RCC - Strip Out Section 01 - Phase 1 - 2210-SPP-RCC-ZZ-DR-A-95-2001-S4-P01.pdfCouncil document | Not published | View |
| RCC - Strip Out North Elevation - Phase 1.pdfCouncil document | Not published | View |
| RCC - Strip Out Level B1 RCP - Phase 1 - 2210-SPP-RCC-B1-DR-A-95-3501-S4-P01.pdfCouncil document | Not published | View |
| RCC - Strip Out Level 04 RCP - Phase 1 - 2210-SPP-RCC-04-DR-A-95-3506-S4-P01.pdfCouncil document | Not published | View |
| RCC - Strip Out Level 04 Floor Finishes - Phase 1.pdfCouncil document | Not published | View |
| RCC - Strip Out Level 03 RCP - Phase 1 - 2210-SPP-RCC-03-DR-A-95-3505-S4-P01.pdfCouncil document | Not published | View |
| RCC - Strip Out Level 03 Floor Finishes - Phase 1.pdfCouncil document | Not published | View |
| RCC - Strip Out Level 02 RCP - Phase 1 - 2210-SPP-RCC-02-DR-A-95-3504-S4-P01.pdfCouncil document | Not published | View |
| RCC - Strip Out Level 02 Floor Finishes - Phase 1 - 2210-SPP-RCC-02-DR-A-95-4004-S4-P01.pdfCouncil document | Not published | View |
| RCC - Strip Out Level 01 RCP - Phase 1 - 2210-SPP-RCC-01-DR-A-95-3503-S4-P01.pdfCouncil document | Not published | View |
| RCC - Strip Out Level 01 Floor Finishes - Phase 1.pdfCouncil document | Not published | View |
| RCC - Strip Out Level 0G RCP - Phase 1 - 2210-SPP-RCC-0G-DR-A-95-3502-S4-P01.pdfCouncil document | Not published | View |
| RCC - Strip Out Level 0G Floor Finishes - Phase 1.pdfCouncil document | Not published | View |
| RCC - Strip Out East Elevation - Phase 1 - 2210-SPP-RCC-ZZ-DR-A-95-3002-S4-P01.pdfCouncil document | Not published | View |
| RCC - Strip Out and Protection Roof Plan - Phase 1.pdfCouncil document | Not published | View |
| RCC - Strip Out and Protection Level B1 Floor Plan - Phase 1.pdfCouncil document | Not published | View |
| RCC - Strip Out and Protection Level 04 Floor Plan - Phase 1.pdfCouncil document | Not published | View |
| RCC - Strip Out and Protection Level 03 Floor Plan - Phase 1.pdfCouncil document | Not published | View |
| RCB - Strip Out and Protection Childrens Wards - Phase 1.pdfCouncil document | Not published | View |
| RCB - Strip Out Level 05 RCP - Part 1 - Phase 1 - 2210-SPP-RCB-05-DR-A-95-3513-S4-P01.pdfCouncil document | Not published | View |
| RCB - Strip Out Level 04 RCP - Part 2 - Phase 1 - 2210-SPP-RCB-04-DR-A-95-3512-S4-P01.pdfCouncil document | Not published | View |
| RCB - Strip Out Level 04 RCP - Part 1 - Phase 1 - 2210-SPP-RCB-04-DR-A-95-3511-S4-P01.pdfCouncil document | Not published | View |
| RCB - Strip Out Level 03 RCP - Part 2 - Phase 1 - 2210-SPP-RCB-03-DR-A-95-3510-S4-P01.pdfCouncil document | Not published | View |
| RCB - Strip Out Level 03 RCP - Part 1 - Phase 1 - 2210-SPP-RCB-03-DR-A-95-3509-S4-P01.pdfCouncil document | Not published | View |
| RCB - Strip Out Level 02 RCP - Part 2 - Phase 1 - 2210-SPP-RCB-02-DR-A-95-3508-S4-P01.pdfCouncil document | Not published | View |
| RCB - Strip Out Level 02 RCP - Part 1 - Phase 1 - 2210-SPP-RCB-02-DR-A-95-3507-S4-P01.pdfCouncil document | Not published | View |
| RCB - Strip Out Level 01 RCP - Part 2 - Phase 1.pdfCouncil document | Not published | View |
| RCB - Strip Out Level 01 RCP - Part 1 - Phase 1.pdfCouncil document | Not published | View |
