Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
3 Blake Gardens, London, SW6 4QA
Last published check: 14 Oct 2026, 08:11. Check the council record for more recent changes.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceReplacement of existing natural slate roof coverings with new artificial slate tiles; installation of 2no. rooflights in the front roofslope; replacement of all existing rooflights with new uPVC rooflights; replacement of all existing windows with new double glazed uPVC windows; replacement of existing part glazed timber door with new double glazed timber door, to the front elevation at first floor level; replacement of existing part glazed timber panelled door with new solid timber panelled door, to the front elevation at ground floor level; re-sizing and replacement of an existing window, to the side elevation at first floor level; erection of a glazed pitched roof, to the side elevation at ground floor level; raising the sill height of an existing window, to the rear elevation of first floor back addition; alterations to the existing single storey rear extension to include, erection of a new flat roof including a rooflight following the removal of existing flat roof, raising the hei... read more
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details3 Blake Gardens, London, SW6 4QA
This record has no verified map location.
| Document | Published | Action |
|---|---|---|
| 3BG-001-EXISTING BASEMENT FLOOR PLANCouncil document | Not published | View |
| 3BG-002-EXISTING GROUND FLOOR PLANCouncil document | Not published | View |
| 3BG-003-EXISTING FIRST FLOOR PLANCouncil document | Not published | View |
| 3BG-004-EXISTING SECOND FLOOR PLANCouncil document | Not published | View |
| 3BG-005-EXISTING ROOF PLANCouncil document | Not published | View |
| 3BG-006-EXISTING FRONT ELEVATIONCouncil document | Not published | View |
| 3BG-007-EXISTING REAR ELEVATIONCouncil document | Not published | View |
| 3BG-008-EXISTING SECTION 1Council document | Not published | View |
| 3BG-009-EXISTING SECTION 2Council document | Not published | View |
| 3BG-010-PROPOSED BASEMENT FLOOR PLANCouncil document | Not published | View |
| 3BG-011-PROPOSED GROUND FLOOR PLANCouncil document | Not published | View |
| 3BG-012-PROPOSED FIRST FLOOR PLANCouncil document | Not published | View |
| 3BG-013-PROPOSED SECOND FLOOR PLANCouncil document | Not published | View |
| 3BG-014-PROPOSED ROOF PLANCouncil document | Not published | View |
| 3BG-015-PROPOSED FRONT ELEVATIONCouncil document | Not published | View |
| 3BG-016-PROPOSED REAR ELEVATIONCouncil document | Not published | View |
| 3BG-017-PROPOSED SECTION 1Council document | Not published | View |
| 3BG-018-PROPOSED SECTION 2Council document | Not published | View |
| 3BG - DESIGN AND ACCESS STATEMENTCouncil document | Not published | View |
| LOCATIONPLANCouncil document | Not published | View |
| 3BG-019-SITE PLANCouncil document | Not published | View |
| 3BG-007-EXISTING REAR ELEVATIONCouncil document | Not published | View |
| SUPERSEDED 3BG-006-EXISTING FRONT ELEVATIONCouncil document | Not published | View |
| 3BG-005-EXISTING ROOF PLANCouncil document | Not published | View |
| 3BG-004-EXISTING SECOND FLOOR PLANCouncil document | Not published | View |
| 3BG-003-EXISTING FIRST FLOOR PLANCouncil document | Not published | View |
| 3BG-002-EXISTING GROUND FLOOR PLANCouncil document | Not published | View |
| 3BG-001-EXISTING BASEMENT FLOOR PLANCouncil document | Not published | View |
| 3BG-009-EXISTING SECTION 2Council document | Not published | View |
| 3BG-008-EXISTING SECTION 1Council document | Not published | View |
| SUPERSEDED 3BG-012-PROPOSED FIRST FLOOR PLANCouncil document | Not published | View |
| SUPERSEDED 3BG-011-PROPOSED GROUND FLOOR PLANCouncil document | Not published | View |
| 3BG-010-PROPOSED BASEMENT FLOOR PLANCouncil document | Not published | View |
| FLOOD RISK ASSESSMENTCouncil document | Not published | View |
| SUPERSEDEDCouncil document | Not published | View |
| SUPERSEDEDCouncil document | Not published | View |
| 3BG-016-PROPOSED REAR ELEVATIONCouncil document | Not published | View |
| SUPERSEDED 3BG-015-PROPOSED FRONT ELEVATIONCouncil document | Not published | View |
| 3BG-014-PROPOSED ROOF PLANCouncil document | Not published | View |
| 3BG-013-PROPOSED SECOND FLOOR PLANCouncil document | Not published | View |
| REVISED EXISTING FRONT ELEVATIONCouncil document | Not published | View |
| REVISED PROPOSED GF PLANCouncil document | Not published | View |
| REVISED PROPOSED FF PLANCouncil document | Not published | View |
| SUPERSEDED REVISED PROPOSED FRONT ELEVATIONCouncil document | Not published | View |
| REVISED PROPOSED SECTIONCouncil document | Not published | View |
| REVISED PROPOSED SECTION 2Council document | Not published | View |
| REVISED PROPOSED FRONT ELEVATIONCouncil document | Not published | View |
| PER.FULL PLANNING PERMISSIONCouncil document | Not published | View |
| DELEGATED REPORT TEMPLATE - LIVECouncil document | Not published | View |
Documents open on the council website. Browse council documents if a link has changed.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
No related records were published in this section.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.