Council planning record

Replacement of all existing single glazed timber framed windows with new double glazed timber framed windows to the front elevation, and double glazed uPVC windows to the side and rear elevation; replacement of existing single glazed timber framed door and side window with new double glazed uPVC door and side window at ground floor level to the rear elevation.

99 St Stephen'S Avenue, London, W12 8JA

Decided: APPLICATION APPROVEDReference: 2024/01467/FULLondon Borough of Hammersmith & Fulham

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received

    Published milestoneCouncil source
  2. Validated

    Published milestoneCouncil source
  3. Registered

    Published milestoneCouncil source
  4. Statutory expiry date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided: APPLICATION APPROVED
Application type
Not published
Received
13 Jun 2024
Validated
14 Jun 2024
Determination deadline
5 Mar 2028
Local authority
London Borough of Hammersmith & Fulham

Application overview

Replacement of all existing single glazed timber framed windows with new double glazed timber framed windows to the front elevation, and double glazed uPVC windows to the side and rear elevation; replacement of existing single glazed timber framed door and side window with new double glazed uPVC door and side window at ground floor level to the rear elevation.

Proposal details

Reference
2024/01467/FUL
Ward
Coningham
Agent
Mr Joe Marshall / Silver Teal Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

99 St Stephen'S Avenue, London, W12 8JA

This record has no verified map location.

Documents 14 of 14

DocumentPublishedAction
NHG CIL FORM - 99 ST STEPHENS AVENUE W12Council documentNot publishedView
P01_99_ST_STEVE_AVENUE_EXISTING_ELEVATIONS_WINDOW_SCHEDULECouncil documentNot publishedView
SITEBLOCK PLAN - EXISTING_INCLUDED_IN_LAYOUT PLAN - EXISTINGCouncil documentNot publishedView
P02_99_ST_STEVE_AVENUE_PROPOSED_ELEVATIONS_WINDOW_SCHEDULECouncil documentNot publishedView
P03_99_ST_STEPHENS_AVENUE_SITE_LOCATION_PLANSCouncil documentNot publishedView
WINDT02 20MM STANDARD TIMBER SASH WITHOUT BARSCouncil documentNot publishedView
WINDT04 UPVC WINDOW CASEMENT SPEC DETAILCouncil documentNot publishedView
DOORDT02 UPVC SINGLE TOP BOTTOM GLAZED DOOR SPEC DETAILCouncil documentNot publishedView
OFFICER'S FILE NOTECouncil documentNot publishedView
WINDT05 UPVC SLIDING SASH DETAIL WITH BARS REVA.PDFCouncil documentNot publishedView
WINDT02 20MM STANDARD TIMBER SASH WITHOUT BARS REVA.PDFCouncil documentNot publishedView
P02_99_ST_STEVE_AVENUE_PROPOSED_ELEVATIONS_WINDOW_SCHEDULE_REVB.PDFCouncil documentNot publishedView
PER.FULL PLANNING PERMISSIONCouncil documentNot publishedView
DELEGATED REPORT TEMPLATE - LIVECouncil documentNot publishedView

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Decided: APPLICATION APPROVED
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.