| RCB - Strip Out Level 0G RCP - Part 2 - Phase 1 - 2210-SPP-RCB-0G-DR-A-95-3504-S4-P01.pdfCouncil document | Not published | View |
| RCB - Strip Out Level 0G RCP - Part 1 - Phase 1 - 2210-SPP-RCB-0G-DR-A-95-3503-S4-P01.pdfCouncil document | Not published | View |
| RCB - Strip Out East Elevation - Phase 1 - 2210-SPP-RCB-ZZ-DR-A-95-3001-S4-P01.pdfCouncil document | Not published | View |
| RCB - Strip Out and Protection Waiting Room Level 03 - Phase 1.pdfCouncil document | Not published | View |
| RCB - Strip Out and Protection Waiting Room Level 02 - Phase 1.pdfCouncil document | Not published | View |
| RCB - Strip Out and Protection Waiting Room Level 01 - Phase 1.pdfCouncil document | Not published | View |
| RCB - Strip Out and Protection Waiting Room Level 0G - Phase 1.pdfCouncil document | Not published | View |
| RCB - Strip Out and Protection Roof Plan - Part 2 - Phase 1.pdfCouncil document | Not published | View |
| RCB - Strip Out and Protection Roof Plan - Part 1 - Phase 1.pdfCouncil document | Not published | View |
| RCB - Strip Out and Protection NW and NE Stairs - Phase 1.pdfCouncil document | Not published | View |
| RCB - Strip Out and Protection Level B1 Floor Plan - Part 2 - Phase 1.pdfCouncil document | Not published | View |
| RCB - Strip Out and Protection Level B1 Floor Plan - Part 1 - Phase 1.pdfCouncil document | Not published | View |
| RCB - Strip Out and Protection Level 05 Floor Plan - Part 2 - Phase 1.pdfCouncil document | Not published | View |
| RCB - Strip Out and Protection Level 05 Floor Plan - Part 1 - Phase 1.pdfCouncil document | Not published | View |
| RCB - Strip Out and Protection Level 04 Floor Plan - Part 2 - Phase 1.pdfCouncil document | Not published | View |
| RCB - Strip Out and Protection Level 04 Floor Plan - Part 1 - Phase 1.pdfCouncil document | Not published | View |
| RCB - Strip Out and Protection Level 03 Floor Plan - Part 2 - Phase 1.pdfCouncil document | Not published | View |
| RCB - Strip Out and Protection Level 03 Floor Plan - Part 1 - Phase 1.pdfCouncil document | Not published | View |
| RCB - Strip Out and Protection Level 02 Floor Plan - Part 2 - Phase 1.pdfCouncil document | Not published | View |
| RCB - Strip Out and Protection Level 02 Floor Plan - Part 1 - Phase 1.pdfCouncil document | Not published | View |
| RCB - Strip Out and Protection Level 01 Floor Plan - Part 2 - Phase 1.pdfCouncil document | Not published | View |
| RCB - Strip Out and Protection Level 01 Floor Plan - Part 1 - Phase 1.pdfCouncil document | Not published | View |
| RCB - Strip Out and Protection Level 0G Floor Plan - Part 2 - Phase 1.pdfCouncil document | Not published | View |
| RCB - Strip Out and Protection Level 0G Floor Plan - Part 1 - Phase 1.pdfCouncil document | Not published | View |
| RCB - Strip Out West Elevation - Phase 1 - 2210-SPP-RCB-ZZ-DR-A-95-3003-S4-P01.pdfCouncil document | Not published | View |
| RCB - Strip Out South Elevation - Phase 1 - 2210-SPP-RCB-ZZ-DR-A-95-3002-S4-P01.pdfCouncil document | Not published | View |
| RCB - Strip Out Section 03 - Phase 1 - 2210-SPP-RCB-ZZ-DR-A-95-2003-S4-P01.pdfCouncil document | Not published | View |
| RCB - Strip Out Section 02 - Phase 1 - 2210-SPP-RCB-ZZ-DR-A-95-2002-S4-P01.pdfCouncil document | Not published | View |
