Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
England · Local authority
Explore collected planning applications and decisions for London Borough of Ealing. Search an address, application reference or proposal to find a record.
4,133 approved · 724 refused · 164 withdrawn. Received dates in our records: 18 Jan 2019 to 12 Oct 2026. Most recent record check: 14 Oct 2026. Counts reflect the last collected status; some records may be out of date.
Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.
Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.
Interactive planning map loads with JavaScript. Dataset sources are linked below.
Download Article 4 coverage for all authorities (CSV)
Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.
Sources: Planning Data conservation areas and Article 4 direction areas. Contains public sector information licensed under the Open Government Licence v3.0.
100 Western Road Southall UB2 5EA
Received 20 May 20267 Third Avenue Acton W3 7RT
Received 20 May 20262 Broomfield Road West Ealing W13 9AP
Received 20 May 202614 Madeley Road Ealing W5 2LH
Received 20 May 2026Stairs (between Nos. 49 And 51 Wells House Road) Connecting Wells House Road And Old Oak Common Lane London NW10 6ED
Received 19 May 20268 Stour Avenue Southall UB2 4HL
Received 11 May 20263 Marlow Road Southall UB2 4NS
Received 20 May 20263 Marlow Road Southall UB2 4NS
Received 20 May 20261492 Greenford Road Greenford UB6 0HP
Received 20 May 2026152 Dormers Wells Lane Southall UB1 3JB
Received 20 May 202612 Green Avenue West Ealing W13 9RW
Received 13 May 202654 Lady Margaret Road Southall UB1 2RB
Received 13 May 2026105 Abbotts Road Southall UB1 1HR
Received 20 May 2026The Arches Business Centre Merrick Road Southall UB2 4AU
Received 20 May 20261 Green Drive Southall UB1 3AY
Received 21 May 2026Flat 11 382 Uxbridge Road Ealing London W5 3LH
Received 21 May 202613 Wolverton Gardens Ealing W5 3LJ
Received 21 May 202613 Thurlow Road Hanwell W7 2JG
Received 21 May 2026Freedom Worship Centre Western Road Southall UB2 5EA
Received 14 May 2026Royal Borough Of Kensington And Chelsea Cemetery Uxbridge Road Hanwell W7 3PP
Received 21 May 202610 Church Road Acton W3 8PP
Received 21 May 2026142 Hambrough Road Southall UB1 1JE
Received 21 May 2026Ground Floor 35A Inglis Road Ealing W5 3RL
Received 21 May 20264 Aston Road Ealing W5 2RL
Received 21 May 2026Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.
View all applicationsStart with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.
How to search planning applications
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

Property research · 13 min read
Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.
These figures describe applications collected by PlanningTrack for London Borough of Ealing, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.
The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.
Check collection coverage