Variation of Condition 2 (approved drawings) of planning permission reference : 2021/03211/FUL dated 19th July 2022 for the "Installation and screening of 2no. new air source combo heat pumps on the roof of the Oncology Building; installation and screening of 2no. new air source combo heat pumps on the roof of the X-ray Building; installation of an external plant area on a raised deck adjacent to the Tower block; installation of a new substation; and installation of pipework to existing external fabric to serve all new heat pumps, including to the full extent of the north elevation of the Tower Block from ground up to the 17th floor." Amendments sought are an extension, consisting of a fourth bay, to the approved sub-station which is required to provide the additional electrical loads for an additional air source heat pump as part of the hospital's decarbonisation scheme to replace the existing steam and chilled water systems.

Charing Cross Hospital Fulham Palace Road, London, W6 8RF

Decided: APPLICATION APPROVEDReference: 2022/02774/VARLondon Borough of Hammersmith & Fulham

Last published check: 9 Oct 2026, 07:35. Check the council record for more recent changes.

Application location

Charing Cross Hospital Fulham Palace Road, London, W6 8RF

This record has no verified map location.

Application summary

Status
Decided: APPLICATION APPROVED
Application type
Not published
Received
28 Sept 2022
Validated
7 Oct 2022
Determination deadline
12 Dec 2025
Local authority
London Borough of Hammersmith & Fulham

Application overview

Variation of Condition 2 (approved drawings) of planning permission reference : 2021/03211/FUL dated 19th July 2022 for the "Installation and screening of 2no. new air source combo heat pumps on the roof of the Oncology Building; installation and screening of 2no. new air source combo heat pumps on the roof of the X-ray Building; installation of an external plant area on a raised deck adjacent to the Tower block; installation of a new substation; and installation of pipework to existing external fabric to serve all new heat pumps, including to the full extent of the north elevation of the Tower Block from ground up to the 17th floor." Amendments sought are an extension, consisting of a fourth bay, to the approved sub-station which is required to provide the additional electrical loads for an additional air source heat pump as part of the hospital's decarbonisation scheme to replace the existing steam and chilled water systems.

Proposal details

Reference
2022/02774/VAR
Ward
Fulham Reach
Agent
Architon LLP / Architon LLP

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 8 of 8

DocumentPublishedAction
1091-105 - SUBSTATION EXTENSION - GROUND AND FIRST FLOOR PLANSCouncil documentNot publishedView
1091-107 - SUBSTATION EXTENSION - SECTIONS-ELEVATIONSCouncil documentNot publishedView
1091-106 - SUBSTATION EXTENSION - ROOF PLANCouncil documentNot publishedView
1091 SUBSTATION EXTENSION DASCouncil documentNot publishedView
LOCATION PLANCouncil documentNot publishedView
SITE PLANCouncil documentNot publishedView
PER VARY/DELETE CONDITIONS FULL/OUT APPCouncil documentNot publishedView
DELEGATED REPORT TEMPLATE - LIVECouncil documentNot publishedView

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received

    Published milestoneCouncil source
  2. Validated

    Published milestoneCouncil source
  3. Registered

    Published milestoneCouncil source
  4. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Decided: APPLICATION APPROVED
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.