Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
England · Local authority
Explore collected planning applications and decisions for London Borough of Ealing. Search an address, application reference or proposal to find a record.
3,685 approved · 651 refused · 144 withdrawn. Received dates in our records: 18 Jan 2019 to 8 Oct 2026. Most recent record check: 12 Oct 2026. Counts reflect the last collected status; some records may be out of date.
Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.
Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.
Interactive planning map loads with JavaScript. Dataset sources are linked below.
Download Article 4 coverage for all authorities (CSV)
Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.
Sources: Planning Data conservation areas and Article 4 direction areas. Contains public sector information licensed under the Open Government Licence v3.0.
84 High Street Acton W3 6QX
Received 9 Oct 202574 Mulgrave Road Ealing W5 1LE
Received 10 Oct 202576 Carlisle Avenue Acton W3 7NL
Received 10 Oct 202510 Chilton Avenue Ealing W5 4RU
Received 10 Oct 20258 Kelvin Gardens Southall UB1 2SX
Received 10 Oct 202521 West Avenue Southall UB1 2AW
Received 10 Oct 202556 Humes Avenue Hanwell W7 2LP
Received 10 Oct 202579 Humes Avenue Hanwell W7 2LJ
Received 10 Oct 20255 Palm Grove Ealing W5 4AF
Received 10 Oct 20254 Otter Road Greenford UB6 9DX
Received 10 Oct 2025109 North Road Southall UB1 2JR
Received 10 Oct 20257 Almond Avenue Ealing W5 4AA
Received 10 Oct 2025Norwood Green Playing Field Tentelow Lane Southall UB2 4LF
Received 10 Oct 2025Vehicle Repair Workshop Workshop And Premises White Swan Garage Adelaide Road Southall UB2 5PX
Received 23 Sept 2025Vehicle Repair Workshop Workshop And Premises White Swan Garage Adelaide Road Southall UB2 5PX
Received 23 Sept 2025211 Cavendish Avenue West Ealing W13 0JZ
Received 10 Oct 20251A Kingscote Road Chiswick W4 5LJ
Received 10 Oct 2025205-207 The Broadway Southall UB1 1NB
Received 10 Oct 20252A Venetia Road Ealing W5 4JD
Received 10 Oct 202543 Osterley Park Road Southall UB2 4BN
Received 10 Oct 202554 Avalon Road West Ealing W13 0BN
Received 11 Oct 20259 Sovereign Close Ealing W5 1DE
Received 13 Oct 202532 King Street Southall UB2 4DB
Received 13 Oct 202592 Cavendish Avenue West Ealing W13 0JN
Received 13 Oct 2025Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.
View all applicationsStart with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.
How to search planning applications
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

Property research · 13 min read
Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.
These figures describe applications collected by PlanningTrack for London Borough of Ealing, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.
The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.
Check collection coverage