| RCB - Strip Out Section 01 - Phase 1 - 2210-SPP-RCB-ZZ-DR-A-95-2001-S4-P01.pdfCouncil document | Not published | View |
| RCB - Strip Out North Elevation - Phase 1 - 2210-SPP-RCB-ZZ-DR-A-95-3004-S4-P01.pdfCouncil document | Not published | View |
| RCB - Strip Out Level B1 RCP - Part 2 - Phase 1 - 2210-SPP-RCB-B1-DR-A-95-3502-S4-P01.pdfCouncil document | Not published | View |
| RCB - Strip Out Level B1 RCP - Part 1 - Phase 1 - 2210-SPP-RCB-B1-DR-A-95-3501-S4-P01.pdfCouncil document | Not published | View |
| RCB - Strip Out Level 05 RCP - Part 2 - Phase 1 - 2210-SPP-RCB-05-DR-A-95-3514-S4-P01.pdfCouncil document | Not published | View |
| RCB - Strip Out Level 05 Floor Finishes - Part 2 - Phase 1.pdfCouncil document | Not published | View |
| RCB - Strip Out Level 05 Floor Finishes - Part 1 - Phase 1.pdfCouncil document | Not published | View |
| RCB - Strip Out Level 04 Floor Finishes - Part 2 - Phase 1.pdfCouncil document | Not published | View |
| RCB - Strip Out Level 04 Floor Finishes - Part 1 - Phase 1.pdfCouncil document | Not published | View |
| RCB - Strip Out Level 03 Floor Finishes - Part 2 - Phase 1.pdfCouncil document | Not published | View |
| RCB - Strip Out Level 03 Floor Finishes - Part 1 - Phase 1.pdfCouncil document | Not published | View |
| RCB - Strip Out Level 02 Floor Finishes - Part 2 - Phase 1.pdfCouncil document | Not published | View |
| RCB - Strip Out Level 02 Floor Finishes - Part 1 - Phase 1.pdfCouncil document | Not published | View |
| RCB - Strip Out Level 01 Floor Finishes - Part 2 - Phase 1.pdfCouncil document | Not published | View |
| RCB - Strip Out Level 01 Floor Finishes - Part 1 - Phase 1.pdfCouncil document | Not published | View |
| RCB - Strip Out Level 0G Floor Finishes - Part 2 - Phase 1.pdfCouncil document | Not published | View |
| RCB - Strip Out Level 0G Floor Finishes - Part 1 - Phase 1.pdfCouncil document | Not published | View |
| RCB - Strip Out Level B1 Floor Finishes - Part 2 - Phase 1.pdfCouncil document | Not published | View |
| RCB - Strip Out Level B1 Floor Finishes - Part 1 - Phase 1.pdfCouncil document | Not published | View |
| RCA - Strip Out and Protection Grand Entrance - Phase 1.pdfCouncil document | Not published | View |
| RCA - Strip Out and Protection Roof Plan - Phase 1.pdfCouncil document | Not published | View |
| RCA - Strip Out and Protection Level 03 Floor Plan - Phase 1.pdfCouncil document | Not published | View |
| RCA - Strip Out and Protection Level 02 Floor Plan - Phase 1.pdfCouncil document | Not published | View |
| RCA - Strip Out and Protection Level 1M Floor Plan - Phase 1.pdfCouncil document | Not published | View |
| RCA - Strip Out and Protection Level 01 Floor Plan - Phase 1.pdfCouncil document | Not published | View |
| RCA - Strip Out and Protection Level 0G Floor Plan - Phase 1.pdfCouncil document | Not published | View |
| RCA - Strip Out Level 02 RCP - Phase 1 - 2210-SPP-RCA-02-DR-A-95-3504-S4-P01.pdfCouncil document | Not published | View |
| RCA - Strip Out Level 02 Floor Finishes - Phase 1 - 2210-SPP-RCA-02-DR-A-95-4004-S4-P01.pdfCouncil document | Not published | View |
