ApprovedCouncil status: Decided: APPLICATION APPROVED

Submission of a) a detailed method statement of temporary support of the structure during the works, b) a detailed method statement of the structural works themselves, c) brief method statements of how the structural integrity of the existing lath and plaster ceilings will be preserved, and how fireplace, panelling, stairs etc will be adapted, and d) details of any new fixtures and fittings such as internal doors, fireplaces, floor finishes, skirtings and cornicing, all pursuant to Condition 4; details and samples of all materials to be used on the external faces of the building, and the new front boundary treatment, pursuant to Condition 5; and detailed drawings, at a scale of no less than 1:20 in plan, section and elevation, of each new external windows and doors, pursuant to Condition 6 of listed building consent reference: 2022/00459/LBC dated 23rd December 2022.

45 St Peter'S Square, London, W6 9AA

London Borough of Hammersmith & FulhamReference 2023/00218/DLBC

Last published check: 3 Nov 2026, 02:42. Check the council record for more recent changes.

Status and dates

Last published check: 3 Nov 2026, 02:42 (UK)

  1. DoneReceived31 Jan 2023
  2. DoneValidated1 Feb 2023
  3. Not publishedConsultationNo date on council record
  4. Date set by councilTarget decision date21 Aug 2026
  5. DecidedDecided: APPLICATION APPROVEDNot published

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (4)
  1. Received

    Published milestoneCouncil source
  2. Validated

    Published milestoneCouncil source
  3. Registered

    Published milestoneCouncil source
  4. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Ward
Ravenscourt
Documents
17 published

Proposal

Submission of a) a detailed method statement of temporary support of the structure during the works, b) a detailed method statement of the structural works themselves, c) brief method statements of how the structural integrity of the existing lath and plaster ceilings will be preserved, and how fireplace, panelling, stairs etc will be adapted, and d) details of any new fixtures and fittings such as internal doors, fireplaces, floor finishes, skirtings and cornicing, all pursuant to Condition 4; details and samples of all materials to be used on the external faces of the building, and the new front boundary treatment, pursuant to Condition 5; and detailed drawings, at a scale of no less than 1:20 in plan, section and elevation, of each new external windows and doors, pursuant to Condition 6 of listed building consent reference: 2022/00459/LBC dated 23rd December 2022.

Reference
2023/00218/DLBC
Ward
Ravenscourt
Agent
Miss Tina Patel / FORMED ARCHITECTS & DESIGNERS

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • 21 - 040 - ST2-05-502Council documentNot publishedView
  • 21 - 040 - ST2-05-501Council documentNot publishedView
  • 21-040 METHOD STATEMENT 01Council documentNot publishedView
  • 21 - 040 - ST2-05-500Council documentNot publishedView
  • 1387-SDS-S-B1-7000-C01 LOWER GROUND FLOORCouncil documentNot publishedView
  • 1387-SDS-S-GF-7001-C01 UPPER GROUND FLOORCouncil documentNot publishedView
  • 1387-SDS-XX-S-5052-C01 DETAILSCouncil documentNot publishedView
  • 504 REV 02Council documentNot publishedView

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Decided: APPLICATION APPROVED
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.