Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
England · Local authority
Explore collected planning applications and decisions for London Borough of Ealing. Search an address, application reference or proposal to find a record.
4,206 approved · 732 refused · 168 withdrawn. Received dates in our records: 18 Jan 2019 to 12 Oct 2026. Most recent record check: 14 Oct 2026. Counts reflect the last collected status; some records may be out of date.
Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.
Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.
Interactive planning map loads with JavaScript. Dataset sources are linked below.
Download Article 4 coverage for all authorities (CSV)
Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.
Sources: Planning Data conservation areas and Article 4 direction areas. Contains public sector information licensed under the Open Government Licence v3.0.
10 And 10A Connaught Road West Ealing W13 0TF
Received 5 Aug 202619A The Broadway Greenford UB6 9PN
Received 6 Aug 202656 Wood End Gardens Northolt UB5 4QL
Received 6 Aug 20265 First Floor Flat Leighton Road West Ealing W13 9EL
Received 6 Aug 202631 The Vale Acton W3 7RR
Received 6 Aug 202623 Marlow Road Southall UB2 4NS
Received 4 Aug 20267 Portland Road Southall UB2 4BX
Received 4 Aug 202648 Creswick Road Acton W3 9HF
Received 6 Aug 202622 The Avenue West Ealing W13 8PH
Received 6 Aug 2026Beaver Industrial Park, Unit 2C Brent Road Southall UB2 5FB
Received 6 Aug 2026Land Adjacent To Manhattan Business Park West Gate Ealing W5 1UP
Received 6 Aug 202649 Flat 2 York Road Acton W3 6TS
Received 6 Aug 2026Haven Green Baptist Church Haven Green Ealing W5 2UP
Received 6 Aug 2026Cresta Court ,Hill Court & 4 Adjoining Buildings Hanger Lane Ealing W5 3DE
Received 6 Aug 2026Cresta Court Hanger Lane Ealing W5 3DE
Received 6 Aug 2026Garages Rear Of 106 Regina Road Southall UB2 5PP
Received 7 Aug 2026Warehouse Dagmar Mews Southall UB2 5PU
Received 7 Aug 2026Daphne Court 44 Castlebar Road Ealing W5 2DF
Received 7 Aug 202674 Studley Grange Road Hanwell W7 2LX
Received 7 Aug 202643 Colebrooke Avenue West Ealing Ealing W13 8JZ
Received 7 Aug 202633A Woodville Gardens Ealing W5 2LL
Received 7 Aug 2026Exchange Plaza 58 Uxbridge Road Ealing W5 2ST
Received 7 Aug 202651 Mill Hill Road Acton W3 8JF
Received 23 Jul 20268 Bowes Road Acton W3 7AA
Received 5 Aug 2026Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.
View all applicationsStart with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.
How to search planning applications
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

Property research · 13 min read
Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.
These figures describe applications collected by PlanningTrack for London Borough of Ealing, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.
The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.
Check collection coverage