Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
25 Cardross Street, London, W6 0DP
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceErection of a rear roof extension, involving an increase in the ridge height by 150mm; erection of a rear extension at second floor level, over part of the existing back addition; removal of the remaining pitched roof of the existing back addition at second floor level to form a flat roof; installation of 2no. rooflights in the front roofslope.
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details25 Cardross Street, London, W6 0DP
This record has no verified map location.
| Document | Published | Action |
|---|---|---|
| LOCATIONPLANCouncil document | Not published | View |
| 25 CARDROSS ST W6 W CS 24 3 02 EXISTING FIRST FLOORCouncil document | Not published | View |
| 25 CARDROSS ST W6 W CS 24 3 03 EXISTING LOFTCouncil document | Not published | View |
| 25 CARDROSS ST W6 W CS 24 3 04 EXISTING SECTION AACouncil document | Not published | View |
| 25 CARDROSS ST W6 W CS 24 3 05 EXISTING SECTION BBCouncil document | Not published | View |
| 25 CARDROSS ST W6 W CS 24 3 06 EXISTING REAR ELEVATIONCouncil document | Not published | View |
| 25 CARDROSS ST W6 W CS 24 3 07 PROPOSED GROUND FLOORCouncil document | Not published | View |
| 25 CARDROSS ST W6 W CS 24 3 08A PROPOSED FIRST FLOORCouncil document | Not published | View |
| CIL 25 CARDROSS STREET W6 0DPCouncil document | Not published | View |
| FLOOD NOTES 25 CARDROSS STREET W6 0DPCouncil document | Not published | View |
| 25 CARDROSS ST W6 W CS 24 3 13 FRONT ELEVATIONSCouncil document | Not published | View |
| ENVIRONMENT AGENCY FLOOD RISKCouncil document | Not published | View |
| 25 CARDROSS ST W6 W CS 24 3 01 EXISTING GROUND FLOOR AND SITE PLANCouncil document | Not published | View |
| 25 CARDROSS ST W6 W CS 24 3 11 PROPOSED SECTION DDCouncil document | Not published | View |
| 25 CARDROSS ST W6 W CS 24 3 12A PROPOSED REAR ELEVATIONCouncil document | Not published | View |
| 25 CARDROSS ST W6 W CS 24 3 09A PROPOSED SECOND FLOORCouncil document | Not published | View |
| 25 CARDROSS ST W6 W CS 24 3 10A PROPOSED SECTION CCCouncil document | Not published | View |
| SITE LOCATION PLAN 25 CARDROSS STREET W6 0DPCouncil document | Not published | View |
| 25 CARDROSS STREET W6 0DP SITE BLOCK PLAN PROPOSEDCouncil document | Not published | View |
| 25 CARDROSS STREET W6 0DP SITE BLOCK PLAN EXISTINGCouncil document | Not published | View |
| DSCN0018Council document | Not published | View |
| DSCN0007Council document | Not published | View |
| 25 CARDROSS STREET W6 0DP FIRE PRECAUTIONS DRGS W CS 24 3 14 15 AND 16Council document | Not published | View |
| DESIGN AND ACCESS STATEMENT 25 CARDROSS STREET W6 0DPCouncil document | Not published | View |
| REVSIED PROPOSED FRONT ELEVATIONCouncil document | Not published | View |
| PER.FULL PLANNING PERMISSIONCouncil document | Not published | View |
| DELEGATED REPORT TEMPLATE - LIVECouncil document | Not published | View |
Documents open on the council website. Browse council documents if a link has changed.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
No related records were published in this section.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.