Reinstatement of monumental stone entrance steps up to the Listed Town Hall's original public entrance, the creation of a bridge link connecting the ramped walkway to the first floor level of the Listed Town Hall, with a new entrance being constructed through the central window of the Nigel Playfair Room and the construction of enclosed glazed link at ground floor level between the Listed Town Hall and the new civic office building for council staff use.
Hammersmith Town Hall Extension King Street, London, W6 9JU
Reinstatement of monumental stone entrance steps up to the Listed Town Hall's original public entrance, the creation of a bridge link connecting the ramped walkway to the first floor level of the Listed Town Hall, with a new entrance being constructed through the central window of the Nigel Playfair Room and the construction of enclosed glazed link at ground floor level between the Listed Town Hall and the new civic office building for council staff use.
Reference
2010/03466/LBC
Ward
Hammersmith Broadway
Agent
Miss Catherine Seddon / King Sturge LLP
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.