Council planning record

Submission of details of the flood resilient design measures and sustainable drainage measures identified in the Design and Access Statement (Rev A, 10.09.2018) and Construction Method Statement (Green Structural Engineering, 18.04.2018), pursuant to Condition 14 of planning permission reference: 2018/01943/FUL dated 13th March 2020.

Land At Rigeley Mews, London

Decided: APPLICATION APPROVEDReference: 2022/03246/DETLondon Borough of Hammersmith & Fulham

Last published check: 8 Oct 2026, 23:43. Check the council record for more recent changes.

Application location

Land At Rigeley Mews, London

This record has no verified map location.

Application summary

Status
Decided: APPLICATION APPROVED
Application type
Not published
Received
7 Nov 2022
Validated
8 Nov 2022
Determination deadline
3 Jan 2026
Local authority
London Borough of Hammersmith & Fulham

Application overview

Submission of details of the flood resilient design measures and sustainable drainage measures identified in the Design and Access Statement (Rev A, 10.09.2018) and Construction Method Statement (Green Structural Engineering, 18.04.2018), pursuant to Condition 14 of planning permission reference: 2018/01943/FUL dated 13th March 2020.

Proposal details

Reference
2022/03246/DET
Ward
College Park And Old Oak
Agent
James Lusher / Lusher Architects

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 14 of 14

DocumentPublishedAction
L22_114_04 - PROPOSED MICRODRAINAGE NETWORK 25.10.2022Council documentNot publishedView
L22_114_04 - 210 P1 - HYDROBRAKE CONSTRUCTION DETAILSCouncil documentNot publishedView
L22_114_04 - 209 P1 - PRIVATE PAVEMENT CONSTRUCTION DETAILSCouncil documentNot publishedView
L22_114_04 - 205 P1 - ENGINEERING LAYOUT (GROUND FLOOR)Council documentNot publishedView
L22_114_04 - 208 P1 - PRIVATE DRAINAGE CONSTRUCTION DETAILS SHEET 2 OF 2Council documentNot publishedView
L22_114_04 - 207 P1 - PRIVATE DRAINAGE CONSTRUCTION DETAILS SHEET 1 OF 2Council documentNot publishedView
L22_114_04 - 206 P1 - ENGINEERING LAYOUT (BASEMENT)Council documentNot publishedView
2223-031_950_PLANNING CONDITION REPORTCouncil documentNot publishedView
L22_114_04 - 205 P2 - ENGINEERING LAYOUT (GROUND FLOOR)Council documentNot publishedView
L22_114_04_503 P3Council documentNot publishedView
L22_114_04_504 P3Council documentNot publishedView
L22_114_04 - 206 P2 - ENGINEERING LAYOUT (BASEMENT)Council documentNot publishedView
DELEGATED OFFICER REPORTCouncil documentNot publishedView
PER. DETAILS TO MEET COND. FULL/OUT APP.Council documentNot publishedView

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received

    Published milestoneCouncil source
  2. Validated

    Published milestoneCouncil source
  3. Registered

    Published milestoneCouncil source
  4. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Decided: APPLICATION APPROVED
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.