Council planning record

Replacement of the existing roof with a new additional floor at roof level in connection with the creation of 1 x 1 bedroom self-contained flat; installation of 3no rooflights in the front roofslope and 3no rooflights above the main flat roof at roof level.

Second Floor, 130 King Street, London, W6 0QU

Decided: REFUSEReference: 2022/03088/FULLondon Borough of Hammersmith & Fulham

Last published check: 9 Oct 2026, 02:42. Check the council record for more recent changes.

Application location

Second Floor, 130 King Street, London, W6 0QU

This record has no verified map location.

Application summary

Status
Decided: REFUSE
Application type
Not published
Received
23 Oct 2022
Validated
25 Oct 2022
Determination deadline
20 Dec 2025
Local authority
London Borough of Hammersmith & Fulham

Application overview

Replacement of the existing roof with a new additional floor at roof level in connection with the creation of 1 x 1 bedroom self-contained flat; installation of 3no rooflights in the front roofslope and 3no rooflights above the main flat roof at roof level.

Proposal details

Reference
2022/03088/FUL
Ward
Hammersmith Broadway
Agent
Mrs Natalia Plenasio / Omega Next Generation

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 21 of 21

DocumentPublishedAction
07-PROPOSED PLANSCouncil documentNot publishedView
13-FIRE STRATEGYCouncil documentNot publishedView
12- PROPOSED BIKE AND REFUSE STORECouncil documentNot publishedView
06-PROPOSED PLANSCouncil documentNot publishedView
11- PROPOSED BIKE AND REFUSE STORECouncil documentNot publishedView
130 KINGS STREET NATURAL LIGHTING ANALYSIS - DAYLIGHT FACTOR_REDCouncil documentNot publishedView
02-EXISTING PLANSCouncil documentNot publishedView
04-EXISTING SECTION AND REAR ELEVATIONCouncil documentNot publishedView
00-LOCATION PLANCouncil documentNot publishedView
DESIGN-AND-ACCESS-STATEMENT 130 KING STREETCouncil documentNot publishedView
01-SITE PLANCouncil documentNot publishedView
08-PROPOSED SECTION AND REAR ELEVATIONCouncil documentNot publishedView
05-EXISTING FRONT ELEVATIONCouncil documentNot publishedView
130 KING STREET-POINT OF VIEW FROM STREETCouncil documentNot publishedView
FORM_1_CIL_ADDITIONAL_INFORMATIONREVCouncil documentNot publishedView
03-EXISITNG PLANSCouncil documentNot publishedView
09-PROPOSED SECTIONCouncil documentNot publishedView
10- PROPOSED FRONT ELEVATIONCouncil documentNot publishedView
OFFICER'S FILE NOTECouncil documentNot publishedView
REFUSAL OF FULL PLANNING PERMISSIONCouncil documentNot publishedView
DELEGATED REPORT TEMPLATE - LIVECouncil documentNot publishedView

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received

    Published milestoneCouncil source
  2. Validated

    Published milestoneCouncil source
  3. Registered

    Published milestoneCouncil source
  4. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Decided: REFUSE
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.