| RCA - Strip Out Level 1M RCP - Phase 1 - 2210-SPP-RCA-1M-DR-A-95-3503-S4-P01.pdfCouncil document | Not published | View |
| RCA - Strip Out Level 1M Floor Finishes - Phase 1 - 2210-SPP-RCA-1M-DR-A-95-4003-S4-P01.pdfCouncil document | Not published | View |
| RCA - Strip Out Level 01 RCP - Phase 1 - 2210-SPP-RCA-01-DR-A-95-3502-S4-P01.pdfCouncil document | Not published | View |
| RCA - Strip Out Level 01 Floor Finishes - Phase 1 - 2210-SPP-RCA-01-DR-A-95-4002-S4-P01.pdfCouncil document | Not published | View |
| RCA - Strip Out Level 0G RCP - Phase 1 - 2210-SPP-RCA-0G-DR-A-95-3501-S4-P01.pdfCouncil document | Not published | View |
| RCA - Strip Out Level 0G Floor Finishes - Phase 1 - 2210-SPP-RCA-0G-DR-A-95-4001-S4-P01.pdfCouncil document | Not published | View |
| RCA - Strip Out East Elevation - Phase 1 - 2210-SPP-RCA-ZZ-DR-A-95-3001-S4-P01.pdfCouncil document | Not published | View |
| RCA - Strip Out West Elevation - Phase 1 - 2210-SPP-RCA-ZZ-DR-A-95-3003-S4-P01.pdfCouncil document | Not published | View |
| RCA - Strip Out South Elevation - Phase 1 - 2210-SPP-RCA-ZZ-DR-A-95-3002-S4-P01.pdfCouncil document | Not published | View |
| RCA - Strip Out Section 02 - Phase 1 - 2210-SPP-RCA-ZZ-DR-A-95-2002-S4-P01.pdfCouncil document | Not published | View |
| RCA - Strip Out Section 01 - Phase 1 - 2210-SPP-RCA-ZZ-DR-A-95-2001-S4-P01.pdfCouncil document | Not published | View |
| RCA - Strip Out North Elevation - Phase 1 - 2210-SPP-RCA-ZZ-DR-A-95-3004-S4-P01.pdfCouncil document | Not published | View |
| RCA - Strip Out Level 03 RCP - Phase 1 - 2210-SPP-RCA-03-DR-A-95-3505-S4-P01.pdfCouncil document | Not published | View |
| RCA - Strip Out Level 03 Floor Finishes - Phase 1 - 2210-SPP-RCA-03-DR-A-95-4005-S4-P01.pdfCouncil document | Not published | View |
| Masterplan - Demolition Access Plan - Level B1 - 2210-SPP-RCZ-0G-DR-A-95-1091-S4-P01.pdfCouncil document | Not published | View |
| Masterplan - Demolition Access Plan - Level 05 - 2210-SPP-RCZ-0G-DR-A-95-1097-S4-P01.pdfCouncil document | Not published | View |
| Masterplan - Demolition Access Plan - Level 04 - 2210-SPP-RCZ-0G-DR-A-95-1096-S4-P01.pdfCouncil document | Not published | View |
| Masterplan - Demolition Access Plan - Level 03 - 2210-SPP-RCZ-0G-DR-A-95-1095-S4-P01.pdfCouncil document | Not published | View |
| Masterplan - Demolition Access Plan - Level 02 - 2210-SPP-RCZ-0G-DR-A-95-1094-S4-P01.pdfCouncil document | Not published | View |
| Masterplan - Demolition Access Plan - Level 01 - 2210-SPP-RCZ-0G-DR-A-95-1093-S4-P01.pdfCouncil document | Not published | View |
| Masterplan - Demolition Access Plan - Level 0G - 2210-SPP-RCZ-0G-DR-A-95-1092-S4-P01.pdfCouncil document | Not published | View |
| 2210-SPP-RC-XX-ID-A-XX-6002 SPP Strip Out - Phase 1 - Drawings Issue Sheet.pdfCouncil document | Not published | View |
| SPPARC_Soft Strip Strategy Planning Document.pdfCouncil document | Not published | View |
| LBC Condition 22 Cover Letter.pdfCouncil document | Not published | View |
| ApplicationFormRedacted.pdfCouncil document | Not published | View |
| ACK_VALID_APPLICATIONCouncil document | Not published | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceWe haven’t collected any decision conditions for this application.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.