Council planning record

Partial details of part (i) of condition 7 (Construction Logistics Plans) and part (i) of condition 8 (Construction and Environmental Management Plans), in relation to the demolition and piling mat works at 1 Minerva Road only; Partial details of parts (ii) and (iii) of condition 7 (Construction Logistics Plans) and parts (ii) and (iii) of condition 8 (Construction and Environmental Management Plans), in relation to the installation of the buried pipework along Minerva Road and North Acton Road only; and Partial details of condition 11 (HS2 Safeguarding), in relation to 1 Minerva Road and works along Minerva Road and North Acton Road only; pursuant to planning permission reference 25/0184/FUMOPDC dated 25/03/2026, for 'Development associated with the Old Oak and Park Royal Energy Network (OPEN) district heating network, comprising: Demolition of a warehouse building at 1 Minerva Road, London, NW10 6HJ, and erection of a purpose built energy centre building; Laying of a network of underground heat pipes; Erection of a crossover gantry to carry the pipework over existing railway tracks, running parallel to the Park Royal Road Overbridge; and Other associated works.' (Out of Borough)

Energy Centre Building, Pipework (western Arm) Pipework (eastern Arm) 1 Minerva Road Park Royal NW10 6HJ

Pending ConsiderationReference: 263686OPDCOBLondon Borough of Ealing

Last published check: 12 Oct 2026, 23:42. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Determination Deadline

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Pending Consideration
Application type
OPDC Consultation by Other Boroughs
Received
1 Oct 2026
Validated
1 Oct 2026
Determination deadline
21 Oct 2026
Local authority
London Borough of Ealing

Application overview

Partial details of part (i) of condition 7 (Construction Logistics Plans) and part (i) of condition 8 (Construction and Environmental Management Plans), in relation to the demolition and piling mat works at 1 Minerva Road only; Partial details of parts (ii) and (iii) of condition 7 (Construction Logistics Plans) and parts (ii) and (iii) of condition 8 (Construction and Environmental Management Plans), in relation to the installation of the buried pipework along Minerva Road and North Acton Road only; and Partial details of condition 11 (HS2 Safeguarding), in relation to 1 Minerva Road and works along Minerva Road and North Acton Road only; pursuant to planning permission reference 25/0184/FUMOPDC dated 25/03/2026, for 'Development associated with the Old Oak and Park Royal Energy Network (OPEN) district heating network, comprising: Demolition of a warehouse building at 1 Minerva Road, London, NW10 6HJ, and erection of a purpose built energy centre building; Laying of a network of underground heat pipes; Erection of a crossover gantry to carry the pipework over existing railway tracks, running parallel to the Park Royal Road Overbridge; and Other associated works.' (Out of Borough)

Proposal details

Reference
263686OPDCOB
Ward
North Acton

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Energy Centre Building, Pipework (western Arm) Pipework (eastern Arm) 1 Minerva Road Park Royal NW10 6HJ

This record has no verified map location.

View council map

Documents 0 of 0

No documents match this view.

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.