Council planning record

Replacement of all existing timber framed windows with new double glazed timber framed windows; replacement of timber doors; installation of 8no solar panels in the rear roofslope; replacement of existing roof covering with new roof tiles at roof level.

25 Orbain Road, London, SW6 7JZ

Decided: APPLICATION APPROVEDReference: 2025/00767/FULLondon Borough of Hammersmith & Fulham

Last published check: 18 Oct 2026, 20:01. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received

    Published milestoneCouncil source
  2. Validated

    Published milestoneCouncil source
  3. Registered

    Published milestoneCouncil source
  4. Statutory expiry date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided: APPLICATION APPROVED
Application type
Not published
Received
17 Mar 2025
Validated
18 Mar 2025
Determination deadline
10 Jul 2028
Local authority
London Borough of Hammersmith & Fulham

Application overview

Replacement of all existing timber framed windows with new double glazed timber framed windows; replacement of timber doors; installation of 8no solar panels in the rear roofslope; replacement of existing roof covering with new roof tiles at roof level.

Proposal details

Reference
2025/00767/FUL
Ward
Munster
Agent
glenn williams / Bluelime

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

25 Orbain Road, London, SW6 7JZ

This record has no verified map location.

Documents 25 of 25

DocumentPublishedAction
APPLICATIONFORMREDACTEDCouncil documentNot publishedView
LOCATIONPLANCouncil documentNot publishedView
25 ORBAIN ROAD - SHEET 02 - SITE PLANCouncil documentNot publishedView
SITEBLOCK PLAN - EXISTING_INCLUDED_IN_BLOCK PLAN OF THE SITECouncil documentNot publishedView
25 ORBAIN ROAD - SHEET - 04 - EXISTING FLOOR PLANSCouncil documentNot publishedView
25 ORBAIN ROAD - SHEET - 05 - EXISTING ELEVATIONSCouncil documentNot publishedView
25 ORBAIN ROAD - SHEET - 09 - EXISTING DOORS AND WINDOWS SCHEDULECouncil documentNot publishedView
25 ORBAIN ROAD - SHEET - 11 - EXISTING _ PROPOSED SASH HERITAGE WINDOWS DETAILSCouncil documentNot publishedView
LAYOUT PLAN - PROPOSED_INCLUDED_IN_LAYOUT PLAN - EXISTINGCouncil documentNot publishedView
25 ORBAIN ROAD - SHEET - 12 - EXISTING _ PROPOSED WINDOWS HERITAGE TIMBER CASEMECouncil documentNot publishedView
LAYOUT PLAN - PROPOSED_INCLUDED_IN_LAYOUT PLAN - EXISTING_29033756Council documentNot publishedView
25 ORBAIN ROAD - SHEET - 13 - EXISTING _ PROPOSED DOORS TIMBER DETAILSCouncil documentNot publishedView
LAYOUT PLAN - PROPOSED_INCLUDED_IN_LAYOUT PLAN - EXISTING_29033758Council documentNot publishedView
25 ORBAIN ROAD - CIL FORMCouncil documentNot publishedView
25 ORBAIN ROAD - DESIGN ACCESS AND HERITAGE STATEMENTCouncil documentNot publishedView
FLOOD RISK ASSESSMENT_INCLUDED_IN_DESIGN AND ACCESS STATEMENTCouncil documentNot publishedView
25 ORBAIN ROAD - SHEET - 03 - EXISTING 3D VIEWSCouncil documentNot publishedView
OFFICER'S FILE NOTECouncil documentNot publishedView
PROPOSED SCHEDULECouncil documentNot publishedView
PROPOSED ELEVATIONSCouncil documentNot publishedView
PROPOSED FLOOR PLANSCouncil documentNot publishedView
PROPOSED 3D VIEWCouncil documentNot publishedView
SOLAR PANEL DETAILSCouncil documentNot publishedView
PER.FULL PLANNING PERMISSIONCouncil documentNot publishedView
DELEGATED REPORT TEMPLATE - LIVECouncil documentNot publishedView

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Decided: APPLICATION APPROVED
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.