ApprovedCouncil status: Decided

Details submitted to discharge schedule 2, Requirement 10 - Surface Water Drainage [Stage 5d] in relation to the National Grid (North London Reinforcement Project) Order 2014.

National Grid Overhead Electric Line Part Adjacent To River Lee Navigation, Brimsdown Substation, Mollison Avenue, Enfield

London Borough of EnfieldReference 26/02480/DCODevelopment Consent Order

Last published check: 24 Nov 2026, 00:09. Check the council record for more recent changes.

Status and dates

Last published check: 24 Nov 2026, 00:09 (UK)

  1. DoneReceived11 Jun 2026
  2. DoneValidated11 Jun 2026
  3. Not publishedConsultationNo date on council record
  4. Date set by councilTarget decision date6 Aug 2026
  5. DecidedGranted18 Sept 2026

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (11)
  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Decision Issued Date

    Published milestoneCouncil source
  7. Decision Made Date

    Published milestoneCouncil source
  8. Permission Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Development Consent Order
Ward
Enfield Lock
Documents
37 published

Proposal

Details submitted to discharge schedule 2, Requirement 10 - Surface Water Drainage [Stage 5d] in relation to the National Grid (North London Reinforcement Project) Order 2014.

Reference
26/02480/DCO
Alternative references
PP-14659187
Ward
Enfield Lock
Agent
Arup

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • Officer ReportOfficer Report21 Sept 2026View
  • TECHNICAL NOTE (APPENDIX G - ZBC19)Drainage Documentation18 Sept 2026View
  • Decision NoticeDecision Notice18 Sept 2026View
  • Application Form - Without Personal DataApplication Form - Without Personal Data11 Jun 2026View
  • DRAINAGE TECHNICAL COVERING REPORT (STAGE 5D)Drainage Documentation11 Jun 2026View
  • TEMPORARY WORKS SURFACE WATER DRAINAGEDrawing11 Jun 2026View
  • EXISTING OVERLAND FLOW ROUTESDrawing11 Jun 2026View
  • GREENFIELD RUNOFF RATE ESTIMATION TOOLDrainage Documentation11 Jun 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Granted

Appeal status: Unknown

Decision Notice
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.