Material amendment to planning permission reference: 2018/00858/FUL dated 11th May 2018 for the "Erection of a front roof extension; erection of a rear extension at second floor level, over part of the existing back addition; erection of a rear extension at first floor level, over part of the existing ground floor rear extension; formation of a roof terrace at second floor level with the installation of a glazed screen on top of the flat roof of the proposed first floor rear extension; and excavation of the front garden to form a lightwell, in connection with the creation of a new basement." Amendment sought is the additional excavation of part of the rear garden to form a lightwell, in connection with the creation of a new basement under the whole footprint of the property.
Material amendment to planning permission reference: 2018/00858/FUL dated 11th May 2018 for the "Erection of a front roof extension; erection of a rear extension at second floor level, over part of the existing back addition; erection of a rear extension at first floor level, over part of the existing ground floor rear extension; formation of a roof terrace at second floor level with the installation of a glazed screen on top of the flat roof of the proposed first floor rear extension; and excavation of the front garden to form a lightwell, in connection with the creation of a new basement." Amendment sought is the additional excavation of part of the rear garden to form a lightwell, in connection with the creation of a new basement under the whole footprint of the property.
Reference
2019/00628/FUL
Ward
Sands End
Agent
Mr Ninian MacQueen / Rk.Ppr.Scrs
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.