Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
England · Local authority
Explore collected planning applications and decisions for London Borough of Ealing. Search an address, application reference or proposal to find a record.
4,159 approved · 725 refused · 166 withdrawn. Received dates in our records: 18 Jan 2019 to 12 Oct 2026. Most recent record check: 14 Oct 2026. Counts reflect the last collected status; some records may be out of date.
Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.
Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.
Interactive planning map loads with JavaScript. Dataset sources are linked below.
Download Article 4 coverage for all authorities (CSV)
Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.
Sources: Planning Data conservation areas and Article 4 direction areas. Contains public sector information licensed under the Open Government Licence v3.0.
Unit A, Tera 40 Auriol Drive Greenford UB6 0TP
Received 15 Jun 20262 Manor Road West Ealing W13 0LH
Received 16 Jun 202642 Cuckoo Avenue Hanwell W7 1BX
Received 16 Jun 2026Land Between Park View And Cloister Road Western Avenue Acton W3 6XZ
Received 16 Jun 2026Advertising Right Of Atelier House North Circular Road Park Royal NW10 7SX
Received 16 Jun 2026Garages Rear Of Long Acre Court Argyle Road West Ealing London W13 0DA
Received 16 Jun 202659 Eaton Rise Ealing W5 2HE
Received 16 Jun 202613-19 The Green Southall UB2 4AH
Received 16 Jun 202617-34 Curtis Drive Acton W3 6YL
Received 16 Jun 2026Fleming Road / Whitecote Road Golf Links Estate Southall UB1 3NR
Received 16 Jun 202687 Mattock Lane Ealing W5 5BJ
Received 16 Jun 2026159 Park Avenue Southall UB1 3AL
Received 16 Jun 20261 Flat 5 Melville Villas Road Acton W3 8QX
Received 16 Jun 20268 Perimeade Road Perivale UB6 7AR
Received 12 Jun 20264-6 Ealing Road Northolt UB5 5HT
Received 17 Jun 20268 Eastfields Road Acton W3 0AA
Received 17 Jun 202624 Horsenden Lane South Perivale UB6 8AD
Received 17 Jun 202618 Dorset Avenue Southall UB2 4HF
Received 17 Jun 202616 Montague Road West Ealing W13 8HA
Received 17 Jun 202616 Montague Road West Ealing W13 8HA
Received 17 Jun 2026Ealing Hospital Uxbridge Road Southall UB1 3HW
Received 17 Jun 2026Rear Of Brent & Glebe Court Church Road Hanwell W7 3BZ
Received 17 Jun 20268 Oakfield Gardens Greenford UB6 8SD
Received 9 Jun 2026Beverley Place 38 Eaton Rise Ealing W5 2ET
Received 17 Jun 2026Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.
View all applicationsStart with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.
How to search planning applications
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

Property research · 13 min read
Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.
These figures describe applications collected by PlanningTrack for London Borough of Ealing, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.
The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.
Check collection coverage