Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
19 Narborough Street, London, SW6 3AP
Last published check: 12 Oct 2026, 21:37. Check the council record for more recent changes.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceDemolition of the existing building with the exception of the front facade, and erection of a replacement four storey plus basement single family dwellinghouse. Withdrawn - ?206 transferred to 2023/01908/FUL
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details19 Narborough Street, London, SW6 3AP
This record has no verified map location.
| Document | Published | Action |
|---|---|---|
| LOCATIONPLANCouncil document | Not published | View |
| 19 NARBOROUGH STREET BASEMENT SECTION AACouncil document | Not published | View |
| 19 NARBOROUGH STREET BASEMENT STRUCTURE PROPOSALCouncil document | Not published | View |
| 19 NARBOROUGH STREET CONSTRUCTION SEQUENCE TYPICAL UNDERPINCouncil document | Not published | View |
| LAYOUT PLAN - PROPOSED_INCLUDED_IN_DETAIL DRAWINGCouncil document | Not published | View |
| 19 NARBOROUGH STREET CONSTRUCTION SEQUENCE UNDERPINCouncil document | Not published | View |
| 19 NARBOROUGH STREET SW6 PROPOSED BASEMENT GROUND FLOOR FIRST FLOORCouncil document | Not published | View |
| 19 NARBOROUGH STREET SW6 PROPOSED ELEVATIONS 2Council document | Not published | View |
| ELEVATION (REAR) - PROPOSED_INCLUDED_IN_ELEVATION (FRONT) - PROPOSEDCouncil document | Not published | View |
| ELEVATION (SIDE) - PROPOSED_INCLUDED_IN_ELEVATION (FRONT) - PROPOSEDCouncil document | Not published | View |
| 19 NARBOROUGH STREET SW6 PROPOSED SECOND FLOOR ROOFCouncil document | Not published | View |
| 19 NARBOROUGH STREET SW6 SECTION 2Council document | Not published | View |
| CIL_QUESTIONS.19 NARBOROUGH STREETCouncil document | Not published | View |
| 2013_02627_FUL-SITE_PLAN_NARBOROUGH_001-1079115Council document | Not published | View |
| 3824 - 19-21 NARBOROUGH STREET SW6 (ISSUE DRAWINGS 2023.05.31)Council document | Not published | View |
| BLOCK PLAN OF THE SITE_INCLUDED_IN_FLOOR PLANCouncil document | Not published | View |
| BOROUGH_WIDE_CONSERVATION_AREA_MAPCouncil document | Not published | View |
| CONSTRUCTION METHOD STATEMENT 19 NARBOROUGH STREET (2)Council document | Not published | View |
| DELTA CAVITY DRAIN SYSTEMCouncil document | Not published | View |
| DEMOLITION CONSTRUCTION METHOD CDB INTRO LETTERCouncil document | Not published | View |
| DEMOLITION METHOD STATEMENT CDB 1Council document | Not published | View |
| OTHER RELEVANT INFORMATION_INCLUDED_IN_NOISE IMPACT ASSESSMENTCouncil document | Not published | View |
| FLOOD RISK ASSESSMENT 19 AND 21 NARBOROUGH STREETCouncil document | Not published | View |
| INTRODUCTION LETTER - PLANNING CALCULATIONS - CIL 2Council document | Not published | View |
| LOCAL FRONT MANSARDS APPROVED AND RECENTLY BUILTCouncil document | Not published | View |
| SECTION_80_DEMOLITION_NOTICE.CDB 1Council document | Not published | View |
Documents open on the council website. Browse council documents if a link has changed.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
No related records were published in this section.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.