Awaiting decisionCouncil status: Application in Progress
Details submitted pursuant to reference 25/01664/FUL: dust management plan (17), remediation strategy (19). risk assessment and method statement (27), river improvements (29), surface lake drain down strategy (30), SuDS (31), groundwater flood risk technical note (33) and flood risk technical note (34) in respect of redevelopment of existing golf course and construction of a surfing complex comprising: (1) Outdoor surf lake (Use Class F2); (2) two-storey clubhouse including terraces, with cafe, surf shop, health and well-being facilities, changing facilities, offices (Use Class E), surfing operations and solar panels; (3) external plant, machine and store rooms structures for surf generation (Sui Generis); (4) renewal and alteration of existing campsite and the provision of additional accommodation and ancillary buildings (Sui Generis) with communal space; (5) use of land for pop up temporary outdoor events, with associated temporary structures; (6) free standing shelter with viewing deck; (7) engineering works including mounding and bunds; (8) public park, view point structure, pavilion and external play areas; (9) Pop up seasonal structures; (10) leisure facilities involving a pump track, skate bowl, sports courts, skate routes and external play areas; and (11) associated soft and hard landscaping, boundaries, lighting, flood lighting, parking and access routes.
Lee Valley Golf Course And Camping & Caravan Park 61 Meridian Way Edmonton London N9 0AR
Details submitted pursuant to reference 25/01664/FUL: dust management plan (17), remediation strategy (19). risk assessment and method statement (27), river improvements (29), surface lake drain down strategy (30), SuDS (31), groundwater flood risk technical note (33) and flood risk technical note (34) in respect of redevelopment of existing golf course and construction of a surfing complex comprising: (1) Outdoor surf lake (Use Class F2); (2) two-storey clubhouse including terraces, with cafe, surf shop, health and well-being facilities, changing facilities, offices (Use Class E), surfing operations and solar panels; (3) external plant, machine and store rooms structures for surf generation (Sui Generis); (4) renewal and alteration of existing campsite and the provision of additional accommodation and ancillary buildings (Sui Generis) with communal space; (5) use of land for pop up temporary outdoor events, with associated temporary structures; (6) free standing shelter with viewing deck; (7) engineering works including mounding and bunds; (8) public park, view point structure, pavilion and external play areas; (9) Pop up seasonal structures; (10) leisure facilities involving a pump track, skate bowl, sports courts, skate routes and external play areas; and (11) associated soft and hard landscaping, boundaries, lighting, flood lighting, parking and access routes.
Reference
26/00872/CND
Alternative references
PP-14730814
Ward
Jubilee
Agent
Turley Associates Ltd
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.